New Launch - India Real Estate Report 2026.

PURVANCHAL CAPITAL TOWER

PURVANCHAL PROJECTS PRIVATE LIMITED

Lucknow, Uttar Pradesh

RERA approved

Approved

5th Sept 2020

Project completed

Completed

30th Jun 2024

Registration No.

UPRERAPRJ849094

Project Type

Commercial

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ849094
Project StatusCompleted
Project CategoryCommercial
DistrictLucknow
TalukaLucknow
Start Date2020-09-05
Completion Date2024-06-30
Total Area (sqm)5210
Project Cost (Lacs)9601
Duration (Months)46
Registration Fee63000

Promoter Details

Promoter NamePURVANCHAL PROJECTS PRIVATE LIMITED
Promoter IDUPRERAPRM73757
Mobile75********

Project Team

rolename
ArchitectDEVELOPMENT CONSULTANTS - MR. ARUN PATWAL
ContractorMR. SHAH ALAM
Structural EngineerER. SADANAND OJHA

Land Details

typekhasra_or_plot_noarea_sqmt
PlotTC A15209.75

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
CAPITAL TOWERBSMNTOTHER00-
CAPITAL TOWERBSMNT2OTHER00-
CAPITAL TOWERGFSHOP182.780
CAPITAL TOWERGFSHOP260.390
CAPITAL TOWERGFSHOP482.620
CAPITAL TOWERGFSHOP1126.730
CAPITAL TOWERGFSHOP1144.650
CAPITAL TOWERGFSHOP183.070
CAPITAL TOWER1SHOP1144.27-
CAPITAL TOWER1SHOP482.62-
CAPITAL TOWER1SHOP3144.88-
CAPITAL TOWER2SHOP1144.27-
CAPITAL TOWER2SHOP482.62-
CAPITAL TOWER2SHOP3144.88-
CAPITAL TOWER3OTHER438.15-
CAPITAL TOWER3OTHER1104.91-
CAPITAL TOWER3OTHER440.75-
CAPITAL TOWER3OTHER440.7-
CAPITAL TOWER3OTHER240.9-
CAPITAL TOWER3OTHER249.82-
CAPITAL TOWER3OTHER1105.81-
CAPITAL TOWER4OTHER00-
CAPITAL TOWER5OTHER241.03-
CAPITAL TOWER5OTHER440.96-
CAPITAL TOWER5OTHER441.37-
CAPITAL TOWER5OTHER441.51-
CAPITAL TOWER5OTHER238.77-
CAPITAL TOWER6OTHER241.03-
CAPITAL TOWER6OTHER440.96-
CAPITAL TOWER6OTHER441.37-
CAPITAL TOWER6OTHER441.51-
CAPITAL TOWER6OTHER238.77-
CAPITAL TOWER7OTHER241.03-
CAPITAL TOWER7OTHER440.96-
CAPITAL TOWER7OTHER441.37-
CAPITAL TOWER7OTHER441.51-
CAPITAL TOWER7OTHER238.77-
CAPITAL TOWER8OTHER241.03-
CAPITAL TOWER8OTHER440.96-
CAPITAL TOWER8OTHER441.37-
CAPITAL TOWER8OTHER441.51-
CAPITAL TOWER8OTHER238.77-
CAPITAL TOWER9OTHER241.03-
CAPITAL TOWER9OTHER440.96-
CAPITAL TOWER9OTHER441.37-
CAPITAL TOWER9OTHER441.51-
CAPITAL TOWER9OTHER238.77-
CAPITAL TOWER10OTHER241.03-
CAPITAL TOWER10OTHER440.96-
CAPITAL TOWER10OTHER441.37-
CAPITAL TOWER10OTHER441.51-
CAPITAL TOWER10OTHER238.77-
CAPITAL TOWER11OTHER00-
CAPITAL TOWER12OTHER238.25-
CAPITAL TOWER12OTHER437.31-
CAPITAL TOWER12OTHER238.41-
CAPITAL TOWER12OTHER438.55-
CAPITAL TOWER12OTHER235.99-
CAPITAL TOWER12OTHER238.4-
CAPITAL TOWER13OTHER238.25-
CAPITAL TOWER13OTHER437.31-
CAPITAL TOWER13OTHER238.41-
CAPITAL TOWER13OTHER438.55-
CAPITAL TOWER13OTHER235.99-
CAPITAL TOWER13OTHER238.4-
CAPITAL TOWER14OTHER238.25-
CAPITAL TOWER14OTHER437.31-
CAPITAL TOWER14OTHER238.41-
CAPITAL TOWER14OTHER438.55-
CAPITAL TOWER14OTHER235.99-
CAPITAL TOWER14OTHER238.4-
CAPITAL TOWER15OTHER238.25-
CAPITAL TOWER15OTHER437.31-
CAPITAL TOWER15OTHER238.41-
CAPITAL TOWER15OTHER438.55-
CAPITAL TOWER15OTHER235.99-
CAPITAL TOWER15OTHER238.4-

Development Works

work_namedescription
Demarcation of PlotsTWO SIDE OPEN PLOT WITH 24 METER DIVIDER ROAD ON ONE SIDE AND 12 METER SERVICE ROAD ON THE OTHER SIDE. PROPER DEMARCATION OF PLOT IS COMPLETED AS PER APPROVED LAYOUT.
Boundary WallBOUNDARY WALL OF THE PLOT WILL BE CONSTRUCTED WITH A MIX OF RCC AND BRICK WORK, AND IT WILL BE FINISHED WITH RED STAND-STONE AND MS- GRILL.
Road WorkA SIX METER DRIVEWAY WILL BE PROVIDED IN CONCRETE FINISH WITH CONCRETE CEMENT TILES / STAMPED CONCRETING.
FootpathsFOOTPATHS INSIDE THE COMPLEX WILL BE CONSTRUCTED WITH A MIX OF COLORED CEMENT CONCRETE TILES AND GRANITE.
Water Supply Including Drinking Water FacilitiesTHE WATER SUPPLY OF DESIRED QUALITY AND PURITY WILL BE PROVIDED THROUGH OVERHEAD TANKS UPTO EACH UNIT THROUGH TREATED BORING WATER AND GENERAL WATER SUPPLY FROM DEVELOPMENT AUTHORITY.
Sewer SystemTHE PROPER PROVISION OF SEWER LINES HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED.
DrainTHE PROPER PROVISION OF DRAINAGE HAS BEEN PROVIDED AS PER THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. A WELL DESIGNED DRAINAGE SYSTEM CONNECTED TO THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED.
ParksNA
Tree PlantingTREES WILL BE PLANTED INSIDE THE COMPLEX IN ACCORDANCE WITH THE APPROVED DRAWINGS FROM DEVELOPMENT AUTHORITY.
Design For Electric Supply Including Street LightingDESIGNER ELECTRIC POLES, LED LIGHTS TO BE PROVIDED. ALL ELECTRICAL RELATED WORKINGS SHALL CONFER TO BUREAU OF INDIAN STANDARDS, INDIAN ELECTRICITY RULES AND ACTS.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterTHE PROPER PROVISION FOR TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER. PROVISIONS ARE PROVIDED FOR RECYCLED WATER TO BE USED IN FLUSHING AND IRRIGATION WORKS.
Solid Waste Management And Disposal SystemTHE PROPER PROVISION FOR SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE NORMS AND BYE-LAWS OF DEVELOPMENT AUTHORITY. THE CENTRALIZED SEWAGE TREATMENT PLANT OF SUITABLE CAPACITY WILL BE ESTABLISHED FOR THE PURPOSE OF COLLECTION AND DISPOSAL OF SOLID WASTE INSIDE THE COMPLEX.
Water Conservation SystemALL GUIDELINES AND BYE-LAWS OF COMPETENT AUTHORITY WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER. RAINWATER HARVESTING SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH THE APPROVED MAPS AND LAYOUTS FROM THE DEVELOPMENT AUTHORITY.
Energy Management System Including Use of Renewable EnergyPARTIAL SOLAR ENERGY WILL BE UTILIZED AS PER THE BYE-LAWS OF COMPETENT AUTHORITY AND AS PER APPROVED BUILDING PLANS.
Fire Protection And Fire Safety SystemALL RULES AND REGULATIONS OF NBC IS BEING FOLLOWED. WATER SPRINKLERS SYSTEM WITH AUTOMATIC UPRIGHT/PENDANT/SIDEWALL SPRINKLERS ON EACH FLOOR AS PER THE NATIONAL BUILDING CODE -2016. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM INTHE ENTIRE BUILDING WILL BE PROVIDED.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES WILL BE PROVIDED.
Emergency Evacuation ServicesFIRE STAIRCASE HAS BEEN PROVIDED ON EACH FLOOR FOR EMERGENCY EVACUATION. INTELLIGENT FIRE DETECTION AND ALARM SYSTEM WITH EMERGENCY VOICE EVACUATION SYSTEM WILL BE INSTALLED.
Other Miscellaneous WorkPROVISION FOR MECHANICAL CAR PARKING SYSTEM IN UPPER AND LOWER BASEMENT WILL BE INSTALLED AS PER THE APPROVED DRAWINGS FROM COMPETENT AUTHORITY.

Bank Details

Bank NameBANK OF BARODA
BranchVISHAL KHAND LUCKNOW
Branch Address4/28 VISHAL KHAND, GOMTI NAGAR, LUCKNOW
Account HolderPURVANCHAL PROJECTS PVT. LTD. CAPITAL TOWER
Account Number77380200001465
IFSC CodeBARB0VJVIKH

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy