New Launch - India Real Estate Report 2026.

ORO Elements

ORO CONSTRUCTIONS PVT LTD

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Oct 2019

Project completed

Completed

8th Oct 2024

Registration No.

UPRERAPRJ951368

Project Type

Residential

District

Lucknow

Taluka

Bakshi Ka Talab**

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ951368
Project StatusCompleted
Project CategoryResidential
DistrictLucknow
TalukaBakshi Ka Talab**
Start Date2019-10-01
Completion Date2024-10-08
Total Area (sqm)10117
Project Cost (Lacs)7132
Duration (Months)61
Registration Fee56000

Promoter Details

Promoter NameORO CONSTRUCTIONS PVT LTD
Promoter IDUPRERAPRM15
Mobile94********

Project Team

rolename
ArchitectRakesh Sharma
ContractorDaksh Tech Projects Pvt. Ltd
Structural EngineerT.D Aneja

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra652P10117

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A13 BHK559.86-
A13 BHK159.94-
A12 BHK249.43-
A23 BHK559.86-
A22 BHK249.43-
A33 BHK559.86-
A33 BHK159.94-
A32 BHK249.43-
A43 BHK559.86-
A43 BHK159.94-
A42 BHK249.43-
A53 BHK559.86-
A53 BHK159.94-
A52 BHK249.43-
A63 BHK559.86-
A63 BHK159.94-
A62 BHK249.43-
A73 BHK559.86-
A73 BHK159.94-
A72 BHK249.43-
A83 BHK559.86-
A83 BHK159.94-
A82 BHK249.43-
A93 BHK559.86-
A93 BHK159.94-
A92 BHK249.43-
A103 BHK559.86-
A103 BHK159.94-
A102 BHK249.43-
A113 BHK559.86-
A113 BHK159.94-
A112 BHK249.43-
A123 BHK559.86-
A123 BHK159.94-
A122 BHK249.43-
B13 BHK559.86-
B13 BHK159.94-
B23 BHK559.86-
B23 BHK159.94-
B22 BHK249.43-
B33 BHK559.86-
B33 BHK159.94-
B32 BHK249.43-
B43 BHK559.86-
B43 BHK159.94-
B42 BHK249.43-
B53 BHK559.86-
B53 BHK159.94-
B52 BHK249.43-
B63 BHK559.86-
B62 BHK249.43-
B73 BHK559.86-
B73 BHK159.94-
B72 BHK249.43-
B83 BHK559.86-
B83 BHK159.94-
B82 BHK249.43-
B93 BHK559.86-
B93 BHK159.94-
B92 BHK249.43-
B103 BHK559.86-
B103 BHK159.94-
B102 BHK249.43-
B113 BHK559.86-
B113 BHK159.94-
B112 BHK249.43-
B123 BHK559.86-
B123 BHK159.94-
B122 BHK249.43-
C13 BHK559.86-
C13 BHK159.94-
C12 BHK249.43-
C23 BHK559.86-
C23 BHK159.94-
C22 BHK249.43-
C33 BHK559.86-
C33 BHK159.94-
C32 BHK249.43-
C43 BHK559.86-
C43 BHK159.94-
C42 BHK249.43-
C53 BHK559.86-
C53 BHK159.94-
C52 BHK249.43-
C63 BHK559.86-
C63 BHK159.94-
C62 BHK249.43-
C73 BHK559.86-
C73 BHK159.94-
C72 BHK249.43-
C83 BHK559.86-
C83 BHK159.94-
C82 BHK249.43-
C93 BHK559.86-
C93 BHK159.94-
C92 BHK249.43-
C103 BHK559.86-
C103 BHK159.94-
C102 BHK249.43-
C113 BHK559.86-
C113 BHK159.94-
C112 BHK249.43-
C123 BHK559.86-
C123 BHK159.94-
C122 BHK249.43-
A23 BHK159.94-
B63 BHK159.94-
B12 BHK249.43-

Development Works

work_namedescription
Demarcation of PlotsGroup Housing Plot is being demarcated at the site as per the approved layout plan.
Boundary WallBoundary wall of the entire project shall be constructed
Road WorkSemi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM
FootpathsFootpaths shall be paving by CC pavers or earthen footpath
Water Supply Including Drinking Water FacilitiesWater supply by terrace tank with medium density polyethylene piping system. Permission to abstract ground water through tube well will be procured at the time of operational phase of the project.
Sewer SystemRCC hume pipes for Sewerage system
DrainRCC hume pipes for drainage system
ParksGreen spaces will be developed as per approved plan
Tree Planting52(nos) of trees will be planted
Design For Electric Supply Including Street LightingElectrical infrastructure will be developed as per electrical drawing
Community BuildingsClub will be developed with all the facilities/amenities within the township. Though if desired the facility of the same can be availed on chargeable basis.
Treatment and Disposal System of Sewage and Sullage waterOwn MBBR- System STP
Solid Waste Management And Disposal SystemCollection space in the STP area. The disposal will be done by the Nagar Nigam vendor. NOC from Nagar Nigam Procured ( attached for reference)
Water Conservation SystemRain water Harvesting System
Energy Management System Including Use of Renewable EnergySolar water heating System will be installed.
Fire Protection And Fire Safety SystemFire safety system will be installed as per provisional NOC no- UPFS/2019/5313/LCK/LUCKNOW/308/CFO, given by the fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPlot for school, Commercial, has been provided within the township ORO City
Emergency Evacuation ServicesExit signage and fire staircase being proposed in the approved drawing
Other Miscellaneous WorkCCTV survelliance system will be provided on entry/Exit gate. Guard room will be provided on the gate.

Bank Details

Bank NamePunjab National Bank
BranchVibhuti Khand
Branch AddressVibhuti Khand, Gomtinagar, Lucknow (UP) - 226010
Account HolderOro Constructions Pvt. Ltd.
Account Number6193005500000094
IFSC CodePUNB0619300

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy