New Launch - India Real Estate Report 2026.

GURU KRIPA KUTIR

Shree Badrinath Constructions

Mathura, Uttar Pradesh

RERA approved

Approved

15th Jan 2024

Project completed

Completed

30th Jun 2026

Registration No.

UPRERAPRJ528444/05/2024

Project Type

Residential

District

Mathura

Taluka

Mathura

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ528444/05/2024
Project StatusCompleted
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2024-01-15
Completion Date2026-06-30
Total Area (sqm)24937
Project Cost (Lacs)3034
Duration (Months)30
Registration Fee130000

Promoter Details

Promoter NameShree Badrinath Constructions
Promoter IDUPRERAPRM71329
Mobile98********

Project Team

rolename
ArchitectAbhishek Bansal
ContractorSindhi Thekedar
Structural EngineerAvdesh Shastri

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra362(m) , Mauja Chatikara, Mathura615
Khasra363(m), Mauja Chatikara, mathura3121.33
Khasra363(m), Mauja Chatikara, Mathura3121.33
Khasra362(m), Mauja Chatikara, Mathura1579.40
Khasra364(m), Mauja Chatikara, Mathura4600
Khasra363(m), Mauja Chatikara, Mathura2236.49
Khasra363(m), Mauja Chatikara, Mathura2236.49
Khasra363(m), Mauja Chatikara, Mathura3121.33
Khasra363(m), Mauja Chatikara, mathura3121.33
Khasra342, Mauja Chatikara, Mathura12140
Khasra363(m), Mauja Chatikara, Mathura3121.33
Khasra347(m), Mauja Chatikara, Mathura50.16
Khasra347(m), Mauja Chatikara, Mathura4428.33
Khasra347(m), Mauja Chatikara, Mathura449.40
Khasra363(m), Mauja Chatikara, Mathura3121.33

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa911105
Villa76276
Villa771676
Villa785878
Villa751472

Development Works

work_namedescription
Demarcation of PlotsAll the plots, Roads, Parks and other amenities of the project will be demarcated as per the size and directions approved by MVDA. The project land will also be demarcated with applicable boundary walls.
Boundary WallThe 2.43m high boundary walls will be constructed in brick and plaster. The walls will be earthquake resistant and will be painted with all weather paint.
Road WorkThe interlocking paving tiles of 2-3 inches will be installed as wearing course over the compacted granular and subgrade layers.
FootpathsThe footpaths will also be of interlocking paving blocks laid over the sand bed on 30-50 mm over a compacted subgrade of selected earth.
Water Supply Including Drinking Water FacilitiesThe potable ground water as per approval by the MVDA will be pumped through submersible set up. The collected water will then be supplied to each individual unit and common facilities of the project.
Sewer SystemThe underground concreted pipes along with lined chambers will be installed in the project to cater for the domestic and common facilities sewer of the project. The Inspection chambers and bends will be constructed as per approved design. The sewer lines will lead to STP.
DrainThe lined covered drains with minimum bottom with of 300mm will be constructed along the roads and will lead to natural drain. The drains will be cover with grills.
Parks5 parks will be developed as per landscape plan. The park will be lush green with facilities for he elderly.
Tree PlantingThe trees will be planted along the boundary walls, periphery of the project and at all suitable location of the project.
Design For Electric Supply Including Street LightingThe transformer and the overhead distribution system will be installed as per approvals of DVVNL. The height of street lights will be min. 4 m and will have minimum specified lux.
Community BuildingsThe project has the parking facility and the Satsang Bhawan. Both will be constructed as per approved specification and drawings.
Treatment and Disposal System of Sewage and Sullage waterA minimum of 300 KLD, 4 chambers system will be installed in the project to collect and process the sewer waste of the project and bring the effluents level with in the permissible limits specified by the local municipal corporation or the applicable government agency .
Solid Waste Management And Disposal SystemThe solid waste of the project will be collected through different collection boxes and will be disposed off to the specified location by the local authority.
Water Conservation SystemThe rain water harvesting systems will be installed in the project.
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe Satsang Bhawan will be constructed for the devotees.
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAs per Project requirement.

Bank Details

Bank NameAXIS BANK
BranchMATHURA, UTTAR PRADESH
Branch AddressOJAL MALL OPPOSITE HOTEL MUKUND PALACE, JUNCTION ROAD MATHURA ,281001
Account HolderSHREE BADRINATH CONSRUCTIONS GURU KRIPA KUTIR COLLECTION ACCOUNT
Account Number923020061115622
IFSC CodeUTIB0000359

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy