Project Details
| RERA ID | UPRERAPRJ11245 |
| Project Status | Completed |
| Project Category | Residential |
| District | Mathura |
| Taluka | Mathura |
| Start Date | 2011-12-23 |
| Completion Date | 2016-05-31 |
| Total Area (sqm) | 9867 |
| Project Cost (Lacs) | 4371 |
| Duration (Months) | 54 |
| Registration Fee | 54500 |
Promoter Details
| Promoter Name | Mathura-Vrindavan Development Authority |
| Promoter ID | UPRERAPRM19085 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | U.S. Rizwi |
| Contractor | M/s. Jagannath Construction |
| Structural Engineer | Mukesh Babu |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1297 | 9867 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 33 | 1 | 1 BHK | 132 | 40 | - |
| 33 | 1 | 1 BHK | 132 | 40 | - |
| 33 | 1 | 1 BHK | 132 | 40 | - |
| 33 | 1 | 1 BHK | 132 | 40 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | 1 BHK block no. 1 to 28 of sector 2 and 1BHK block no. 3 to 7 of sector 3 n rukmani vihar. Each block having 16 flats. |
| Boundary Wall | No |
| Road Work | 7.50 mt. wide and 9.00 mt. wide road with bituminous road in sector 2 and cement concrete road in sector 3. |
| Footpaths | Interlocking paver tiles as side pattries used as footpath. |
| Water Supply Including Drinking Water Facilities | Water supply connection in each flats. |
| Sewer System | Available |
| Drain | RCC drain networks available. |
| Parks | Park facility available as per layout |
| Tree Planting | Tree planted on road pattries and park. |
| Design For Electric Supply Including Street Lighting | as per norms of UPPCL |
| Community Buildings | Community facility available in sector 3, rukmani vihar. |
| Treatment and Disposal System of Sewage and Sullage water | Sewage system is connected to sewage pumping station in rukmani vihar and SPS sends sewage for treatment at sewage treatment plant by UP JAL NIGAM. |
| Solid Waste Management And Disposal System | Provision of Dustbin |
| Water Conservation System | Yes |
| Energy Management System Including Use of Renewable Energy | N/A (old scheme) |
| Fire Protection And Fire Safety System | All block are situated on road more than required width for fire tender. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Provision of nursing home, school, convenient shopping. Plots are with in scheme. All other Public Amenities available with in 2-3 km. |
| Emergency Evacuation Services | N/A |
| Other Miscellaneous Work | N/A |
Bank Details
| Bank Name | Union Bank of India |
| Branch | Mathura Cantt. |
| Branch Address | Mayur Vihar, Mathura |
| Account Holder | MVDA, Mathura |
| Account Number | 518702010506693 |
| IFSC Code | UBIN0551872 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate