New Launch - India Real Estate Report 2026.

SUMMIT TWIN TOWER

HIGHNESS CONSTRUCTION

Lucknow, Uttar Pradesh

RERA approved

Approved

8th Sept 2021

Completion pending

Pending

7th Sept 2028

Registration No.

UPRERAPRJ962033

Project Type

Commercial

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ962033
Project StatusNew
Project CategoryCommercial
DistrictLucknow
TalukaLucknow
Start Date2021-09-08
Completion Date2028-09-07
Total Area (sqm)6758
Project Cost (Lacs)7825
Duration (Months)84
Registration Fee78000

Promoter Details

Promoter NameHIGHNESS CONSTRUCTION
Promoter IDUPRERAPRM177544
Mobile93********

Project Team

rolename
ArchitectALPANA BHARGAVA - JSR ARCHITECTURE AND INTERIORS
ContractorRAMLAKHAN GOND
Structural EngineerPARESH JOHRI - PARESH AND ASSOCIATES

Land Details

typekhasra_or_plot_noarea_sqmt
Plot86758

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BLOCK A/SUMMIT TWIN TOWERBSMNT2OTHER00-
BLOCK A/SUMMIT TWIN TOWERBSMNTOTHER00-
BLOCK A/SUMMIT TWIN TOWER1OTHER201888.08-
BLOCK A/SUMMIT TWIN TOWERGFOTHER201790.280
BLOCK A/SUMMIT TWIN TOWER2OTHER13844.63-
BLOCK A/SUMMIT TWIN TOWER3OTHER13844.63-
BLOCK A/SUMMIT TWIN TOWER4OTHER13844.63-
BLOCK A/SUMMIT TWIN TOWER5OTHER13844.63-
BLOCK A/SUMMIT TWIN TOWER6OTHER12841.39-
BLOCK A/SUMMIT TWIN TOWER7OTHER13844.63-
BLOCK A/SUMMIT TWIN TOWER8OTHER11724.09-
BLOCK A/SUMMIT TWIN TOWER9OTHER11739.53-
BLOCK B/ SUMMIT TWIN TOWER1OTHER00-
BLOCK B/ SUMMIT TWIN TOWER2OTHER111327.6-
BLOCK B/ SUMMIT TWIN TOWER3OTHER111327.6-
BLOCK B/ SUMMIT TWIN TOWER4OTHER7960.4-
BLOCK B/ SUMMIT TWIN TOWER5OTHER7960.4-
BLOCK B/ SUMMIT TWIN TOWER6OTHER7974.98-
BLOCK B/ SUMMIT TWIN TOWER7OTHER7960.4-
BLOCK B/ SUMMIT TWIN TOWER8OTHER6782.55-
BLOCK B/ SUMMIT TWIN TOWER9OTHER6782.55-

Development Works

work_namedescription
Demarcation of PlotsPROVIDED WITH REFERENCE TO MAP. SINCE IT IS A COMMERCIAL ONE , MAIN DEMARCATION IS DONE WITH AREA SPECIFIED
Boundary WallPROVIDED WITH REFERENCE TO ADJACENT PLOT LINES AND AS APPROVED BY LAND DEVELOPMENT AUTHORITY . THE BOUNDARY WALL WILL BE HAVING WIDTH OF 3 FEET AND THE MATERIAL USED FOR BUILDING THE WALL WILL BE REINFORCED CEMENT CONCRETE (RCC).
Road WorkINTERNAL ROADS WITH SETBACKS . THE WIDTH OF THE ROAD WILL BE 24 FEET AND THE MATERIAL USED WILL BE REINFORCED CEMENT CONCRETE (RCC).
FootpathsPROVIDED ALONGWITH INTERNAL ROAD .THE WIDTH OF FOOTPATH WILL BE 90CM AND THE HEIGHT OF THE FOOTPATH WILL BE 90 CM AS WELL AND WILL BE MADE OF REINFORCED CEMENT CONCRETE (RCC) MATERIAL .THE FOOTPATH WILL BE 90 CM ABOVE ROAD.
Water Supply Including Drinking Water FacilitiesPROVIDED OVERHEAD UNDERGROUND WATER TANKS ALONGWITH PUMPS FILTERS WITH MEDIUM DENSITY PIPING SYSTEM OF UPPC ALONG WITH PROPER RO SYSTEM IN PLACE.
Sewer SystemSTP PLANT PROVIDED , WITH REINFORCED CEMENT CONCRETE (RCC) AND HUME PIPES . 1 TANK OF 180 KLD WILL BE AVAILABLE WITH 4 PUMPS.
DrainPROVIDED EXTERNAL AND INTERNAL DRAINAGE SYSTEM
ParksPROVIDED AS PER LANDSCAPE DESIGNS WITH PLEASANTLY LANDSCAPED AREAS ARUND THE BUILDING HAVING SMALL PLANTS AND TREES ALONG WITH MINIMUM 4 FOUNTAINS.
Tree PlantingPROVIDED ALONGWITH PLOT BOUNDARY WALL AS PER LANDSCAPE DESIGNS . 2 TERRACE GARDENS ON HIGH FLOOR WITH PLEASANT VIEW OF GREEN PLANTS.
Design For Electric Supply Including Street LightingPROVIDED AS PER NORMS AN ELECTRIC SCHEMATICAL LAYOUT IS BEING APPROVED AND WILL BE BUILT ACCORDINGLY WITH THE HELP OF 2 TRANSFORMERS OF 2000 KB AND 100 PERCENT BACKUP FACILITY FOR COMMON AND OFFICE AREAS WITH THE HELP OF 4 GENERATORS OF 3200 KWATT
Community BuildingsNOT APPLICABLE
Treatment and Disposal System of Sewage and Sullage waterPROVIDED AS PER NORMS
Solid Waste Management And Disposal SystemPROVIDING BIO COMPOSER FOR ORGANIC WASTE AND DUMPING YARD AND OUTSIDE DISPOSAL
Water Conservation SystemRECYCLED WATER FROM STP ( SEWEGE TREATMENT PLANT) IS PROPOSED FOR GARDENING AND FLUSHING, COOLING TOWERS
Energy Management System Including Use of Renewable EnergyNOT APPLICABLE
Fire Protection And Fire Safety SystemPROVIDED AS PER NORMS AND NATIONAL BUILDING CODE 2016 .FIRE NOC IS ALSO ATTACHED . 1 PROPER FIRE FIGHTING PLANT WILL BE AVAILABLE IN THE BUILDING AS PER STANDARDS PROVIDED BY THE GOVERNMENT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesPROVIDED FIRE ESCAPE STAIRCASE REFUGE BELOW AND MIMINUM 4 EXIT GATES AT THE TIME OF EMERGENCY FOR EVACUATION.
Other Miscellaneous WorkELECTRONIC SURVEILLANCES , TOILETS WITH SPECIALLY DESIGNED TOILETS FOR PHYSICALLY HANDICAPPED AND PROPER SECURITY CHECK WITH THE HELP OF CLOSED CIRCUIT TELEVISION (CCTV) AT EVERY FLOOR.

Bank Details

Bank NameHDFC BANK
BranchNADAN MAHAL ROAD
Branch Address244/230, NADAN MAHAL RODA, YAHIAGANJ, LUCKNOW , U.P., 226004
Account HolderH CONS COLLECTION AC-SUMMIT TWIN TOWER
Account Number50200069028428
IFSC CodeHDFC0003950

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy