Pintail Park City - Phase 3 Plots
PINTAIL INFRACON LLP
Lucknow, Uttar Pradesh
Approved
28th Oct 2022
Pending
12th Apr 2027
Registration No.
UPRERAPRJ396035
Project Type
Mixed
District
Lucknow
Taluka
Mohanlalganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ396035 |
| Project Status | New |
| Project Category | Mixed |
| District | Lucknow |
| Taluka | Mohanlalganj |
| Start Date | 2022-10-28 |
| Completion Date | 2027-04-12 |
| Total Area (sqm) | 128261 |
| Project Cost (Lacs) | 6037 |
| Duration (Months) | 54 |
| Registration Fee | 969750 |
Promoter Details
| Promoter Name | PINTAIL INFRACON LLP |
| Promoter ID | UPRERAPRM39580 |
| Mobile | 95******** |
Project Team
| role | name |
|---|---|
| Architect | Mr Pankaj Sangwan |
| Contractor | Jai Maa Ambey |
| Structural Engineer | NA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1118 | 1720 |
| Khasra | 1116, 1115 | 1605 |
| Khasra | 1115, 1116 | 1605 |
| Khasra | 1080, 1109, 1082, 1117 | 5590 |
| Khasra | 1067 | 1580 |
| Khasra | 1080/1206 | 1110 |
| Khasra | 1055 PART | 1966 |
| Khasra | 1061, 1119 | 4012 |
| Khasra | 1071, 1075 PART | 1240 |
| Khasra | 1068, 1085 | 2030 |
| Khasra | 1189 | 901 |
| Khasra | 1128 | 840 |
| Khasra | 26, 27 | 11689 |
| Khasra | 1061 | 804 |
| Khasra | 1118 | 1725 |
| Khasra | 1123 | 2190 |
| Khasra | 1096 PART | 345 |
| Khasra | 1045/1198 PART, 1065 PART, 1066, 1048, 1048/1199, 1117, 1052, 1084, 1118 | 12778 |
| Khasra | 1057 PART, 1060 | 18212 |
| Khasra | 1073 PART, 1074 PART | 1800 |
| Khasra | 1110 | 1664 |
| Khasra | 1120 | 7500 |
| Khasra | 1061, 1082, 1053 | 2600 |
| Khasra | 28 | 4230 |
| Khasra | 1105 PART | 575 |
| Khasra | 1056 PART | 1278 |
| Khasra | 1058 PART | 5370 |
| Khasra | 1189 | 5060 |
| Khasra | 1082 | 1580 |
| Khasra | 11, 12PART, 38 PART | 10430 |
| Khasra | 31 PART, 40 | 4410 |
| Khasra | 39 , 41 PART, 34 PART | 6900 |
| Khasra | 1118, 1076 PART, 1070 PART | 2925 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | THE PLOTS WILL BE DEMARCATED BY CONCRETE PILLERS TO ALL 4 SIDES OF THE PLOT BOUNDARY , TO THE EXACT SHAPE , SIZE AND ORIENTATION AS PER SANCTIONED MAP BY LUCKNOW DEVELOPMENT AUTHORITY. |
| Boundary Wall | A 2.4 METER HIGH PRE-FABRICATED BOUNDARY WALL WILL BE CONSTRUCTED WITH DEEP FOUNDATION ALONG WITH BARBED WIRE FENCING AT THE TOP. |
| Road Work | CONCRETE ROADS WITH 150-200MM GSB, 100-150MM WMM, 75-100MM PCC AND 100-125 MM TRIMIX WHEREEVER APPLICABLE AS PER APPROVED LAYOUT. |
| Footpaths | AN M-15-M30 GRADE OF PAVER BLOCK/INTERLOCKING TILES WILL BE LAID IN THE PROJECTFOR WALKING AREAS. TILES WILL BE 60MM, THICK AND THE COLOUR PATTERNS WILL BE LASTING. |
| Water Supply Including Drinking Water Facilities | A POTABLE GROUND WATER SUPPLY THROUGH PUMPING ARRANGEMENTS WILL BE DELIVERED TO THE OVER HEAD TANK OF 450,000 LITRES CAPACITY. THE WATER FROM THERE WILL BE DEVILERED THROUGH UNDERGROUND DOMESTIC WATER SUPPLY LINE (UPVC) OF 110MM. |
| Sewer System | SEWAGE WILL BE COLLECTED THROUGH A RCC-NC3 PIPE (300-350MM) ARRANGEMENT, U BENDS AND INSPECTION CHAMBERSLEADING TO SEWERAGE TREATMENTS PLANT (STP). |
| Drain | A SURFACE DRAIN WATER WILL BE COLLECTED THROUGH RCC NC3 PIPE OF 450-600 MM AND WILL BE RELEASED TO STORM WATER LINE FOR DISCHARGE. |
| Parks | THE GREEN AREAS WILL BE LANDSCAPED WITH HARD AND SOFT LANDSCAPING AS PER DESIGN. THE PARKS WILL HAVE FOOTHPATHS, SITTING, AREAS AND PLAY AREA FOR CHILDRENS. |
| Tree Planting | THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIOBS OF THE PROJECT AND ALONG THE BOUNDARY WALL. |
| Design For Electric Supply Including Street Lighting | ELECTRICAL LAYOUT AND CAPACITY WILL BE INSTALLED TO FUFFICE THE DOMESTICS USE. ALL ELECTRICAL CABLING WILL BE UNDERGROUND AND STREET LIGHTS WILL BE AS PER WORKING DRAWINGS. |
| Community Buildings | NA. |
| Treatment and Disposal System of Sewage and Sullage water | ALL WASTE OF SEWER LINE TO BE COLLECTED AT STP, AFTER TREATMENT, TREATED WATER TO BE USED FOR WATERING OF THE GREEN AREAS. RWH LINE IS PLANNED TO COLLECT WATER FROM DRAIN AND TO BE DIRECTED TO MULTIPLE RECHARGE PITS. IRRIGATION OF PLANT BY FLUSH-WATER SYSTEM, AS PER SANCTION LAYOUT. |
| Solid Waste Management And Disposal System | ALL WASTE OF SEWER LINE TO BE COLLECTED AT STP, GARBAGE COLLECTION TO BE DONE THROUGH AUTHORISED AGENCY AND TO BE DISPOSED AT GARBAGE DISPOSAL AREA AS PER SANCTION PLAN. |
| Water Conservation System | RAIN WATER HARVESTING LINE TO BE LAID , IRRIGATIONOF PLANT BY FLUSH-WATER SYSTEM, AS PER SANCTIONED LAYOUT RWH LINE IS PLANNED TO COLLECT WATER FROM DRAIN AND TO BE DIRECTED TO MULTIPLE RECHARGE PITS. IRRIGATION OF PLANTS BY FLUSH -WATER SYSTEM AS PER SANCTIONED LAYOUT. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | HDFC BANK LTD |
| Branch | NIRALA NAGAR |
| Branch Address | GROUND FLOOR , COMMERCIAL PLOT NO 3, NIRALA NAGAR, LUCKNOW |
| Account Holder | PI LLP COLL A/C PINTAIL PARK CITY PH3 PLOTS |
| Account Number | 5020008186952 |
| IFSC Code | HDFC0006998 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in