Sparsh Gateway
SYMTECH DEVELOPERS
Lucknow, Uttar Pradesh
Approved
10th Dec 2024
Pending
27th Mar 2027
Registration No.
UPRERAPRJ118943/02/2025
Project Type
Commercial
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ118943/02/2025 |
| Project Status | New |
| Project Category | Commercial |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2024-12-10 |
| Completion Date | 2027-03-27 |
| Total Area (sqm) | 1515 |
| Project Cost (Lacs) | 1190 |
| Duration (Months) | 28 |
| Registration Fee | 26000 |
Promoter Details
| Promoter Name | SYMTECH DEVELOPERS |
| Promoter ID | UPRERAPRM294236 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | Shri Arun Kumar |
| Contractor | Symtech Developers |
| Structural Engineer | Brijendra Kumar Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | 12-A/CP-09 CP-08 | 1515 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | BSMNT | SHOP | 1 | 519.30 | - |
| 1 | GF | SHOP | 1 | 600.29 | 0 |
| 1 | 1 | SHOP | 1 | 320.03 | - |
| 1 | 2 | SHOP | 1 | 320.03 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have one net plot area of size 1515 sqm , having 2 main entrance and 2 exit gate from the front road, Demarcated by its boundaries -North - 31.20 m , South - 31.50 m, East - 27.80 m, West - 27.50 m |
| Boundary Wall | 6 feet height and 230mm thick rcc/ms 1 section work which give a beautiful iconic design boundary wall to be made with 4 number of gates. |
| Road Work | FROM THE MAIN ENTRANCE /EXIT GATE WE HAVE 100MM THICK , 6 MTR WIDE RCC ROAD THROUGH OUT THE PROJECT. |
| Footpaths | WE WOULD PROVIDE FOOTHPATH THROUGH 5 FEET WIDE CC . |
| Water Supply Including Drinking Water Facilities | OVERHEAD TANK (15000 LITRES), BOREWELL, GOVERNMENT WATER SUPPLY . EACH FLOOR WILL HAVE SEPARATE DRINKING WATER FACILITIES. WE WILL PROVIDE PUMPS FOR THE REQUIREMENTS OF BLOCKS THROUGH PIPELINES. |
| Sewer System | 4 INCH PVC PIPELINE CONNECTED WITH 6INCH PIPELINE TO MAN HOLES. MODULAR SEWERAGE SSYETM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TERATMENTS RE-USE IN FLUSH AND GARDEN . OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSYTEM. WHEN COME INTO FORCE.. |
| Drain | RECHARGE WELL AND WASTE WATER PIPELINE TO BE CONNECT IN NEARBY GOVERNMENT PROVIDED MAIN HOLE. STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS, AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL E CONNECT WITH MUNICIPAL DRAIN LINE. |
| Parks | NA |
| Tree Planting | WE WILL PROVIDE 4 NUMBER TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA. |
| Design For Electric Supply Including Street Lighting | ELECTRICITY SUPPLY WILL BE PROVIDED AS PER SERVICE DRAWINGS , STREET LIGHTING NOT REQUIRED.WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED , TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP ROOM ETC. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | AS PER SERVICE PLAN TO BE CONNECT INTO GOVERNMENT AVAILED SEWER LINE. MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TREATMENT RE-USE IN FLUSH . OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE. |
| Solid Waste Management And Disposal System | TO BE PROVIDED AS PER GOVERNMENT GUIDELINES. SOLID WASTE TO BE COLLECTED FROM STORED IN GARBAGE ROOM. |
| Water Conservation System | WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | PROVISIONAL NOC HAS BEEN RECEIVED FROM FIRE DEPARTMENT AND ALL PROVISIONS SHALL BE MADE AS PER PROVISIONAL NOC AND DRAWING SUBMITTED TO THE FIRE DEPARTMENT. FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | TOILET BLOCK, CLENA DRINKING WATER, FIRSTAID BOX. |
| Emergency Evacuation Services | WE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS , SHALL BE PROVIDED AS PER FIRE DEPARTMENT PROVISIONAL NOC. |
| Other Miscellaneous Work | At this stage all the development plans have already been shared above by us if there will be any further development it will be reported in future. |
Bank Details
| Bank Name | Bank Of India |
| Branch | Aishbagh, Lucknow |
| Branch Address | Aishbagh, LUcknow |
| Account Holder | Symtech Developers Collection Account for Sparsh Gateway |
| Account Number | 680322410000002 |
| IFSC Code | BKID0006803 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





