Rishita Mulberry Heights Phase 3

RISHITA DEVELOPERS PRIVATE LIMITED

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Mar 2020

Project completed

Completed

17th Jan 2026

Registration No.

UPRERAPRJ308470

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ308470
Project StatusCompleted
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2020-03-01
Completion Date2026-01-17
Total Area (sqm)18314
Project Cost (Lacs)18085
Duration (Months)71
Registration Fee97000

Promoter Details

Promoter NameRISHITA DEVELOPERS PRIVATE LIMITED
Promoter IDUPRERAPRM4294
Mobile75********

Project Team

rolename
ArchitectDesign Forum International
ContractorRishita Developers Pvt. Ltd.
Structural EngineerEr. Maqsud-e-Nazar

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPart of Group Housing I, Plot no SECTOR C, POCKET 6, Sushant Golf City,Lucknow18313.92

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower D2GF2 BHK774.620
Tower D212 BHK874.62-
Tower D222 BHK874.62-
Tower D232 BHK874.62-
Tower D242 BHK874.62-
Tower D252 BHK874.62-
Tower D262 BHK874.62-
Tower D272 BHK874.62-
Tower D282 BHK874.62-
Tower D292 BHK874.62-
Tower D2102 BHK874.62-
Tower D2112 BHK874.62-
Tower D2122 BHK874.62-
Tower D2132 BHK874.62-
Tower D2142 BHK874.62-
Tower C2GF3 BHK2114.780
Tower C2GF3 BHK1128.900
Tower C2GF3 BHK5123.060
Tower C213 BHK1128.90-
Tower C213 BHK7123.06-
Tower C223 BHK1128.90-
Tower C223 BHK7123.06-
Tower C233 BHK1128.90-
Tower C233 BHK7123.06-
Tower C243 BHK1128.90-
Tower C243 BHK7123.06-
Tower C253 BHK1128.90-
Tower C253 BHK7123.06-
Tower C263 BHK1128.90-
Tower C263 BHK7123.06-
Tower C273 BHK1128.90-
Tower C273 BHK7123.06-
Tower C283 BHK1128.90-
Tower C283 BHK7123.06-
Tower C293 BHK1128.90-
Tower C293 BHK7123.06-
Tower C2103 BHK1128.90-
Tower C2103 BHK7123.06-
Tower C2113 BHK1128.90-
Tower C2113 BHK7123.06-
Tower C2123 BHK1128.90-
Tower C2123 BHK7123.06-
Tower C2133 BHK1128.90-
Tower C2133 BHK7123.06-
Tower C2143 BHK1128.90-
Tower C2143 BHK7123.06-
Tower C3GF3 BHK2114.780
Tower C3GF3 BHK1128.900
Tower C3GF3 BHK5123.060
Tower C313 BHK1128.90-
Tower C313 BHK7123.06-
Tower C323 BHK1128.90-
Tower C323 BHK7123.06-
Tower C333 BHK1128.90-
Tower C333 BHK7123.06-
Tower C343 BHK1128.90-
Tower C343 BHK7123.06-
Tower C353 BHK1128.90-
Tower C353 BHK7123.06-
Tower C363 BHK1128.90-
Tower C363 BHK7123.06-
Tower C373 BHK1128.90-
Tower C373 BHK7123.06-
Tower C383 BHK1128.90-
Tower C383 BHK7123.06-
Tower C393 BHK1128.90-
Tower C393 BHK7123.06-
Tower C3103 BHK1128.90-
Tower C3103 BHK7123.06-
Tower C3113 BHK1128.90-
Tower C3113 BHK7123.06-
Tower C3123 BHK1128.90-
Tower C3123 BHK7123.06-
Tower C3133 BHK1128.90-
Tower C3133 BHK7123.06-
Tower C3143 BHK1128.90-
Tower C3143 BHK7123.06-

Development Works

work_namedescription
Demarcation of PlotsThis is single plot of rectangular shape , having total 3 no. of entry gate in which 1 main gate having grand entrance from the 45m wide front road and rest of 2 are secondary gates from 24 m wide road. Site is surronded by other plots on one side and 30m wide road.
Boundary Wall1.8 - 2.4m high and 200 mm thick Boundary wall designed . Concrete hollow block work and rcc work in column and beam may be used as per design. Entrance gates will be created at the main entrance .Steel Gates will used at secondary entrances
Road WorkPaver/tremix based road will be created for all internal road works with concrete pavers at certain junction points.
FootpathsAll internal roads will have 1.5m wide footpath in 40- 60 mm thick concrete pavers or equivalent finishes
Water Supply Including Drinking Water FacilitiesUnderground Tank of 830 KL Capacity.
Sewer SystemUnderground System using uPVC(SN-4) Sewer pipes.
DrainUnderground System using uPVC(SN-4) pipes.
ParksThere is one main central park between the towers with different recretional activities. There are more green parks by the boundary wall on two sides of the complex
Tree Planting"There are 3 type of trees povided in site which are Bahunia Blackena(12 no.), Phoenix Dactylifera(220 No.), Ficus Benjamina(218 No.)"
Design For Electric Supply Including Street LightingFive nos. Transformers of 1600 KVA, 33 / 0.4 KV capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lighting shall be LED based & automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone
Community BuildingsCommunity activity area shall be provided at the site in central area which shall be accessed by all residents.
Treatment and Disposal System of Sewage and Sullage waterSTP of Capacity 720 KLD shall be provided. Treated water shall be used for Flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal Sewer as per site.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemRain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible.
Energy Management System Including Use of Renewable EnergySolar panels shall be provided on terrace for renewable energy. Energy purchased from the grid/ power supply company & metering will be done as per electricity supply authority guideline.
Fire Protection And Fire Safety SystemFire Tender path shall be provided as per NBC. Fire Fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.
Social Infrastructure And Other Public Amenities Including Public Health Services"Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filtration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain."
Emergency Evacuation ServicesBalcony will also be used for evacuation.Assembly points areas will be demarcated for earthquake and other possible disasters
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameHDFC Bank Ltd
BranchGOMTI NAGAR
Branch AddressGOMTI NAGAR, LUCKNOW
Account HolderRISHITA DEV P LTD MUL HEI P3 RERA A/C
Account Number50200048183700
IFSC CodeHDFC0001112

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy