CHANDA GREENS RESIDENCY-1
Madhav Developers
Mathura, Uttar Pradesh
Approved
1st Mar 2024
Pending
5th Feb 2029
Registration No.
UPRERAPRJ386200/05/2024
Project Type
Residential
District
Mathura
Taluka
Mathura
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ386200/05/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Mathura |
| Taluka | Mathura |
| Start Date | 2024-03-01 |
| Completion Date | 2029-02-05 |
| Total Area (sqm) | 25958 |
| Project Cost (Lacs) | 980 |
| Duration (Months) | 60 |
| Registration Fee | 135000 |
Promoter Details
| Promoter Name | Madhav Developers |
| Promoter ID | UPRERAPRM279387 |
| Mobile | 89******** |
Project Team
| role | name |
|---|---|
| Architect | Kanchana Agrawal |
| Contractor | Shokat Ali |
| Structural Engineer | Shiv Kumar Mishra |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 20 | 11200 |
| Khasra | 18 | 3800 |
| Khasra | 23 | 10958 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Residential Plots of different sizes for public and semi public plots as approved by the authorities and demarcated on approved map and accordingly the demarcation will be done on the site. |
| Boundary Wall | It will be the responsibility of the developer to construct the boundary wall around the whole society. No boundary walls is being provided by the developer for the individual plots that boundary wall will be constructed by the buyers. |
| Road Work | Approach road to the site has been paved by MVDA, Demarcation of internal road and earth work on the roads has been done, We propose to develop internal roads with 80MM Interlocking concrete pavers. |
| Footpaths | All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below. |
| Water Supply Including Drinking Water Facilities | An underground tank of 50KL capacity and 200 KL overhead tank has already been built at the site. Drawings of pipelines for water supply and sewerage are being prepared by the consultant, the work for same shall be initiated shortly. |
| Sewer System | Sub-mains with provision to link the disposal to each and every plot through chambers/ manholes will be laid in front of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated. |
| Drain | Rainwater harvesting pits provided at different locations as per the designs, and overflow of rainwater harvesting pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural strom drains. |
| Parks | Park and all green areas have been demarcated. Boundary wall work on parks has been initiated. Actual horticulture work shall be started after completion of civil work. |
| Tree Planting | Trees of different species will be planted on the periphery of the site and along roads, Big leaf trees will also be provided on the periphery. |
| Design For Electric Supply Including Street Lighting | As per the norms of UPPCL, the 11 KVA line till site has been erected and made functional by DVVNL. Drawings for internal electrification has been received, will be submitted to DVVNL for their approval and estimated preparation. |
| Community Buildings | Not Applicable. |
| Treatment and Disposal System of Sewage and Sullage water | As explained above the sewerage and sullage water will be treated in STPs PHYTORID technology STP is processed in the township. |
| Solid Waste Management And Disposal System | Door to door collection of said solid waste arrangement will be made in the township through the maintenance agency which will be assigned maintenance of the society, besides this garbage bins and collection points have been proposed in the township. A tie up with the local municipality for organizing solid waste disposal of this township. |
| Water Conservation System | Rainwater harvesting pits number and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. |
| Energy Management System Including Use of Renewable Energy | No Provision has been made for any renewable Energy Equipment as per size of Project. |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | The township is being developed with reasonably sized greens. |
Bank Details
| Bank Name | AXIS BANK LTD |
| Branch | GOVERDHAN CHOWK |
| Branch Address | GROUND FLOOR, PLOT NO. 215/80/44, PANNA PALACE, GOVERDHAN ROAD, KRISHNA NAGAR, MATHURA, U.P. -281004 |
| Account Holder | MADHAV DEVELOPERS COLLECTION ACCOUNT FOR CHANDA GREENS RESIDENCY -1 |
| Account Number | 924020014521444 |
| IFSC Code | UTIB0002801 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





