New Launch - India Real Estate Report 2026.

THE WOODS KOHINOOR JANKIPURAM

AESTHETE INFRA VENTURES LLP

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jul 2024

Completion pending

Pending

18th Apr 2029

Registration No.

UPRERAPRJ133352/07/2024

Project Type

Residential

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ133352/07/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaLucknow
Start Date2024-07-01
Completion Date2029-04-18
Total Area (sqm)3306
Project Cost (Lacs)3148
Duration (Months)58
Registration Fee22000

Promoter Details

Promoter NameAESTHETE INFRA VENTURES LLP
Promoter IDUPRERAPRM298249
Mobile99********

Project Team

rolename
ArchitectPUNIT SHRIVASTAVA
ContractorAESTHETE INFRA VENTURES LLP
Structural EngineerCB CHAUDHARY

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPLOT NO GH-073306.41

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER ABSMNTOTHER00-
TOWER AGFOTHER000
TOWER A12 BHK266.95-
TOWER A12 BHK283.88-
TOWER A13 BHK4102.02-
TOWER A22 BHK266.95-
TOWER A22 BHK183.88-
TOWER A23 BHK4102.02-
TOWER A32 BHK266.95-
TOWER A32 BHK183.88-
TOWER A33 BHK4102.02-
TOWER A42 BHK266.95-
TOWER A42 BHK183.88-
TOWER A43 BHK4102.02-
TOWER A52 BHK266.95-
TOWER A52 BHK183.88-
TOWER A53 BHK4102.02-
TOWER A62 BHK266.95-
TOWER A62 BHK183.88-
TOWER A63 BHK4102.02-
TOWER A72 BHK266.95-
TOWER A72 BHK183.88-
TOWER A73 BHK4102.02-
TOWER A82 BHK266.95-
TOWER A82 BHK183.88-
TOWER A83 BHK4102.02-
TOWER A92 BHK266.95-
TOWER A92 BHK183.88-
TOWER A93 BHK4102.02-
TOWER A102 BHK266.95-
TOWER A102 BHK183.88-
TOWER A103 BHK4102.02-
TOWER A112 BHK266.95-
TOWER A112 BHK183.88-
TOWER A113 BHK4102.02-

Development Works

work_namedescription
Demarcation of PlotsAS PER MAP SITE ADDRESS DEMARCATION OF PLOT NO-GH-07, WILL BE DONE SITUATION AT SECTOR-J JANKIPURAM SCHEME, LUCKNOW
Boundary Wall230MM WIDE AND 2.1 METER BOUNDARY WALL OF RCC/ BRICK FILLED, BOUNDARY WALL AT SITE WILL BE MADE OF FLY ASH/CLAY BRICK WITH COULUMN BEAM STRUCTURE. THE HEIGHTS OF BOUNARY WALL WILL BE 6FT PLASTER WILL BE DONE ON BOTH SIDE.
Road WorkCONCRETE / APEX ROAD WILL BE MADE AT THESITE . THE BASE OF ROAD WILL BE FILLED BY RED MURAM. AFTER THAT 2 LAYEROF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACKMWHITE SPEX ROAD WILL BE 7.5MTR TO 12 MT WIDE.
FootpathsPAVER BLOCKS LAIED OVER SAND BASE, FOORTHPATH WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCKS PAVERS.
Water Supply Including Drinking Water FacilitiesALL THE DRINKING WATER SUPPLY TO BE THROUGH TERRACE TANK OF REQUIRED CAPICITY, FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER, WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES, WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS.
Sewer SystemA WELL LAID SEWER SYSTEM CONNECTED TO EXTERNAL SEWER SYSTEM IS PROPOSED. WILL BE CONSTRUCTED AT SITE, ALL WATER DRAIN WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENTS PLANTS.THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION
DrainDRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDEDFOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUNN OFF)
ParksINTERNAL PARK WILL BE PROVIDED. THE PARKS WILL HAVE PLAY EQUIPMENTS AND SITTING BENCHES ETC.
Tree PlantingTHE TREE WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECTAND ALONG THE BPUNDARY WALLS.
Design For Electric Supply Including Street LightingELETRIC SUPPLY PROVIDED THROUGH INDIVIDUALLY TRANSFORMERS AND BY DG SET SUPPLYFOR BACKUP.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterSEWAGE SHALL BE TREATED IN SEWAGE TREATMENTS PLANT (STP) AND THEREAFTERTREATMENTS WATER TO BEUSED FOR IRRIGINATION.
Solid Waste Management And Disposal SystemSHALL BE COLLECTED AT ONE SPECIFIC POINT, FINAL DISPOSAL WILL BE TIED UP WITH AREA NAGAR NIGAM TEAM.
Water Conservation SystemRAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUNDWATER RECHARGING AND OVER FLOW TO BE DISCHARGEDIN THE MUNICIPLA DRAINS.
Energy Management System Including Use of Renewable Energy25 PERCENT OF THE STREET LIGHTS SHALL HAVE SOLAR ENERGY BACKUP.
Fire Protection And Fire Safety SystemAS PER FIRE DRAWING APPROVED BY FIRE DEPARTMENTS WITH FULFILLMENTS OF ALL THE FIRE NORMS.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFIRE STAIRCASE SHALL BE PROVIDED AS PER THE APPROVED FIRE DRAWING FOR EVACUATIONTO OPEN AREAS.
Other Miscellaneous WorkNA

Bank Details

Bank NameAXIS BANK LTD.
BranchALIGANJ , LUCKNOW
Branch Address1ST FLOOR, 30L , BLOCK NO-3, PRAGATI KENDRA, KAPURTHALA, LUCKNOW, UP-226020
Account HolderAEATHETE INFRA VENTURES LLP COLLECTION A/C FOR THE WOODS KOHINOOR JANKIPURAM
Account Number924020027965796
IFSC CodeUTIB0001692

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy