PURVANCHAL CAPITAL TOWER
PURVANCHAL PROJECTS PRIVATE LIMITED
Lucknow, Uttar Pradesh
Approved
5th Sept 2020
Completed
30th Jun 2024
Registration No.
UPRERAPRJ849094
Project Type
Commercial
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ849094 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2020-09-05 |
| Completion Date | 2024-06-30 |
| Total Area (sqm) | 5210 |
| Project Cost (Lacs) | 9601 |
| Duration (Months) | 46 |
| Registration Fee | 63000 |
Promoter Details
| Promoter Name | PURVANCHAL PROJECTS PRIVATE LIMITED |
| Promoter ID | UPRERAPRM73757 |
| Mobile | 75******** |
Project Team
| role | name |
|---|---|
| Architect | DEVELOPMENT CONSULTANTS - MR. ARUN PATWAL |
| Contractor | MR. SHAH ALAM |
| Structural Engineer | ER. SADANAND OJHA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | TC A1 | 5209.75 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| CAPITAL TOWER | BSMNT | OTHER | 0 | 0 | - |
| CAPITAL TOWER | BSMNT2 | OTHER | 0 | 0 | - |
| CAPITAL TOWER | GF | SHOP | 1 | 82.78 | 0 |
| CAPITAL TOWER | GF | SHOP | 2 | 60.39 | 0 |
| CAPITAL TOWER | GF | SHOP | 4 | 82.62 | 0 |
| CAPITAL TOWER | GF | SHOP | 1 | 126.73 | 0 |
| CAPITAL TOWER | GF | SHOP | 1 | 144.65 | 0 |
| CAPITAL TOWER | GF | SHOP | 1 | 83.07 | 0 |
| CAPITAL TOWER | 1 | SHOP | 1 | 144.27 | - |
| CAPITAL TOWER | 1 | SHOP | 4 | 82.62 | - |
| CAPITAL TOWER | 1 | SHOP | 3 | 144.88 | - |
| CAPITAL TOWER | 2 | SHOP | 1 | 144.27 | - |
| CAPITAL TOWER | 2 | SHOP | 4 | 82.62 | - |
| CAPITAL TOWER | 2 | SHOP | 3 | 144.88 | - |
| CAPITAL TOWER | 3 | OTHER | 4 | 38.15 | - |
| CAPITAL TOWER | 3 | OTHER | 1 | 104.91 | - |
| CAPITAL TOWER | 3 | OTHER | 4 | 40.75 | - |
| CAPITAL TOWER | 3 | OTHER | 4 | 40.7 | - |
| CAPITAL TOWER | 3 | OTHER | 2 | 40.9 | - |
| CAPITAL TOWER | 3 | OTHER | 2 | 49.82 | - |
| CAPITAL TOWER | 3 | OTHER | 1 | 105.81 | - |
| CAPITAL TOWER | 4 | OTHER | 0 | 0 | - |
| CAPITAL TOWER | 5 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 5 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 5 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 5 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 5 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 6 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 6 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 6 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 6 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 6 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 7 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 7 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 7 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 7 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 7 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 8 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 8 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 8 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 8 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 8 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 9 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 9 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 9 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 9 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 9 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 10 | OTHER | 2 | 41.03 | - |
| CAPITAL TOWER | 10 | OTHER | 4 | 40.96 | - |
| CAPITAL TOWER | 10 | OTHER | 4 | 41.37 | - |
| CAPITAL TOWER | 10 | OTHER | 4 | 41.51 | - |
| CAPITAL TOWER | 10 | OTHER | 2 | 38.77 | - |
| CAPITAL TOWER | 11 | OTHER | 0 | 0 | - |
| CAPITAL TOWER | 12 | OTHER | 2 | 38.25 | - |
| CAPITAL TOWER | 12 | OTHER | 4 | 37.31 | - |
| CAPITAL TOWER | 12 | OTHER | 2 | 38.41 | - |
| CAPITAL TOWER | 12 | OTHER | 4 | 38.55 | - |
| CAPITAL TOWER | 12 | OTHER | 2 | 35.99 | - |
| CAPITAL TOWER | 12 | OTHER | 2 | 38.4 | - |
| CAPITAL TOWER | 13 | OTHER | 2 | 38.25 | - |
| CAPITAL TOWER | 13 | OTHER | 4 | 37.31 | - |
| CAPITAL TOWER | 13 | OTHER | 2 | 38.41 | - |
| CAPITAL TOWER | 13 | OTHER | 4 | 38.55 | - |
| CAPITAL TOWER | 13 | OTHER | 2 | 35.99 | - |
| CAPITAL TOWER | 13 | OTHER | 2 | 38.4 | - |
| CAPITAL TOWER | 14 | OTHER | 2 | 38.25 | - |
| CAPITAL TOWER | 14 | OTHER | 4 | 37.31 | - |
| CAPITAL TOWER | 14 | OTHER | 2 | 38.41 | - |
| CAPITAL TOWER | 14 | OTHER | 4 | 38.55 | - |
| CAPITAL TOWER | 14 | OTHER | 2 | 35.99 | - |
| CAPITAL TOWER | 14 | OTHER | 2 | 38.4 | - |
| CAPITAL TOWER | 15 | OTHER | 2 | 38.25 | - |
| CAPITAL TOWER | 15 | OTHER | 4 | 37.31 | - |
| CAPITAL TOWER | 15 | OTHER | 2 | 38.41 | - |
| CAPITAL TOWER | 15 | OTHER | 4 | 38.55 | - |
| CAPITAL TOWER | 15 | OTHER | 2 | 35.99 | - |
| CAPITAL TOWER | 15 | OTHER | 2 | 38.4 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | TWO SIDE OPEN PLOT WITH 24 METER DIVIDER ROAD ON ONE SIDE AND 12 METER SERVICE ROAD ON THE OTHER SIDE. PROPER DEMARCATION OF PLOT IS COMPLETED AS PER APPROVED LAYOUT. |
| Boundary Wall | BOUNDARY WALL OF THE PLOT WILL BE CONSTRUCTED WITH A MIX OF RCC AND BRICK WORK, AND IT WILL BE FINISHED WITH RED STAND-STONE AND MS- GRILL. |
| Road Work | A SIX METER DRIVEWAY WILL BE PROVIDED IN CONCRETE FINISH WITH CONCRETE CEMENT TILES / STAMPED CONCRETING. |
| Footpaths | FOOTPATHS INSIDE THE COMPLEX WILL BE CONSTRUCTED WITH A MIX OF COLORED CEMENT CONCRETE TILES AND GRANITE. |
| Water Supply Including Drinking Water Facilities | THE WATER SUPPLY OF DESIRED QUALITY AND PURITY WILL BE PROVIDED THROUGH OVERHEAD TANKS UPTO EACH UNIT THROUGH TREATED BORING WATER AND GENERAL WATER SUPPLY FROM DEVELOPMENT AUTHORITY. |
| Sewer System | THE PROPER PROVISION OF SEWER LINES HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED. |
| Drain | THE PROPER PROVISION OF DRAINAGE HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. A WELL DESIGNED DRAINAGE SYSTEM CONNECTED TO THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED. |
| Parks | NA |
| Tree Planting | TREES WILL BE PLANTED INSIDE THE COMPLEX IN ACCORDANCE WITH THE APPROVED DRAWINGS FROM DEVELOPMENT AUTHORITY. |
| Design For Electric Supply Including Street Lighting | DESIGNER ELECTRIC POLES, LED LIGHTS TO BE PROVIDED. ALL ELECTRICAL RELATED WORKINGS SHALL CONFER TO BUREAU OF INDIAN STANDARDS, INDIAN ELECTRICITY RULES AND ACTS. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | THE PROPER PROVISION FOR TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER. PROVISIONS ARE PROVIDED FOR RECYCLED WATER TO BE USED IN FLUSHING AND IRRIGATION WORKS. |
| Solid Waste Management And Disposal System | THE PROPER PROVISION FOR SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE CENTRALIZED SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE PURPOSE OF COLLECTION AND DISPOSAL OF SOLID WASTE INSIDE THE COMPLEX. |
| Water Conservation System | ALL GUIDELINES AND BYE-LAWS OF COMPETENT AUTHORITY WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER. RAINWATER HARVESTING SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE APPROVED MAPS AND LAYOUTS FROM THE DEVELOPMENT AUTHORITY. |
| Energy Management System Including Use of Renewable Energy | PARTIAL SOLAR ENERGY WILL BE UTILIZED AS PER THE BYE-LAWS OF COMPETENT AUTHORITY AND AS PER APPROVED BUILDING PLANS. |
| Fire Protection And Fire Safety System | ALL RULES AND REGULATIONS OF NBC IS BEING FOLLOWED. WATER SPRINKLERS SYSTEM WITH AUTOMATIC UPRIGHT/PENDANT/SIDEWALL SPRINKLERS ON EACH FLOOR AS PER THE NATIONAL BUILDING CODE -2016. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM INTHE ENTIRE BUILDING WILL BE PROVIDED. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | PROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES WILL BE PROVIDED. |
| Emergency Evacuation Services | FIRE STAIRCASE HAS BEEN PROVIDED ON EACH FLOOR FOR EMERGENCY EVACUATION. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM WITH EMERGENCY VOICE EVACUATION SYSTEM WILL BE INSTALLED. |
| Other Miscellaneous Work | PROVISION FOR MECHANICAL CAR PARKING SYSTEM IN UPPER AND LOWER BASEMENT WILL BE INSTALLED AS PER THE APPROVED DRAWINGS FROM COMPETENT AUTHORITY. |
Bank Details
| Bank Name | BANK OF BARODA |
| Branch | VISHAL KHAND LUCKNOW |
| Branch Address | 4/28 VISHAL KHAND, GOMTI NAGAR, LUCKNOW |
| Account Holder | PURVANCHAL PROJECTS PVT. LTD. CAPITAL TOWER |
| Account Number | 77380200001465 |
| IFSC Code | BARB0VJVIKH |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in