THE SAGE CITY
JUGAL KISHORE & NDBG SAGE CITY LLP
Lucknow, Uttar Pradesh
Approved
9th Mar 2019
Completed
8th Sept 2024
Registration No.
UPRERAPRJ407418
Project Type
Residential
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ407418 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2019-03-09 |
| Completion Date | 2024-09-08 |
| Total Area (sqm) | 100659 |
| Project Cost (Lacs) | 850 |
| Duration (Months) | 66 |
| Registration Fee | 508500 |
Promoter Details
| Promoter Name | JUGAL KISHORE & NDBG SAGE CITY LLP |
| Promoter ID | UPRERAPRM82582 |
| Mobile | 73******** |
Project Team
| role | name |
|---|---|
| Architect | DESIGNER WING |
| Contractor | NOT YET NEEDED REQUIRED AS IT IS A PLOTTING PROJECT |
| Structural Engineer | OM PRAKASH SRIVASTAVA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 493, 494 | 43180 |
| Khasra | 497 | 75910 |
| Khasra | 521, 556, 559, 560, 566, 576, 593, 594 | 42030 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | There are372 plots in the scheme inclusive of residential and 5 percent commercial plots . |
| Boundary Wall | Boundary wall covering whole project will be built. |
| Road Work | Roads have been provided to cater all the plots. The width of the road is in conformity with LIDA guidelines. The roads will be constructed after consolidation of natural earth, thereafter laying of 150 mm thick sub base followed by 75mm thick WBM followed by 25mm thick SDBC |
| Footpaths | No seperate space for foothpaths have been kept.. |
| Water Supply Including Drinking Water Facilities | The provision of one over Head Water Tank has been made to cater the needs of residents. The capacity of the tank will be 300 KL. The water supply will be provided through 110 dia PVC pipes |
| Sewer System | The disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms. |
| Drain | The drainage shall be through K.C. drains. |
| Parks | 6 parks have been provided at various location. The area of the park has been left in conformity with the LIDA norms and guidelines. The park shall be provided with seasonal/ deciduous trees. |
| Tree Planting | 1200 trees shall be planted as per proposed layout plan. Apart from trees, the park shall be provided with regional shrubs, plants, swings for children |
| Design For Electric Supply Including Street Lighting | There is provision of three phase overhead electrical supply lines. The pole shall be placed as per drawings however, pole to pole distance will not be more than 30 meters or at every turn. The street lights shall be provided on every pole. The connection to every dweller shall be provided as per power corporation norms. The transformer of appropriate capacity shall be installed. |
| Community Buildings | No Community Buildings are planned in the project yet. |
| Treatment and Disposal System of Sewage and Sullage water | The disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms. The drainage shall be through K.C. drains. |
| Solid Waste Management And Disposal System | Not required for now as it IS a plotting project. |
| Water Conservation System | No such measures havebeen taken but in future they can plan same |
| Energy Management System Including Use of Renewable Energy | No Measures for now has been taken But Rain Water Harvesting Facility is there for use of Water |
| Fire Protection And Fire Safety System | Not required for now as it a plotting project. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | No such Social Infrastructure is planned .It can be planned later on the discretion of owners buying plots. |
| Emergency Evacuation Services | As for now it is a plotting project only , so emergency evacuation system will be made on the discretion of owners. |
| Other Miscellaneous Work | Under process |
Bank Details
| Bank Name | INDUSIND BANK |
| Branch | ASHIYANA |
| Branch Address | ASHIYANA |
| Account Holder | JUGAL KISHORE AND NDBG SAGE CITY LLP |
| Account Number | 201000951945 |
| IFSC Code | INDB0000723 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in