SUMMIT TWIN TOWER
HIGHNESS CONSTRUCTION
Lucknow, Uttar Pradesh
Approved
8th Sept 2021
Pending
7th Sept 2028
Registration No.
UPRERAPRJ962033
Project Type
Commercial
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ962033 |
| Project Status | New |
| Project Category | Commercial |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2021-09-08 |
| Completion Date | 2028-09-07 |
| Total Area (sqm) | 6758 |
| Project Cost (Lacs) | 7825 |
| Duration (Months) | 84 |
| Registration Fee | 78000 |
Promoter Details
| Promoter Name | HIGHNESS CONSTRUCTION |
| Promoter ID | UPRERAPRM177544 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | ALPANA BHARGAVA - JSR ARCHITECTURE AND INTERIORS |
| Contractor | RAMLAKHAN GOND |
| Structural Engineer | PARESH JOHRI - PARESH AND ASSOCIATES |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | 8 | 6758 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| BLOCK A/SUMMIT TWIN TOWER | BSMNT2 | OTHER | 0 | 0 | - |
| BLOCK A/SUMMIT TWIN TOWER | BSMNT | OTHER | 0 | 0 | - |
| BLOCK A/SUMMIT TWIN TOWER | 1 | OTHER | 20 | 1888.08 | - |
| BLOCK A/SUMMIT TWIN TOWER | GF | OTHER | 20 | 1790.28 | 0 |
| BLOCK A/SUMMIT TWIN TOWER | 2 | OTHER | 13 | 844.63 | - |
| BLOCK A/SUMMIT TWIN TOWER | 3 | OTHER | 13 | 844.63 | - |
| BLOCK A/SUMMIT TWIN TOWER | 4 | OTHER | 13 | 844.63 | - |
| BLOCK A/SUMMIT TWIN TOWER | 5 | OTHER | 13 | 844.63 | - |
| BLOCK A/SUMMIT TWIN TOWER | 6 | OTHER | 12 | 841.39 | - |
| BLOCK A/SUMMIT TWIN TOWER | 7 | OTHER | 13 | 844.63 | - |
| BLOCK A/SUMMIT TWIN TOWER | 8 | OTHER | 11 | 724.09 | - |
| BLOCK A/SUMMIT TWIN TOWER | 9 | OTHER | 11 | 739.53 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 1 | OTHER | 0 | 0 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 2 | OTHER | 11 | 1327.6 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 3 | OTHER | 11 | 1327.6 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 4 | OTHER | 7 | 960.4 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 5 | OTHER | 7 | 960.4 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 6 | OTHER | 7 | 974.98 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 7 | OTHER | 7 | 960.4 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 8 | OTHER | 6 | 782.55 | - |
| BLOCK B/ SUMMIT TWIN TOWER | 9 | OTHER | 6 | 782.55 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | PROVIDED WITH REFERENCE TO MAP. SINCE IT IS A COMMERCIAL ONE , MAIN DEMARCATION IS DONE WITH AREA SPECIFIED |
| Boundary Wall | PROVIDED WITH REFERENCE TO ADJACENT PLOT LINES AND AS APPROVED BY LAND DEVELOPMENT AUTHORITY . THE BOUNDARY WALL WILL BE HAVING WIDTH OF 3 FEET AND THE MATERIAL USED FOR BUILDING THE WALL WILL BE REINFORCED CEMENT CONCRETE (RCC). |
| Road Work | INTERNAL ROADS WITH SETBACKS . THE WIDTH OF THE ROAD WILL BE 24 FEET AND THE MATERIAL USED WILL BE REINFORCED CEMENT CONCRETE (RCC). |
| Footpaths | PROVIDED ALONGWITH INTERNAL ROAD .THE WIDTH OF FOOTPATH WILL BE 90CM AND THE HEIGHT OF THE FOOTPATH WILL BE 90 CM AS WELL AND WILL BE MADE OF REINFORCED CEMENT CONCRETE (RCC) MATERIAL .THE FOOTPATH WILL BE 90 CM ABOVE ROAD. |
| Water Supply Including Drinking Water Facilities | PROVIDED OVERHEAD UNDERGROUND WATER TANKS ALONGWITH PUMPS FILTERS WITH MEDIUM DENSITY PIPING SYSTEM OF UPPC ALONG WITH PROPER RO SYSTEM IN PLACE. |
| Sewer System | STP PLANT PROVIDED , WITH REINFORCED CEMENT CONCRETE (RCC) AND HUME PIPES . 1 TANK OF 180 KLD WILL BE AVAILABLE WITH 4 PUMPS. |
| Drain | PROVIDED EXTERNAL AND INTERNAL DRAINAGE SYSTEM |
| Parks | PROVIDED AS PER LANDSCAPE DESIGNS WITH PLEASANTLY LANDSCAPED AREAS ARUND THE BUILDING HAVING SMALL PLANTS AND TREES ALONG WITH MINIMUM 4 FOUNTAINS. |
| Tree Planting | PROVIDED ALONGWITH PLOT BOUNDARY WALL AS PER LANDSCAPE DESIGNS . 2 TERRACE GARDENS ON HIGH FLOOR WITH PLEASANT VIEW OF GREEN PLANTS. |
| Design For Electric Supply Including Street Lighting | PROVIDED AS PER NORMS AN ELECTRIC SCHEMATICAL LAYOUT IS BEING APPROVED AND WILL BE BUILT ACCORDINGLY WITH THE HELP OF 2 TRANSFORMERS OF 2000 KB AND 100 PERCENT BACKUP FACILITY FOR COMMON AND OFFICE AREAS WITH THE HELP OF 4 GENERATORS OF 3200 KWATT |
| Community Buildings | NOT APPLICABLE |
| Treatment and Disposal System of Sewage and Sullage water | PROVIDED AS PER NORMS |
| Solid Waste Management And Disposal System | PROVIDING BIO COMPOSER FOR ORGANIC WASTE AND DUMPING YARD AND OUTSIDE DISPOSAL |
| Water Conservation System | RECYCLED WATER FROM STP ( SEWEGE TREATMENT PLANT) IS PROPOSED FOR GARDENING AND FLUSHING, COOLING TOWERS |
| Energy Management System Including Use of Renewable Energy | NOT APPLICABLE |
| Fire Protection And Fire Safety System | PROVIDED AS PER NORMS AND NATIONAL BUILDING CODE 2016 .FIRE NOC IS ALSO ATTACHED . 1 PROPER FIRE FIGHTING PLANT WILL BE AVAILABLE IN THE BUILDING AS PER STANDARDS PROVIDED BY THE GOVERNMENT. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NOT APPLICABLE |
| Emergency Evacuation Services | PROVIDED FIRE ESCAPE STAIRCASE REFUGE BELOW AND MIMINUM 4 EXIT GATES AT THE TIME OF EMERGENCY FOR EVACUATION. |
| Other Miscellaneous Work | ELECTRONIC SURVEILLANCES , TOILETS WITH SPECIALLY DESIGNED TOILETS FOR PHYSICALLY HANDICAPPED AND PROPER SECURITY CHECK WITH THE HELP OF CLOSED CIRCUIT TELEVISION (CCTV) AT EVERY FLOOR. |
Bank Details
| Bank Name | HDFC BANK |
| Branch | NADAN MAHAL ROAD |
| Branch Address | 244/230, NADAN MAHAL RODA, YAHIAGANJ, LUCKNOW , U.P., 226004 |
| Account Holder | H CONS COLLECTION AC-SUMMIT TWIN TOWER |
| Account Number | 50200069028428 |
| IFSC Code | HDFC0003950 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





