THE SAGE CITY

JUGAL KISHORE & NDBG SAGE CITY LLP

Lucknow, Uttar Pradesh

RERA approved

Approved

9th Mar 2019

Project completed

Completed

8th Sept 2024

Registration No.

UPRERAPRJ407418

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ407418
Project StatusCompleted
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2019-03-09
Completion Date2024-09-08
Total Area (sqm)100659
Project Cost (Lacs)850
Duration (Months)66
Registration Fee508500

Promoter Details

Promoter NameJUGAL KISHORE & NDBG SAGE CITY LLP
Promoter IDUPRERAPRM82582
Mobile73********

Project Team

rolename
ArchitectDESIGNER WING
ContractorNOT YET NEEDED REQUIRED AS IT IS A PLOTTING PROJECT
Structural EngineerOM PRAKASH SRIVASTAVA

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra493, 49443180
Khasra49775910
Khasra521, 556, 559, 560, 566, 576, 593, 59442030

Development Works

work_namedescription
Demarcation of PlotsThere are372 plots in the scheme inclusive of residential and 5 percent commercial plots .
Boundary WallBoundary wall covering whole project will be built.
Road WorkRoads have been provided to cater all the plots. The width of the road is in conformity with LIDA guidelines. The roads will be constructed after consolidation of natural earth, thereafter laying of 150 mm thick sub base followed by 75mm thick WBM followed by 25mm thick SDBC
FootpathsNo seperate space for foothpaths have been kept..
Water Supply Including Drinking Water FacilitiesThe provision of one over Head Water Tank has been made to cater the needs of residents. The capacity of the tank will be 300 KL. The water supply will be provided through 110 dia PVC pipes
Sewer SystemThe disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms.
DrainThe drainage shall be through K.C. drains.
Parks6 parks have been provided at various location. The area of the park has been left in conformity with the LIDA norms and guidelines. The park shall be provided with seasonal/ deciduous trees.
Tree Planting1200 trees shall be planted as per proposed layout plan. Apart from trees, the park shall be provided with regional shrubs, plants, swings for children
Design For Electric Supply Including Street LightingThere is provision of three phase overhead electrical supply lines. The pole shall be placed as per drawings however, pole to pole distance will not be more than 30 meters or at every turn. The street lights shall be provided on every pole. The connection to every dweller shall be provided as per power corporation norms. The transformer of appropriate capacity shall be installed.
Community BuildingsNo Community Buildings are planned in the project yet.
Treatment and Disposal System of Sewage and Sullage waterThe disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms. The drainage shall be through K.C. drains.
Solid Waste Management And Disposal SystemNot required for now as it IS a plotting project.
Water Conservation SystemNo such measures havebeen taken but in future they can plan same
Energy Management System Including Use of Renewable EnergyNo Measures for now has been taken But Rain Water Harvesting Facility is there for use of Water
Fire Protection And Fire Safety SystemNot required for now as it a plotting project.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNo such Social Infrastructure is planned .It can be planned later on the discretion of owners buying plots.
Emergency Evacuation ServicesAs for now it is a plotting project only , so emergency evacuation system will be made on the discretion of owners.
Other Miscellaneous WorkUnder process

Bank Details

Bank NameINDUSIND BANK
BranchASHIYANA
Branch AddressASHIYANA
Account HolderJUGAL KISHORE AND NDBG SAGE CITY LLP
Account Number201000951945
IFSC CodeINDB0000723

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy