Rishita Mulberry Heights Phase-6
RISHITA DEVELOPERS PRIVATE LIMITED
Lucknow, Uttar Pradesh
Approved
1st Mar 2021
Completed
31st Dec 2024
Registration No.
UPRERAPRJ447396
Project Type
Residential
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ447396 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2021-03-01 |
| Completion Date | 2024-12-31 |
| Total Area (sqm) | 7779 |
| Project Cost (Lacs) | 7180 |
| Duration (Months) | 46 |
| Registration Fee | 44000 |
Promoter Details
| Promoter Name | RISHITA DEVELOPERS PRIVATE LIMITED |
| Promoter ID | UPRERAPRM4294 |
| Mobile | 75******** |
Project Team
| role | name |
|---|---|
| Architect | Design Forum International |
| Contractor | Rishita Developers Pvt. Ltd. |
| Structural Engineer | Er. Maqsud-e-Nazar |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Part of GH-1, Plot no. Sector-C, Pocket-6, Sushant Golf City, Lucknow | 7779.06 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower B2 | GF | 3 BHK | 2 | 133.77 | 0 |
| Tower B2 | 1 | 2 BHK | 2 | 111.08 | - |
| Tower B2 | 1 | 3 BHK | 2 | 133.77 | - |
| Tower B2 | 2 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 4 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 5 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 6 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 7 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 8 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 9 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 10 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 11 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | 12 | 3 BHK | 4 | 136.89 | - |
| Tower B2 | 13 | 3 BHK | 4 | 136.89 | - |
| Tower B2 | 14 | 3 BHK | 4 | 136.89 | - |
| Tower B3 | GF | 3 BHK | 2 | 133.77 | 0 |
| Tower B3 | 1 | 2 BHK | 2 | 111.08 | - |
| Tower B3 | 1 | 3 BHK | 2 | 133.77 | - |
| Tower B3 | 2 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 3 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 4 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 5 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 6 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 7 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 8 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 9 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 10 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 11 | 3 BHK | 4 | 133.77 | - |
| Tower B3 | 12 | 3 BHK | 4 | 136.89 | - |
| Tower B3 | 13 | 3 BHK | 4 | 136.89 | - |
| Tower B2 | 3 | 3 BHK | 4 | 133.77 | - |
| Tower B2 | GF | 2 BHK | 2 | 111.08 | 0 |
| Tower B3 | GF | 2 BHK | 2 | 111.08 | 0 |
| Tower B3 | 14 | 3 BHK | 4 | 136.89 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is single plot of rectangular shape, having total 3 no. of entry gate in which 1 main gate having grand entrance from the 45 m wise front road and rest of 2 are secondary gates from 24 m wide road. Site is surronded by other plots on one side and 30m wide road. |
| Boundary Wall | 1.8- 2.4m high and 200 mm thick boundary wall designed. Concrete hollow block work and rcc work in column and beam may be used as per design. Entrance gates will be created at the main entrance. Steel gates will used at secondary entrances. |
| Road Work | Paver/ Tremix based road will be created for all internal road works with concrete pavers at certain junction points. |
| Footpaths | All internal roads will have 1.5m wide foothpath in 40-60 mm thick concrete pavers or equivalent finishes |
| Water Supply Including Drinking Water Facilities | Underground tank of 830 KL Capacity. |
| Sewer System | Underground system using uPVC(SN-4) sewer pipes. |
| Drain | Underground system using uPVC(SN-4) pipes |
| Parks | There is one main central park between the towers with different recretional activities. There are more green parks by the boundary wall on two sides of the complex. |
| Tree Planting | There are 3 type of trees provided in site which are bahunia clackena (12 no.), Pheonix Dactylifera (220 No.), Ficus Benjamina (218 No.) |
| Design For Electric Supply Including Street Lighting | Five no. transformers of 1600 KVA, 33/0.4 KV capacity each shall be used along with necessary switch- gear for distributing electricity at LT voltage. All street/ landscape lighting shall be LED based and automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone. |
| Community Buildings | Community acitivity area shall be provided at the site in central area which shall be accessed by all the residents. |
| Treatment and Disposal System of Sewage and Sullage water | STP of Capacity 720 KLD shaal be provided. Treated water shall be used for flushing, irrigation, carwash, pathway cleaning and excess water shall be discharged into the municipal sewer as per site. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible. |
| Energy Management System Including Use of Renewable Energy | Solar panels shall be provided on terrace for renewable energy. Energy purchased from the grid/ power supply company and metering will be done as per electricity supply authority guideline. |
| Fire Protection And Fire Safety System | Fire tender path shall be provided as per NBC. Fore fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from Fire department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage, storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewage shall go to STP for recycling the water. Storm water for roof, roads and other area shall be connect to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connect with municiple drain. |
| Emergency Evacuation Services | Balcony will also be used for evacuation. Assembly points areas will be demarcated for earthquake and other possible disasters. |
| Other Miscellaneous Work | Not Applicable |
Bank Details
| Bank Name | ICICI Bank Ltd |
| Branch | Vibhuti Khand II Branch |
| Branch Address | Vibhuti Khand, Gomti Nagar, Lucknow - 226010 |
| Account Holder | Rishita Developers Pvt Ltd Rishita Mulberry Heights Phase 6 Collection A/c |
| Account Number | 777705007504 |
| IFSC Code | ICIC0004698 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in