Ratan Galaxy Phase II
RATAN HOUSING DEVELOPMENT LIMITED
Lucknow, Uttar Pradesh
Approved
1st Feb 2022
Completed
13th Nov 2024
Registration No.
UPRERAPRJ718664
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ718664 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2022-02-01 |
| Completion Date | 2024-11-13 |
| Total Area (sqm) | 6741 |
| Project Cost (Lacs) | 6600 |
| Duration (Months) | 34 |
| Registration Fee | 39000 |
Promoter Details
| Promoter Name | RATAN HOUSING DEVELOPMENT LIMITED |
| Promoter ID | UPRERAPRM15031 |
| Mobile | 78******** |
Project Team
| role | name |
|---|---|
| Architect | MUKUL SHARMA |
| Contractor | Self |
| Structural Engineer | NARENDRA SINGH |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | GH - 01 and GH -02 | 16851 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A | GF | OTHER | 0 | 0 | 0 |
| A | 1 | 4 BHK | 2 | 170.38 | - |
| A | 1 | 3 BHK | 4 | 132.27 | - |
| A | 1 | 3 BHK | 4 | 117.56 | - |
| A | 1 | 2 BHK | 4 | 89.38 | - |
| A | 2 | 4 BHK | 2 | 170.38 | - |
| A | 2 | 3 BHK | 4 | 132.27 | - |
| A | 2 | 3 BHK | 4 | 117.56 | - |
| A | 2 | 2 BHK | 4 | 89.38 | - |
| A | 3 | 4 BHK | 2 | 170.38 | - |
| A | 3 | 3 BHK | 4 | 132.27 | - |
| A | 3 | 3 BHK | 4 | 117.56 | - |
| A | 3 | 2 BHK | 4 | 89.38 | - |
| A | 4 | 4 BHK | 2 | 170.38 | - |
| A | 4 | 3 BHK | 4 | 132.27 | - |
| A | 4 | 3 BHK | 4 | 117.56 | - |
| A | 4 | 2 BHK | 4 | 89.38 | - |
| A | 5 | 4 BHK | 2 | 170.38 | - |
| A | 5 | 3 BHK | 4 | 132.27 | - |
| A | 5 | 3 BHK | 4 | 117.56 | - |
| A | 5 | 2 BHK | 4 | 89.38 | - |
| A | 6 | 4 BHK | 2 | 170.38 | - |
| A | 6 | 3 BHK | 4 | 132.27 | - |
| A | 6 | 3 BHK | 4 | 117.56 | - |
| A | 6 | 2 BHK | 4 | 89.38 | - |
| A | 7 | 4 BHK | 2 | 170.38 | - |
| A | 7 | 3 BHK | 4 | 132.27 | - |
| A | 7 | 3 BHK | 4 | 117.56 | - |
| A | 7 | 2 BHK | 4 | 89.38 | - |
| A | 8 | 4 BHK | 2 | 170.38 | - |
| A | 8 | 3 BHK | 4 | 132.27 | - |
| A | 8 | 3 BHK | 4 | 117.56 | - |
| A | 8 | 2 BHK | 4 | 89.38 | - |
| A | 9 | 4 BHK | 2 | 170.38 | - |
| A | 9 | 3 BHK | 4 | 132.27 | - |
| A | 9 | 3 BHK | 4 | 117.56 | - |
| A | 9 | 2 BHK | 4 | 89.38 | - |
| A | GF | SHOP | 1 | 11.07 | 0 |
| A | GF | SHOP | 1 | 13.25 | 0 |
| A | GF | SHOP | 1 | 14.7 | 0 |
| A | GF | SHOP | 1 | 14.75 | 0 |
| A | GF | SHOP | 1 | 14.85 | 0 |
| A | GF | SHOP | 6 | 15 | 0 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Since this is a phase of the already complete project, the Demarcation of plots is already done. |
| Boundary Wall | Around 230 mm thick Boundary wall exist in the project. |
| Road Work | Around 20 ft wide road will be provided, All internal roads will have concrete pavers or equivalent finishes. |
| Footpaths | Wide footpath in thick concrete pavers or equivalent finishes |
| Water Supply Including Drinking Water Facilities | Ground Water Supply facility to be arranged . |
| Sewer System | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. |
| Drain | Storm water drain shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | "We will provide green area with the different activities and the green area will have gaming facilities for kids." |
| Tree Planting | Several small and big plants and trees shall be put in the park and the surroundings |
| Design For Electric Supply Including Street Lighting | System has been designed as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting, etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. |
| Solid Waste Management And Disposal System | "There are a proper garbage collection area provided for the solid waste management." |
| Water Conservation System | Rain water harvesting system shall be provided for the whole building complex to conserve water |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | All the fire norms shall be followed as NBC and approval of fire department |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | We are providing fire escape stair case with sufficient width that open to the wide corridor for the public to safely evacuate in the case of emergency. |
| Other Miscellaneous Work | We are providing amenities like Gym |
Bank Details
| Bank Name | ICICI Bank |
| Branch | Telibagh Lucknow |
| Branch Address | ICICI Bank, Telibagh, Rai bareilly road, Lucknow |
| Account Holder | Ratan Housing Development Limited Galaxy Phase-2 RERA Collection Account |
| Account Number | 099805002405 |
| IFSC Code | ICIC0001259 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





