Shalimar Gallant West
M/s Shalimar Corp Ltd.
Lucknow, Uttar Pradesh
Approved
20th Oct 2022
Pending
20th Oct 2026
Registration No.
UPRERAPRJ569037
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ569037 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2022-10-20 |
| Completion Date | 2026-10-20 |
| Total Area (sqm) | 8162 |
| Project Cost (Lacs) | 20150 |
| Duration (Months) | 49 |
| Registration Fee | 46000 |
Promoter Details
| Promoter Name | M/s Shalimar Corp Ltd. |
| Promoter ID | UPRERAPRM4092 |
| Mobile | 74******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Nikhil Arora (M/s. Arcop Associates) |
| Contractor | Mr. Sunil Upadhyay - M/s. Bucon Infratech Pvt. Ltd. |
| Structural Engineer | Mr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.) |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 182, 184, 202, 203 | 8162 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| TOWER A | GF | 4 BHK | 2 | 219.55 | 0 |
| TOWER A | 1 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 2 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 3 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 4 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 5 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 6 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 7 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 8 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 9 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 10 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 11 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 12 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 13 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 14 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 15 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 16 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 17 | 4 BHK | 2 | 219.55 | - |
| TOWER A | 18 | OTHER | 0 | 0 | - |
| TOWER B | GF | 4 BHK | 1 | 219.55 | 0 |
| TOWER B | 1 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 2 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 3 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 4 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 5 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 6 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 7 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 8 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 9 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 10 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 11 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 12 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 13 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 14 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 15 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 16 | 4 BHK | 2 | 219.55 | - |
| TOWER B | 17 | 4 BHK | 2 | 219.55 | - |
| EWS/LIG | GF | 1 BHK | 2 | 29.45 | 0 |
| EWS/LIG | GF | 1 BHK | 2 | 30.3 | 0 |
| EWS/LIG | 1 | 1 BHK | 2 | 29.45 | - |
| EWS/LIG | 1 | 1 BHK | 2 | 30.3 | - |
| EWS/LIG | 2 | 1 BHK | 2 | 29.45 | - |
| EWS/LIG | 2 | 1 BHK | 2 | 30.3 | - |
| EWS/LIG | 3 | 1 BHK | 2 | 29.45 | - |
| EWS/LIG | 3 | 1 BHK | 2 | 30.3 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per approved sanction plan.This is single plot L shaped , having total 1 no. of entry/Exit gate and 1no. of exit gate from the 18 mtr wide front road.Site is surronded by North & East with developers plot and other plot from West side. |
| Boundary Wall | 1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary. |
| Road Work | Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road. |
| Footpaths | All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design. |
| Water Supply Including Drinking Water Facilities | All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water. |
| Sewer System | Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement. after treatement ,water shall be recycled and it will be used in gardening and flush tanks. oveflow from the STP shall be connected with the Municiple sewarage system. |
| Drain | Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line. |
| Parks | There are significant green area beside building including green parks, play areas for childrens and different recretional activities. |
| Tree Planting | The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc. |
| Community Buildings | Fully centralised AC community center is proposed on ground floor in one tower and Club House comprising swimming pool, multiple facilities viz. gym facility, indoor playing areas etc is proposed at 18th floor in one tower. |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatement, after treatement ,water shall be recycled and it will be used in gardening, flush tanks. Oveflow from the STP shall be connected with the Municiple sewarage system. |
| Solid Waste Management And Disposal System | There are proper garbage collection area provided for the solid waste management. |
| Water Conservation System | A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. |
| Fire Protection And Fire Safety System | All the fire norms shall be followed as NBC and approval of fire department |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities. |
| Emergency Evacuation Services | Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas defined in the campus.Adequate signage is also provided. |
| Other Miscellaneous Work | Lush green shrubs at vacant space on ground etc. |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | COMMERCIAL BRANCH, GOKHLE MARG, LUCKNOW |
| Branch Address | COMMERCIAL BRANCH, GOKHLE MARG, LUCKNOW |
| Account Holder | SHALIMAR CORP LTD COLL A/C SHALIMAR GALLANT WEST |
| Account Number | 41039120284 |
| IFSC Code | SBIN0004166 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in