New Launch - India Real Estate Report 2026.

GURU KRIPA VILLAS

SRI KESHAVAM DEVELOPERS

Mathura, Uttar Pradesh

RERA approved

Approved

8th Apr 2021

Project completed

Completed

31st Jul 2024

Registration No.

UPRERAPRJ912398

Project Type

Residential

District

Mathura

Taluka

Mathura

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ912398
Project StatusCompleted
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2021-04-08
Completion Date2024-07-31
Total Area (sqm)26130
Project Cost (Lacs)1468
Duration (Months)40
Registration Fee136000

Promoter Details

Promoter NameSRI KESHAVAM DEVELOPERS
Promoter IDUPRERAPRM140421
Mobile98********

Project Team

rolename
ArchitectAbhishek Bansal
ContractorSindhi Thekedar
Structural EngineerVikas Verma

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraKh. No 341(KA), 341(KHA), 342(KA), 342(KHA), 343, 346, 347, 348, 349, 350(KA), 351, 352- Mauja Govindpur, Mathura26130

Development Works

work_namedescription
Demarcation of PlotsAll the Plots will be demarcated as per the layout plan approved by Mathura-Vrindavan Development Authority. The state of Art measurements will be conducted to keep the orientations and dimensions as per approved layout.
Boundary Wall8 feet high boundary wall will be constructed at all open locations of the project periphery to create a single access colony. The earthquake resistant brick-wall with deep foundation and pillars will be constructed and laid in cement mortar. Plastered and painted to enhance asthetics
Road WorkEarth would be compacted to longitudinal and transverse slopes then an aggregate layers would be laid and compacted to desired density and topped with sand and 4-6 inches of M-20 paver blocks
FootpathsFoot paths will be laid at the periphery of parks . Earth will be compacted and Paver blocks will be laid over sand for smooth walks.
Water Supply Including Drinking Water FacilitiesIndividual or joint Submersible PVC pipes would be installed for each plot as approved by MVDA. The PVC pipes would be deeper than the Water Table. The contraptions for water connection would be provided for each plot.
Sewer SystemSub surface sewer system would be laid through out the project. The individual septic tanks to cater for the domestic needs would be constructed for all plots. The wastes would then be transferred to mechanical STP and then disposed off to the municipal sewer line.
DrainLined/ Unlined drain both Surface and subsurface will be installed through out the project. The check points will be constructed to clear the blockage. The drain would be laid as per levels and slopes to assist easy and early drain-off.
ParksThree big and 7 small lush green parks will be provided as per approved layout and landscape. the Parks will be provided with bench and the trees along the periphery.
Tree PlantingVarious types of trees will be planted at all possible location of the project. Primarily at the periphery of parks and along the boundary wall.
Design For Electric Supply Including Street LightingElectric supply and common street lighting will be provided as per approved designs of DVVNL. A dedicated transformer with designated load of the project as per DVVNL will be installed .
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterA mechanical Sewage treatment plant will be installed in the project spanning to approximately 55 square meters. State of art technology will be used to treat the sewage and dispose the permissible waste in to the municipal sewer
Solid Waste Management And Disposal Systema 15sq.m areas Dalab ghar will be constructed for the disposal of waste . In addition to it the Dustbins will be installed at all common locations of the project
Water Conservation System1.8X1.57 m RWH Pits going 10m deep with Sand , Gravel and Ballast layer of a meter each to recharge the water table catering the runoff of the project land will be installed at all designated locations of the project
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAny work that will be required to improve the facilities of the project.

Bank Details

Bank NameAxis Bank Ltd.
BranchMathura
Branch AddressOjal Mall, Junction Road, Mathura
Account HolderSri Keshvam Developers
Account Number921020012626515
IFSC CodeUTIB0000359

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy