Signature Park Sector 2 & 3

SWASTIK MULTITRADE PRIVATE LIMITED

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jan 2022

Completion pending

Pending

31st Dec 2026

Registration No.

UPRERAPRJ422497

Project Type

Residential

District

Lucknow

Taluka

Mohanlalganj

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ422497
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaMohanlalganj
Start Date2022-01-01
Completion Date2026-12-31
Total Area (sqm)119523
Project Cost (Lacs)26100
Duration (Months)60
Registration Fee603000

Promoter Details

Promoter NameSWASTIK MULTITRADE PRIVATE LIMITED
Promoter IDUPRERAPRM38806
Mobile70********

Project Team

rolename
ArchitectTriptie Awasthi
ContractorSid Constructions Pvt Ltd
Structural EngineerNA

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1862820
Khasra18401620
Khasra1839210
Khasra1841480
Khasra1856510
Khasra1845 MI1800
Khasra1845 MI1800
Khasra18473160
Khasra1849 ka380
Khasra18501010
Khasra1852380
Khasra1542760
Khasra1944250
Khasra1952510
Khasra1955130
Khasra1968130
Khasra1861250
Khasra1865190
Khasra1853757.5
Khasra18732370
Khasra17061300
Khasra18701570
Khasra1853252
Khasra1873790
Khasra18591260
Khasra18541520
Khasra18551260
Khasra182165
Khasra180865
Khasra18581140
Khasra18574670
Khasra1860890
Khasra18711320
Khasra1735298
Khasra182876
Khasra1829101
Khasra1830101
Khasra1832101
Khasra183363
Khasra1862164
Khasra182776
Khasra1863225
Khasra1802250
Khasra1862492
Khasra1916526.6
Khasra18701570
Khasra1868130
Khasra1869510
Khasra1864370
Khasra1872 MI1520
Khasra19011640
Khasra1874KA505
Khasra1721510
Khasra1874 KHA2304
Khasra1874 KHA3455
Khasra1874 KHA1151
Khasra1874 KHA505
Khasra19462610
Khasra1957510
Khasra18751706
Khasra18781360
Khasra1882 KA630
Khasra1916260
Khasra1875568
Khasra1877190
Khasra1880740
Khasra18817005
Khasra18881010
Khasra18812335
Khasra18811167
Khasra1883273.3
Khasra1884440
Khasra1883546.6
Khasra1884880
Khasra1879970
Khasra1885630
Khasra18861640
Khasra1847 MI560
Khasra910950
Khasra9132940
Khasra9132940
Khasra9162850
Khasra9172350
Khasra921860
Khasra9232950
Khasra9232950
Khasra9262530
Khasra92612110
Khasra9304216
Khasra931 MI2530
Khasra933 MI1010
Khasra9322280
Khasra933 MI760
Khasra9381640
Khasra931 JHA2150
Khasra933 MI380
Khasra937341
Khasra936170
Khasra933 MI2530
Khasra936170
Khasra931 JHA MI1260
Khasra933 MI1260
Khasra931 MI1260
Khasra944 CHHA MI1260

Development Works

work_namedescription
Demarcation of PlotsTo be done by CC pillers.
Boundary WallNA
Road WorkFrom the main entrance gate we have RCC road through out the project of width 7.5m,9m,12m,18m,24m respectively.
FootpathsInterlocking tiles and green grass.
Water Supply Including Drinking Water FacilitiesWe will provide 2 Nos of pump for the requirement of blocks through underground pipelines, borewell, 3Nos of capacity.
Sewer SystemModular sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall go to the sewerage system provided by the municipality.
DrainStorm water tank shall be provided. Storm water from roads and other landscapes shall go to rain water harvesting pit for recharge of ground water level through storm water drain channel. Overflow from this pit will go to Municipal drain line.
ParksWe will provide green area with different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many types of trees all along the divider and footpaths.
Design For Electric Supply Including Street LightingWe will design and implement the system as per the local electricity board and will consider centralized transformer, HT panel, LT panel, Feeder pillar and DG back for common services like external lighting, STP, Pump room, etc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be provided. All the water will go to STP and overflow from STP will go to municipal drain.
Solid Waste Management And Disposal SystemThere is a proper garbage collection area provided for solid waste management.
Water Conservation SystemWe will suggest individuals to use low flow fixtures as well as dual flush cisterns and raw water harvesting system to reduce water consumption and improve ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fittings in the external areas as well as solar lights. In the pump room also we will use energy efficient motors. We will also suggest Individuals to use energy efficient lights and electrical equipments.
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI Bank
BranchAlambag Lucknow
Branch AddressICICI Bank Alambag Lucknow
Account HolderSwastik Multitrade Private Limited - Signature Park Sector 2 and 3 RERA Collection A/c
Account Number777705801555
IFSC CodeICIC0000318

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy