KESHAV MAJESTIC-PHASE-3

Braj Bhoomi Buildtech Pvt. Ltd

Mathura, Uttar Pradesh

RERA approved

Approved

1st Dec 2023

Completion pending

Pending

4th Oct 2028

Registration No.

UPRERAPRJ862697/02/2024

Project Type

Residential

District

Mathura

Taluka

Mathura

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ862697/02/2024
Project StatusNew
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2023-12-01
Completion Date2028-10-04
Total Area (sqm)1343
Project Cost (Lacs)4617
Duration (Months)59
Registration Fee12000

Promoter Details

Promoter NameBraj Bhoomi Buildtech Pvt. Ltd
Promoter IDUPRERAPRM38515
Mobile81********

Project Team

rolename
ArchitectAr. Pratibha Verma -Modcon Creative Sketchers Pvt. Ltd.
ContractorRadha Rani Construction Company
Structural EngineerEr. Daya Shanker Sharma-Modcon Creative Sketchers Pvt. Ltd.

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra801270
Khasra7963

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER BGFSTUDIO1227.240
TOWER B1STUDIO1227.24-
TOWER B2STUDIO1227.24-
TOWER B3STUDIO1227.24-
TOWER B4STUDIO1227.24-
TOWER B5STUDIO1227.24-
TOWER B6STUDIO1227.24-
TOWER B7STUDIO1227.24-
TOWER B8STUDIO1227.24-
TOWER B9STUDIO1227.24-
TOWER BGF1 BHK837.160
TOWER B11 BHK837.16-
TOWER B21 BHK837.16-
TOWER B31 BHK837.16-
TOWER B41 BHK837.16-
TOWER B51 BHK837.16-
TOWER B61 BHK837.16-
TOWER B71 BHK837.16-
TOWER B81 BHK837.16-
TOWER B91 BHK837.16-
TOWER B32 BHK259.04-
TOWER B42 BHK259.04-
TOWER B52 BHK259.04-
TOWER B62 BHK259.04-
TOWER B72 BHK259.04-
TOWER B82 BHK259.04-
TOWER B92 BHK259.04-
TOWER B32 BHK259.11-
TOWER B42 BHK259.11-
TOWER B52 BHK259.11-
TOWER B62 BHK259.11-
TOWER B72 BHK259.11-
TOWER B82 BHK259.11-
TOWER B92 BHK259.11-

Development Works

work_namedescription
Demarcation of PlotsNA
Boundary WallNA
Road WorkLaying Bitumin /CC roads with proper longitudinal and cross-sectional road slopes and wlll compacted subgrade with 75mm and 50mm layers of send.
FootpathsLaying of designing Tiles over well compacted subgrade with GSB layers.
Water Supply Including Drinking Water FacilitiesLaying of UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outlet Connection at Underground Tank, as per MEP drawings.
Sewer SystemLaying of DWC pipes and making of circular manholes and rectangular manhole of required size as per MEP drawing with manhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
DrainLaying of DWC/RCC pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of required size for individual Units (In plot Owner Schope), in coordination with Finished formation Levels, Invert level of Manhole and flow rate, as per MEP drawings.
ParksLandscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
Tree PlantingTree plantation of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
Design For Electric Supply Including Street LightingLaying of overhead HT and LT cables from main electricity board connection to transformers and upto plots for individual connections (which shall be be directly obtained by the plot owners from the electricity board) along with fixing of street lights on tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
Community BuildingsClub House, with healh club and other amenities
Treatment and Disposal System of Sewage and Sullage waterConstruction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Solid Waste Management And Disposal SystemConstruction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
Water Conservation SystemInstallation of Rain Water Harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
Energy Management System Including Use of Renewable EnergyEnergy Management by required capacity of the Generator
Fire Protection And Fire Safety SystemAs per Guidelines of the Department of Uttar Pradesh Fire and Emergency Services
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesAs per Guidelines of the Department of Uttar Pradesh Fire and Emergency Services
Other Miscellaneous WorkAs required

Bank Details

Bank NameICICI BANK LIMITED
BranchVRINDAVAN BRANCH
Branch AddressCM. BLDG. NR BALAJI ASHRAM , RATI RAM ROAD., VRINDAVAN-281121
Account HolderMIS. BRAJ BHOOMI BUILDTECH PVT. LTD.-KESHAV MAJESTIC PHASE-3 COLLECTION ACCOUNT
Account Number101705001819
IFSC CodeICIC0001017

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy