New Launch - India Real Estate Report 2026.

PMAY Sector I, Basantkunj Part-C

Lucknow Development Authority

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jan 2022

Completion pending

Pending

20th Aug 2026

Registration No.

UPRERAPRJ442621

Project Type

Residential

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ442621
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaLucknow
Start Date2022-01-01
Completion Date2026-08-20
Total Area (sqm)15924
Project Cost (Lacs)5000
Duration (Months)56
Registration Fee85000

Promoter Details

Promoter NameLucknow Development Authority
Promoter IDUPRERAPRM10102
Mobile99********

Project Team

rolename
ArchitectShri Nitin Mittal CTP LDA
ContractorLucknow Development Authority
Structural EngineerPratap Shankar Mishra Executive Engineer

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra138, 139, 508, 509,510, 511, 51215505.96

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block-31GF1 BHK1224.720
Block-3111 BHK1224.72-
Block-3121 BHK1224.72-
Block-3131 BHK1224.72-
Block-33GF1 BHK1224.720
Block-3311 BHK1224.72-
Block-3321 BHK1224.72-
Block-3331 BHK1224.72-
Block-34GF1 BHK1224.720
Block-3411 BHK1224.72-
Block-3421 BHK1224.72-
Block-3431 BHK1224.72-
Block-35GF1 BHK1224.720
Block-3511 BHK1224.72-
Block-3521 BHK1224.72-
Block-3531 BHK1224.72-
Block-36GF1 BHK1224.720
Block-3611 BHK1224.72-
Block-3621 BHK1224.93-
Block-3631 BHK1224.72-
Block-37GF1 BHK1224.720
Block-3711 BHK1224.72-
Block-3721 BHK1224.72-
Block-3731 BHK1224.72-
Block-38GF1 BHK1224.720
Block-3821 BHK1224.72-
Block-3831 BHK1224.72-
Block-39GF1 BHK1224.720
Block-3911 BHK1224.72-
Block-3921 BHK1224.72-
Block-3931 BHK1224.72-
Block-3811 BHK1224.72-
Block-40GF1 BHK1224.720
Block-4011 BHK1224.72-
Block-4021 BHK1224.72-
Block-4031 BHK1224.72-
Block-41GF1 BHK1224.720
Block-4111 BHK1224.72-
Block-4121 BHK1224.72-
Block-4131 BHK1224.72-
Block-44GF1 BHK1224.720
Block-4411 BHK1224.93-
Block-4421 BHK1224.72-
Block-4431 BHK1224.72-
Block-45GF1 BHK1224.720
Block-4511 BHK1224.72-
Block-4521 BHK1224.72-
Block-4531 BHK1224.72-
Block-46GF1 BHK1224.720
Block-4611 BHK1224.72-
Block-4621 BHK1224.72-
Block-4631 BHK1224.72-
Block-62GF1 BHK1224.720
Block-6211 BHK1224.72-
Block-6221 BHK1224.72-
Block-6231 BHK1224.72-
Block-27GF1 BHK1224.720
Block-2711 BHK1224.72-
Block-2721 BHK1224.72-
Block-2731 BHK1224.72-
Block-28GF1 BHK1224.720
Block-2811 BHK1224.72-
Block-2821 BHK1224.72-
Block-2831 BHK1224.72-

Development Works

work_namedescription
Demarcation of PlotsNot Applicable
Boundary WallThere is no boundary wall is proposed for the project.
Road WorkRoads of width 9.0 or more has to be constructed with base concrete having carriage way width 3.75m. Space between drain and both eadges of road will remain kachcha and flower-trees like amaltash or kusum will be planted on one side of road. Roads having width less than 9.0 m( i.e 6. 0m and 7.50m) has to be constructed with base concrete having 3.50 m wide carriage way. Space between drain and both eadges of road will remain kachcha. Road having width less than 4.50 m has to be constructed with 80 mm thick rubber molded tile with concrete base. CC roads of scheme have to be constructed with Ready Mix Concrete as per provisions of IRC: SP: 62 – 2014. The passage between building block and road will be made with 80 mm thick rubber moulded tile with base of concrete.
FootpathsInterlocking paver block is proposed for footpaths.
Water Supply Including Drinking Water FacilitiesAll water supply line from out let of pump house has to be laid of HDPE pipe of required size as per design.
Sewer Systemhas to be laid as per the design and standards with DWC-HDPE pipe.
DrainDrain system also will be constructed as per sanctioned plan and site requirements.
Parksthe parks boundary will be made with grill-wall with RCC Column upto 90cm height from ground level. And RCC plinth level will remain 45 cm maximum. No path-way or jogging track will be made within park and only grass will be planted. 80 mm thick interlocking tile with sand base has to laid round the building blocks between the building blocks. Parking space for each house has to be provided as per building-bye-laws, with 80mm thick interlocking paver blocks with concrete base. All work has to carried out with required specifications of PMAY-(U) Guidelines, UPPWD, Building Bylaws and NBC Guidelines.
Tree PlantingNot Applicable.
Design For Electric Supply Including Street Lightingfor residential blocks, work as per the design. Electrification work includes connection fron LT line to meter panel in staircase of building block and from meter panel through MCB and bus bar to each house has to be done.
Community BuildingsNot Applicable.
Treatment and Disposal System of Sewage and Sullage waterSewage will be dispose in STP in Basantkunj Youjna.
Solid Waste Management And Disposal SystemAfter completion of the project infrastructure It will be handed over to the local municipal corporation for solid waste management and disposal system.
Water Conservation SystemRain water Harvesting is proposed for water conservation system.
Energy Management System Including Use of Renewable EnergyNot applicable.
Fire Protection And Fire Safety SystemAs per Fire Department and NBFC norms the building is less than 30m of the heights so fire protection and fire safety works is not applicable for the project.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable.
Emergency Evacuation ServicesNot applicable
Other Miscellaneous WorkNot Applicable.

Bank Details

Bank NameHDFC BANK LTD.
BranchLUCKNOW-ALIGANJ
Branch AddressA-1/21, SECTOR-B, Opp. NEHRU BAL VATIKA, ALIGANJ LUCKNOW-226024
Account HolderSECRETARY LDA LKO PMAY SEC I PART C
Account Number50100148826285
IFSC CodeHDFC0000412

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy