New Launch - India Real Estate Report 2026.

Prominent Mall

PROMINENT DEVELOPERS

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Mar 2021

Project completed

Completed

6th Jan 2026

Registration No.

UPRERAPRJ864629

Project Type

Commercial

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ864629
Project StatusCompleted
Project CategoryCommercial
DistrictLucknow
TalukaLucknow
Start Date2021-03-01
Completion Date2026-01-06
Total Area (sqm)7419
Project Cost (Lacs)4300
Duration (Months)59
Registration Fee85000

Promoter Details

Promoter NamePROMINENT DEVELOPERS
Promoter IDUPRERAPRM146203
Mobile90********

Project Team

rolename
ArchitectArjjwa Khare
ContractorProminent Developers
Structural EngineerSanjeev

Land Details

typekhasra_or_plot_noarea_sqmt
Khasrapart of 416, 4179293

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
MallBSMNTSHOP1334.67-
MallBSMNTSHOP1264.32-
MallBSMNTSHOP1412.9-
MallBSMNTSHOP1227.38-
MallBSMNTSHOP1490.27-
MallGFSHOP153.960
MallGFSHOP169.090
MallGFSHOP269.430
MallGFSHOP469.220
MallGFSHOP154.040
MallGFSHOP1126.840
MallGFSHOP1281.570
MallGFSHOP126.270
MallGFSHOP126.090
MallGFSHOP1501.570
Mall1SHOP153.96-
Mall1SHOP269.43-
Mall1SHOP169.09-
Mall1SHOP469.22-
Mall1SHOP154.04-
Mall1SHOP1412.9-
Mall1SHOP126.27-
Mall1SHOP126.09-
Mall1SHOP1500.93-
Mall2SHOP124.68-
Mall2SHOP231.8-
Mall2SHOP131.46-
Mall2SHOP130.91-
Mall2SHOP170.39-
Mall2SHOP268.65-
Mall2SHOP153.58-
Mall2SHOP1219.22-
Mall2SHOP1191.32-
Mall2SHOP126.27-
Mall2SHOP126.09-
Mall2SHOP132.52-
Mall2SHOP158.63-
Mall2SHOP144.39-
Mall2SHOP136.47-
Mall2SHOP120.83-
Mall3OTHER12426-
Mall4OTHER11163-

Development Works

work_namedescription
Demarcation of PlotsPlot demarcated via boundary wall
Boundary Wall10 Feet High boundary wall is proposed along with the plot perimeter
Road Work6 Meter wide road is proposed in the building setback
FootpathsDesignated entry for pedestrian via footpath has been proposed
Water Supply Including Drinking Water FacilitiesSource of water supply 1. Primary Source - Municipal Source 2. Secondary source- Borewell 3. Tertiary source- Tanker Intake provision for worst case
Sewer System1. The soil waste generated from each water closet, urinal etc. is carried out through separate soil vertical stack into inspection chamber / sewer Manhole. a. Grease Separation Grease generated from the kitchen shall be separated and disposal off via prefabricated HDPE/SS grease separator unit with or without grinder arrangement. b. Sewage Treatment Plant - Based on MBBR / SBR technology of capacity 50 KLD
DrainDrainage - Vented Dual Pipe System
ParksMinimum 15 percent open area as green park has been proposed
Tree PlantingEvergreen plants will be planted in the planned green areas
Design For Electric Supply Including Street Lighting11KVHT single point connection is proposed.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSullage - The waste generated from floor traps, shower, kitchen, wash basins etc. is carried through separate waste stack into the gully trap. The gully trap shall discharge the waste into the sewer manhole. Sewage and Sullage disposal - The sewage and sullage is discharged into the main sewerage line which is routed towards the sewage treatment plant.
Solid Waste Management And Disposal SystemFor solid waste management municipal approved waste service provider will be deployed
Water Conservation SystemFlushing water supply - cater for the flushing demands. TSE shall be used. Gravity Feed supply. Horticulture water supply - TSE (Treated Sewage Effluent) will be used to cater for the horticulture demands.
Energy Management System Including Use of Renewable EnergyEnergy Management System is proposed which provides flexibility of monitoring energy from all electrical feeders and key energy performance parameters on hourly / daily basis through notifications. On grid solar PV system of 100 kW is proposed considering 5 percent sanction load
Fire Protection And Fire Safety SystemFire Extinguishers, Internal/External Hydrants, Wet Riser System, Automatic Sprinkler System, Compartmentation - Physical, water based and retractable curtain, Wet chemical system, Gas Suppression system, Gas leak detection system
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation Servicesa. An Addressable fire alarm system with voice evacuation system for complete facility has been proposed. b. Directional Sounders will be provided to guide occupants to nearest exit in case of emergency. c. Addressable fire alarm system with digital voice evacuation system is proposed which monitors and generates alarm in case of any advent of fire or smoke. d. Manual Call Points with push buttons shall be installed in the lobbies under a breakable glass enclosure painted red with control module. e. Repeater fire alarm panels have been proposed at guard room. f. Voice evacuation system generates pre-recorded evacuation messages in advent of any emergency. g. Zone wise announcements are possible to avoid stampede.
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameICICI Bank
BranchAliganj Branch
Branch Address39, Chandralok, Aliganj, Lucknow - 226022
Account HolderProminent Developers
Account Number32505008790
IFSC CodeICIC0000325

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy