SPRING GRACE
SPRING GARDEN
Lucknow, Uttar Pradesh
Approved
22nd Oct 2023
Completed
31st Dec 2025
Registration No.
UPRERAPRJ472129/02/2024
Project Type
Mixed
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ472129/02/2024 |
| Project Status | Completed |
| Project Category | Mixed |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2023-10-22 |
| Completion Date | 2025-12-31 |
| Total Area (sqm) | 33463 |
| Project Cost (Lacs) | 6039 |
| Duration (Months) | 27 |
| Registration Fee | 258750 |
Promoter Details
| Promoter Name | SPRING GARDEN |
| Promoter ID | UPRERAPRM70505 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Deepankar Sharma |
| Contractor | Self by Spring Garden |
| Structural Engineer | Mr. Satya Nam Sharan |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 256 | 1316 |
| Khasra | 290 | 5980 |
| Khasra | 291 | 110 |
| Khasra | 292 | 100 |
| Khasra | 294 | 5960 |
| Khasra | 304 | 220 |
| Khasra | 301 | 6190 |
| Khasra | 300 | 13600 |
| Khasra | 295 | 480 |
| Khasra | 303 | 70 |
| Khasra | 257 | 450 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot demarcation is one of the earliest activities. It defines property boundaries, parcel shapes, and plot locations. That the owner of the property is interested to know concerns the boundaries of his/her property. In our project, all plots are well demarcated as per approved plan and easy for physical handing over the plots. |
| Boundary Wall | A boundary wall is "any wall demarcated on, above, or over the physical border between two properties so that it stands on or occupies spa ce on both properties at least partially. The boundary wall offers the property and its occupants a sense of protection and security. Below is specification of our project boundary wall- Height of the boundary wall is 26500 MM Width of boundary wall is 230 MM. |
| Road Work | Project has 12.0 mtrs, 9.00 mtrs and 7.5 mtrs internal road, the approach to the plot in throughout of site is well managed for Vehicle/Pedestrian movement has been designed to minimize conflicts between vehicles and pedestrians. Maximum utilization of the site has been planned. Every plot is provided with approach from vehicular road. Pedestrian pathways which are traffic free connect the plots with the road as well to make the movement uninterrupted. A well planned road network is proposed within the project premises. In our project we provide metal road with bituminous cover/ high strength concrete pavers/tiles will be used as per designed by architect for internal roads. |
| Footpaths | Comfort, continuity, and safety are the governing criteria for the design and construction of pedestrian facilities. A footpath is a type of route designed just for pedestrians and not for other types of traffic such as cars or bicycles. We will provide footpath as per the design and requirement. |
| Water Supply Including Drinking Water Facilities | Safe drinking water, sanitation, and hygiene are fundamental to improving standard of living for people. In our project, ground water will be used. End user shall use their individual RO system as per their requirements. All plot owners will mandatory have cock in their water tank to stop overflow and avoid wastage of water. |
| Sewer System | The sewer system is an essential part of every human settlement. Since combined sewerage system invariably suffers from the main disadvantage of sluggish flow during most period of the year leading to deposition of sewage solids creating foul and offensive conditions. Hence, sewerage and drainage systems shall be proposed separately. Since, it is both diffcult and uneconomical to augment the capacity of the sewerage system later, the proposed sewers shall be designed for maximum expected discharge to cater the requirement of the ultimate development of the said project. Sewage Treatment plant shall be proposed for the treatment of sewage that would generate in the normal housing. Sewage treatment plants process and treat waste waster/ sewage, breaking it down into cleaner " effluent" that can be returned back to nature in a safer, eco friendly form. They help restore ground water balance, curb disease, and stop degradation and pollution of the environment. Centralized sewerage system shall be provided to reduce the freshwater demand of the project, waste water from the National Housing units will be treated as STP. |
| Drain | A detailed storm water drainage system and water harvesting procedures are proposed to recharge groundwater. The prime activities for providing drainage system comprises of - 1. Internal drainage system 2. Ultimate disposal norms adopted 3. In order to determine total run off, rational formula should be used. 4. Underground water recharge pits with perforated filter media shall be used for rain water harvesting. 5. Coefficient of runoff shall be adopted as per manual on rain water harvesting and conservation. |
| Parks | There are two parks and open space in the form of park and garden for every age group as per architect plan. There are several instances where the green cover has been reported to reduce the ambient temperature. |
| Tree Planting | There will be various types of plant as per architect plan. Evergreen plants are proposed to be planted inside the site. Parks shall also be developed by the project prominent. Variety of plants shall be provided for the project in green area. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per local electricity board along with transformer, HT panel, LT panel, Feeder pillar, and DG back for common service like external lightning , STP, Pump room etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Sewage Treatment Plan (STP) will be provided as per architect plan. An sewage network shall collect the sewage and flow by gravity to the proposed sewage treatment plant. Sludge generated from STP shall be rich in organic content and act as excellent fertilizer. |
| Solid Waste Management And Disposal System | There is a proper garbage collection area as per architect plan for solid waste management. Project will adopt a systematic approach for solid waste collection and disposal. The solid waste shall be first segregated as plastic, glass, paper and other waste separately. |
| Water Conservation System | NA |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Ashok Marg |
| Branch Address | PNB 10, Ashok Marg, Lucknow-226010 |
| Account Holder | Spring Garden Collection Account for Spring Grace |
| Account Number | 7177002900001242 |
| IFSC Code | PUNB0717700 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in