New Launch - India Real Estate Report 2026.

ORANJE CASTLE PHASE-3

SURAJ INFRAVENTURES PVT LTD

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jan 2025

Completion pending

Pending

9th Jan 2030

Registration No.

UPRERAPRJ597105/01/2025

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ597105/01/2025
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2025-01-01
Completion Date2030-01-09
Total Area (sqm)7219
Project Cost (Lacs)9677
Duration (Months)61
Registration Fee41500

Promoter Details

Promoter NameSURAJ INFRAVENTURES PVT LTD
Promoter IDUPRERAPRM724
Mobile99********

Project Team

rolename
ArchitectHARSH CHAUHAN
ContractorSURAJ INFRAVENTURES PVT LTD
Structural EngineerS.N SHARAN

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraKHASRA N0-249, 253, 255, 317, 3287129.79

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER-B13 BHK1121.72-
TOWER-B13 BHK1115.25-
TOWER-B13 BHK1127.17-
TOWER-B23 BHK1127.63-
TOWER-B23 BHK1116.75-
TOWER-B23 BHK1125.02-
TOWER-B33 BHK1121.72-
TOWER-B33 BHK1115.25-
TOWER-B33 BHK1127.17-
TOWER-B43 BHK1127.42-
TOWER-B43 BHK1116.75-
TOWER-B43 BHK1125.02-
TOWER-B53 BHK1121.89-
TOWER-B53 BHK1149.44-
TOWER-B63 BHK1127.42-
TOWER-B63 BHK1150.95-
TOWER-B73 BHK1121.83-
TOWER-B73 BHK1149.44-
TOWER-B83 BHK1127.53-
TOWER-B83 BHK1146.62-
TOWER-B114 BHK1211.69-
TOWER-C13 BHK1121.72-
TOWER-C13 BHK1115.25-
TOWER-C13 BHK1127.17-
TOWER-C23 BHK1127.43-
TOWER-C23 BHK1116.75-
TOWER-C23 BHK1125.40-
TOWER-C33 BHK1121.72-
TOWER-C33 BHK1115.25-
TOWER-C33 BHK1127.17-
TOWER-C43 BHK1127.42-
TOWER-C43 BHK1116.75-
TOWER-C43 BHK1125.40-
TOWER-C53 BHK1121.89-
TOWER-C53 BHK1115.53-
TOWER-C53 BHK1127.24-
TOWER-C63 BHK1127.42-
TOWER-C63 BHK1116.75-
TOWER-C63 BHK1125.40-
TOWER-C73 BHK1121.89-
TOWER-C73 BHK1115.53-
TOWER-C73 BHK1126.93-
TOWER-C83 BHK1127.43-
TOWER-C83 BHK1116.75-
TOWER-C83 BHK1125.40-
TOWER-C93 BHK1121.82-
TOWER-C93 BHK1150.06-
TOWER-C103 BHK1127.85-
TOWER-C103 BHK1149.34-
TOWER-C154 BHK1229.27-
TOWER-D13 BHK1140.80-
TOWER-D13 BHK1112.67-
TOWER-D13 BHK1124.51-
TOWER-D23 BHK1133.98-
TOWER-D23 BHK1115.10-
TOWER-D33 BHK1140.76-
TOWER-D33 BHK1112.67-
TOWER-D33 BHK1124.50-
TOWER-D43 BHK1134.66-
TOWER-D43 BHK1115.10-
TOWER-D43 BHK1128.21-
TOWER-D53 BHK1140.82-
TOWER-D53 BHK1112.57-
TOWER-D53 BHK1124.42-
TOWER-D63 BHK1134.66-
TOWER-D63 BHK1115.10-
TOWER-D63 BHK1128.21-
TOWER-D73 BHK1140.82-
TOWER-D73 BHK1112.57-
TOWER-D73 BHK1124.42-
TOWER-D83 BHK1134.65-
TOWER-D83 BHK1115.10-
TOWER-D83 BHK1128.21-
TOWER-D94 BHK1224.28-
TOWER-D104 BHK1227.47-
TOWER-D134 BHK1217.81-
TOWER-E13 BHK1108.81-
TOWER-E12 BHK1100.41-
TOWER-E23 BHK1113.18-
TOWER-E22 BHK198.29-
TOWER-E33 BHK1108.82-
TOWER-E32 BHK1100.40-
TOWER-E43 BHK1113.18-
TOWER-E42 BHK198.29-
TOWER-E53 BHK1108.83-
TOWER-E52 BHK1100.40-
TOWER-E63 BHK1113.18-
TOWER-E62 BHK199.44-
TOWER-E73 BHK1108.80-
TOWER-E72 BHK199.33-
TOWER-E83 BHK1174.05-
TOWER-E93 BHK1168.39-
TOWER-E103 BHK1174.70-
TOWER-F13 BHK1130.10-
TOWER-F23 BHK1128.10-
TOWER-F33 BHK1130.10-
TOWER-F43 BHK1128.10-
TOWER-F53 BHK1113.18-
TOWER-F52 BHK198.70-
TOWER-F63 BHK1108.79-
TOWER-F62 BHK198.60-
TOWER-F73 BHK1113.18-
TOWER-F72 BHK198.70-
TOWER-B93 BHK1178.98-
TOWER-B94 BHK1184.47-
TOWER-C113 BHK1169.52-
TOWER-C113 BHK1170.66-
TOWER-C123 BHK1177.45-
TOWER-C123 BHK1201.55-
TOWER-C133 BHK1169.52-
TOWER-C133 BHK1170.38-
TOWER-C143 BHK1177.47-
TOWER-C143 BHK1201.45-
TOWER-C164 BHK1293.14-
TOWER-D113 BHK1177.26-
TOWER-D123 BHK1202.58-
TOWER-D123 BHK1153.94-
TOWER-D14PENTHOUSE1297.47-
TOWER-F83 BHK1188.2-
TOWER-F83 BHK1134.35-
TOWER-F103 BHK1134.41-
TOWER-F103 BHK1188.21-
TOWER-F123 BHK1134.43-
TOWER-F123 BHK1188.21-
TOWER-F143 BHK1134.41-
TOWER-F143 BHK1188.21-
TOWER-D114 BHK1216.53-
TOWER-D23 BHK1128.21-

Development Works

work_namedescription
Demarcation of PlotsWE HAVE ONE PLOT OF SIZE 7219 SQM HAVING 1 MAIN ENTRANCE AND 1 EXIT GATE FROM THE 45 M WIDE FRONT ROAD.
Boundary Wall2M HIGH AND 230 MM THICK RCC/MS 1 SECTION WORK WHICH GIVE A BEAUTIFUL ICONIC DESIGN BOUNDARY WALL AND WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WIL BE COATED.
Road WorkCONCRETE /APEX ROAD WILL BE MADE AT THE SITE , THE BASE OF THE ROAD WILL BE FILLED BY RED MURUM , AFTER THAT 2 LAYER OF AGREEGATE WILL BE LAYED TO MAKE SURE THAT THET THE TOAD FROM THE MAIN ENTRANCE / EXIT GATE WE HAVE 100MM THICK 6MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
FootpathsWE WOULD PROVIDE FOOTHPATH THROUGH BRICK TILE. ALL FOOTHPATH IN THE PROJECT WILL BE IN COMBINATION SIZE THICNESS OF 65MM , 80MM LAID OVER 150MM.
Water Supply Including Drinking Water FacilitiesWE WILL PROVIDE PUMPS FOR THE REQUIREMENT OF BLOCKS THROUGH PIPELINES AND PUMPED TO OVER HEAD WATER TANK . THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROM THE SAID OVER HEAD WATER TANK..
Sewer SystemMODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM WHEN COME INTO FORCE.
DrainSTORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECT WITH MUNICIPAL DRAIN LINE.
ParksWE WILL PROVIDE GREEN AREA WITH THE DIFFRENT ACTIVITIES AND WILL HAVE GAMING FACILITIS FOR KIDS
Tree PlantingWE WILL PROVIDE MANY TYPE OF TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
Design For Electric Supply Including Street LightingWE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LIGHTING, FOUNDATION, STP, PUMP ROOM ETC.
Community BuildingsWE WILL PROVIDE COMMUNITY HALL AND CLUB
Treatment and Disposal System of Sewage and Sullage waterMODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
Solid Waste Management And Disposal SystemSOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STORED IN GARBAGE ROOM, RECYCLABLE SHALL BE PROCESSED IN THE COMPOSE MACHINE TO MAKE.
Water Conservation SystemWE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMTION AND IMPROVE THE GROUND WATER LVEL.
Energy Management System Including Use of Renewable EnergyWE WILL USE LED LIGHT FITTING IN INTERNAL AREA AS WELL AS SOLAR LIGHTS. IN PUMP ROOM ALSO ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTOR.
Fire Protection And Fire Safety SystemFIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPROVISION PROVIDED.
Emergency Evacuation ServicesWE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS.
Other Miscellaneous WorkN/S

Bank Details

Bank NamePUNJAB NATIONAL BANK
BranchPUNJAB NATIONAL BANK, LUCKNOW
Branch AddressSPECIAL RETAIL, FINANCE BRANCH GOMTI NAGAR, LUCKNOW
Account HolderSURAJ INFRAVENTURES PVT LTD COLLECTION ACCOUNT ORANJE CASTLE PHASE-3
Account Number4483002900000136
IFSC CodePUNB0448300

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy