Sudarshan Prakriti Vihar

Devganga Constructions Private Limited

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Sept 2024

Completion pending

Pending

12th Jun 2027

Registration No.

UPRERAPRJ498036/11/2024

Project Type

Residential

District

Lucknow

Taluka

Mohanlalganj

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ498036/11/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaMohanlalganj
Start Date2024-09-01
Completion Date2027-06-12
Total Area (sqm)12373
Project Cost (Lacs)2348
Duration (Months)34
Registration Fee67000

Promoter Details

Promoter NameDevganga Constructions Private Limited
Promoter IDUPRERAPRM302549
Mobile84********

Project Team

rolename
ArchitectAr. Arpit Chauhan
ContractorDevganag Construction Private Limited
Structural EngineerAthar Ali

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra533K12373.70

Development Works

work_namedescription
Demarcation of PlotsAs per approved sanctioned plan demarcation of plots have been completed. There are total 48 plots in this projects with fix size of 111.16 sq. mtr. there will be one main entrance and one exit gate in this project.
Boundary WallExisting boundary wall of 6 feet height and 9 inch thick through brick work and foundation brick work of 4 feet under the ground starting wall foundation from 22 inches thickness going up to 18 inch and then 14 inch and finally 9 inch column in brick boundary wall and plaster work inner side and plaster work in front both side.
Road Work12 mtr. and 9 mtr. internal road will be made by rammed earth and then 150mm WBM 40-63 stone / bajraand then 150mm thick PCC and then 125mm thick concrete / RCC
FootpathsThere will be footpaths and made by rammed earth and then 100 mm WBM 40-63 stone / Bajra and then sand work after that pavers will be installed.
Water Supply Including Drinking Water FacilitiesWater supply shall be used till park area drinking water facility to be done by residents.
Sewer SystemSewer system will be made underground which consist by rammed earth and then 100 mm thick PCC and then HOPE pipes double wall and then PCC
DrainDrain will be consist of HOPE pipes double wall and main holes in regular interval.
ParksWater bodies / landscape and kids play area along with green area will be developed. Park area will 1710.99 sq. mtr.
Tree PlantingIn this project we will plant as many trees. Water bodies / landscape and green area will be developed.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity board and consider centralized transformer panel, LT panel, Feeder pillar, and DG back with external lighting and pump room.
Community BuildingsAs this project is plotting hence there will no community building in this project
Treatment and Disposal System of Sewage and Sullage waterThere will be a centralized sewerage system for the entire project and all are connected with to STP. All sewerage water will go to the STP for treatment after treatment water will be recycle and it will use in gardening and other work.
Solid Waste Management And Disposal SystemIn this project we will have waste segregation area. The solid waste will be encouraged for segregation. The dustbins will be provided for segregate waste in the common areas.
Water Conservation SystemA well designed rain water harvesting system as per green area and will be providing for the entire project to conserve water
Energy Management System Including Use of Renewable EnergyThis project is endvisioned as a green sustainable and committed to enviornmental responsibilty and resource efficiency through out the project. The project main aim is to conserve natural resources and implement optimize energy efficient systems,
Fire Protection And Fire Safety SystemAll fire norms will be followed as per local laws and approval from fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThis project do not have social infrastructure and other public amenities.
Emergency Evacuation ServicesThis is ploting project hence this facility will not be there.
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI Bank
BranchSushant Golf City, Lucknow
Branch AddressShop No. 3, Felix Square, Sushant Golf City, Sultanpur road, Lucknow, 226030 Uttar Pradesh
Account HolderDevganga Constructions Pvt Ltd Collection A/C Sudarshan Prakriti Vihar
Account Number740705000629
IFSC CodeICIC0007407

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy