New Launch - India Real Estate Report 2026.

Shalimar Business District Tower 1

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)

Lucknow, Uttar Pradesh

RERA approved

Approved

15th Jan 2024

Completion pending

Pending

15th Dec 2027

Registration No.

UPRERAPRJ143786/01/2024

Project Type

Commercial

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ143786/01/2024
Project StatusNew
Project CategoryCommercial
DistrictLucknow
TalukaLucknow
Start Date2024-01-15
Completion Date2027-12-15
Total Area (sqm)11058
Project Cost (Lacs)34972
Duration (Months)48
Registration Fee121000

Promoter Details

Promoter NameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Promoter IDUPRERAPRM10813
Mobile92********

Project Team

rolename
ArchitectMr. Shivam Srivastava
ContractorMr. Satinder Sawhney
Structural EngineerMr. Pankish Goel

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra570, 571, 572, 573, 574, 575, 576, 613, 625, 626, 631, 633, 635, 636, 569Ka & 569 Kha36761

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower 1GFSHOP1120.6800
Tower 1GFSHOP190.760
Tower 1GFOTHER112.720
Tower 11OTHER1110.61-
Tower 11OTHER1133.3-
Tower 11OTHER1163.7-
Tower 11OTHER1207.76-
Tower 12OTHER1110.61-
Tower 12OTHER1127.31-
Tower 12OTHER1135.33-
Tower 12OTHER1197.45-
Tower 12OTHER1174.48-
Tower 12OTHER1120.44-
Tower 12OTHER1122.29-
Tower 12OTHER1141.16-
Tower 13OTHER1110.61-
Tower 13OTHER1127.31-
Tower 13OTHER1135.33-
Tower 13OTHER1197.45-
Tower 13OTHER1197.45-
Tower 13OTHER1135.33-
Tower 13OTHER1138.53-
Tower 13OTHER1157.84-
Tower 14OTHER1110.61-
Tower 14OTHER1127.31-
Tower 14OTHER2135.33-
Tower 14OTHER2197.45-
Tower 14OTHER1138.53-
Tower 14OTHER1157.84-
Tower 15OTHER1110.61-
Tower 15OTHER1127.31-
Tower 15OTHER2135.33-
Tower 15OTHER2197.45-
Tower 15OTHER1138.53-
Tower 15OTHER1157.84-
Tower 16OTHER1110.61-
Tower 16OTHER1127.31-
Tower 16OTHER2135.33-
Tower 16OTHER2197.45-
Tower 16OTHER1138.53-
Tower 16OTHER1157.84-
Tower 17OTHER1110.61-
Tower 17OTHER1127.31-
Tower 17OTHER2135.33-
Tower 17OTHER2197.45-
Tower 17OTHER1138.53-
Tower 17OTHER1157.84-
Tower 18OTHER1110.61-
Tower 18OTHER1127.31-
Tower 18OTHER2135.33-
Tower 18OTHER2197.45-
Tower 18OTHER1138.53-
Tower 18OTHER1157.84-
Tower 19OTHER1110.61-
Tower 19OTHER1127.31-
Tower 19OTHER2135.33-
Tower 19OTHER2197.45-
Tower 19OTHER1138.53-
Tower 19OTHER1157.84-
Tower 110OTHER1110.61-
Tower 110OTHER1127.31-
Tower 110OTHER2135.33-
Tower 110OTHER2197.45-
Tower 110OTHER1138.53-
Tower 110OTHER1157.84-
Tower 111OTHER1110.61-
Tower 111OTHER1127.31-
Tower 111OTHER2135.33-
Tower 111OTHER2197.45-
Tower 111OTHER1138.53-
Tower 111OTHER1157.84-
Tower 112OTHER1110.61-
Tower 112OTHER1127.31-
Tower 112OTHER2135.33-
Tower 112OTHER2197.45-
Tower 112OTHER1138.53-
Tower 112OTHER1157.84-
Tower 113OTHER193.68-
Tower 113OTHER1118.09-
Tower 113OTHER2126.88-
Tower 113OTHER2185.14-
Tower 113OTHER1129.44-
Tower 113OTHER1141.16-
Tower 114OTHER193.68-
Tower 114OTHER1118.09-
Tower 114OTHER2126.88-
Tower 114OTHER2185.14-
Tower 114OTHER1129.44-
Tower 114OTHER1141.16-
Tower 115OTHER193.68-
Tower 115OTHER1118.09-
Tower 115OTHER2126.88-
Tower 115OTHER2185.14-
Tower 115OTHER1129.44-
Tower 115OTHER1141.16-
Tower 116OTHER193.68-
Tower 116OTHER1118.09-
Tower 116OTHER2126.88-
Tower 116OTHER2185.14-
Tower 116OTHER1129.44-
Tower 116OTHER1141.16-
Tower 117OTHER193.68-
Tower 117OTHER1118.09-
Tower 117OTHER2126.88-
Tower 117OTHER2182.25-
Tower 117OTHER1129.44-
Tower 117OTHER1141.16-
Tower 118OTHER193.68-
Tower 118OTHER1118.09-
Tower 118OTHER2126.88-
Tower 118OTHER2182.25-
Tower 118OTHER1129.44-
Tower 118OTHER1141.16-
Tower 119OTHER193.68-
Tower 119OTHER1118.09-
Tower 119OTHER2126.88-
Tower 119OTHER2182.25-
Tower 119OTHER1129.44-
Tower 119OTHER1141.16-
Tower 120OTHER193.68-
Tower 120OTHER1118.09-
Tower 120OTHER2126.88-
Tower 120OTHER2182.25-
Tower 120OTHER1129.44-
Tower 120OTHER1141.16-
Tower 121OTHER11228.09-
Tower 122OTHER11149.79-
Tower 123OTHER11110.97-

Development Works

work_namedescription
Demarcation of PlotsAs per approved sanction plan.This is single plot polygon shaped , having total 1 no. of entry gate and 1no. of exit gate. Site is surronded by 30 mtr road from North, 24 mtr road from South and other plots by East and West.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary.
Road WorkTrimix / asphalt road will be used as per design suggested by the Architect for internal road.
FootpathsAll internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design.
Water Supply Including Drinking Water FacilitiesAll floors must be equipped with domestic water for sanitary activities and STP (Sewage Treatment Plant) treated water for the flushing system. Individuals may utilize an RO (Reverse Osmosis) system as per their specific requirements for potable purposes. The STP treated water will also be made available for irrigation purposes. To facilitate this, water tanks are being constructed underground and on the terrace. Separate tanks are designated for fire water.
Sewer SystemThe building is equipped with a centralized sewerage system, ensuring all sewage water is directed to the Sewage Treatment Plant (STP) for thorough treatment. Following treatment, the recycled water will be repurposed for gardening, flush tanks, and vehicle washing, contributing to the buildings environmentally friendly practices. Additionally, the building is designed to meet green building standards, targeting a gold certificate. As part of these efforts, the plan is to achieve zero sewage discharge, demonstrating a strong commitment to environmental sustainability.
DrainA stormwater system will be implemented to manage stormwater from roads and other landscaped areas. The stormwater will be directed to the stormwater drain channel, while rooftop stormwater will be channeled to a rainwater harvesting pit to recharge the groundwater. Any overflow will be connected to the municipal drain line to ensure proper drainage and water resource management. This approach effectively mitigates the impact of stormwater runoff and contributes significantly to sustainable water management practices
ParksThere is a significant green area beside building for different recreational activities.
Tree PlantingThe trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity Board and consider centralized Transformer panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control, Pump room etc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterCentralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
Solid Waste Management And Disposal SystemProject shall have waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal.
Water Conservation SystemA well designed rain water harvesting system as per green building codes shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
Energy Management System Including Use of Renewable EnergyThe proposed project is envisioned as a green, sustainable building, committed to environmental responsibility and resource efficiency throughout the buildings entire life cycle. The project aims to conserve natural resources and implement optimized energy-efficient systems, aligning with sustainable building practices to promote a positive impact on the environment and long-term operational efficiency
Fire Protection And Fire Safety SystemAll Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers, smoke detectors with pumps are provided as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus. Adequate signage is also provided.
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI BANK
BranchVibhuti Khand, Gomti Nagar, Lucknow
Branch AddressTC-13, V-IV, Vibhuti Khand, Gomti Nagar, Lucknow - 226010, Uttar Pradesh
Account HolderSHALIMAR LAKECITY PVT LTD COLLECTION ACCOUNT SHALIMAR BUSINESS DISTRICT TOWER 1
Account Number469805000120
IFSC CodeICIC0004698

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy