GURU KRIPA KUTIR
Shree Badrinath Constructions
Mathura, Uttar Pradesh
Approved
15th Jan 2024
Completed
30th Jun 2026
Registration No.
UPRERAPRJ528444/05/2024
Project Type
Residential
District
Mathura
Taluka
Mathura
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ528444/05/2024 |
| Project Status | Completed |
| Project Category | Residential |
| District | Mathura |
| Taluka | Mathura |
| Start Date | 2024-01-15 |
| Completion Date | 2026-06-30 |
| Total Area (sqm) | 24937 |
| Project Cost (Lacs) | 3034 |
| Duration (Months) | 30 |
| Registration Fee | 130000 |
Promoter Details
| Promoter Name | Shree Badrinath Constructions |
| Promoter ID | UPRERAPRM71329 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Abhishek Bansal |
| Contractor | Sindhi Thekedar |
| Structural Engineer | Avdesh Shastri |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 362(m) , Mauja Chatikara, Mathura | 615 |
| Khasra | 363(m), Mauja Chatikara, mathura | 3121.33 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 3121.33 |
| Khasra | 362(m), Mauja Chatikara, Mathura | 1579.40 |
| Khasra | 364(m), Mauja Chatikara, Mathura | 4600 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 2236.49 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 2236.49 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 3121.33 |
| Khasra | 363(m), Mauja Chatikara, mathura | 3121.33 |
| Khasra | 342, Mauja Chatikara, Mathura | 12140 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 3121.33 |
| Khasra | 347(m), Mauja Chatikara, Mathura | 50.16 |
| Khasra | 347(m), Mauja Chatikara, Mathura | 4428.33 |
| Khasra | 347(m), Mauja Chatikara, Mathura | 449.40 |
| Khasra | 363(m), Mauja Chatikara, Mathura | 3121.33 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 91 | 1 | 105 |
| Villa | 76 | 2 | 76 |
| Villa | 77 | 16 | 76 |
| Villa | 78 | 58 | 78 |
| Villa | 75 | 14 | 72 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | All the plots, Roads, Parks and other amenities of the project will be demarcated as per the size and directions approved by MVDA. The project land will also be demarcated with applicable boundary walls. |
| Boundary Wall | The 2.43m high boundary walls will be constructed in brick and plaster. The walls will be earthquake resistant and will be painted with all weather paint. |
| Road Work | The interlocking paving tiles of 2-3 inches will be installed as wearing course over the compacted granular and subgrade layers. |
| Footpaths | The footpaths will also be of interlocking paving blocks laid over the sand bed on 30-50 mm over a compacted subgrade of selected earth. |
| Water Supply Including Drinking Water Facilities | The potable ground water as per approval by the MVDA will be pumped through submersible set up. The collected water will then be supplied to each individual unit and common facilities of the project. |
| Sewer System | The underground concreted pipes along with lined chambers will be installed in the project to cater for the domestic and common facilities sewer of the project. The Inspection chambers and bends will be constructed as per approved design. The sewer lines will lead to STP. |
| Drain | The lined covered drains with minimum bottom with of 300mm will be constructed along the roads and will lead to natural drain. The drains will be cover with grills. |
| Parks | 5 parks will be developed as per landscape plan. The park will be lush green with facilities for he elderly. |
| Tree Planting | The trees will be planted along the boundary walls, periphery of the project and at all suitable location of the project. |
| Design For Electric Supply Including Street Lighting | The transformer and the overhead distribution system will be installed as per approvals of DVVNL. The height of street lights will be min. 4 m and will have minimum specified lux. |
| Community Buildings | The project has the parking facility and the Satsang Bhawan. Both will be constructed as per approved specification and drawings. |
| Treatment and Disposal System of Sewage and Sullage water | A minimum of 300 KLD, 4 chambers system will be installed in the project to collect and process the sewer waste of the project and bring the effluents level with in the permissible limits specified by the local municipal corporation or the applicable government agency . |
| Solid Waste Management And Disposal System | The solid waste of the project will be collected through different collection boxes and will be disposed off to the specified location by the local authority. |
| Water Conservation System | The rain water harvesting systems will be installed in the project. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | The Satsang Bhawan will be constructed for the devotees. |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per Project requirement. |
Bank Details
| Bank Name | AXIS BANK |
| Branch | MATHURA, UTTAR PRADESH |
| Branch Address | OJAL MALL OPPOSITE HOTEL MUKUND PALACE, JUNCTION ROAD MATHURA ,281001 |
| Account Holder | SHREE BADRINATH CONSRUCTIONS GURU KRIPA KUTIR COLLECTION ACCOUNT |
| Account Number | 923020061115622 |
| IFSC Code | UTIB0000359 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in