Project Details

RERA IDUPRERAPRJ645697
Project StatusNew
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2023-01-13
Completion Date2028-01-12
Total Area (sqm)91837
Project Cost (Lacs)4059
Duration (Months)60
Registration Fee477000

Promoter Details

Promoter NameKrishna Greens Developers
Promoter IDUPRERAPRM224298
Mobile76********

Project Team

rolename
ArchitectKANCHANA AGRAWAL
ContractorNA
Structural EngineerMUKUL SHARMA

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra9016700
Khasra9212640
Khasra9310660
Khasra9513820
Khasra963950
Khasra973940
Khasra983940
Khasra16619540.91
Khasra1672330
Khasra1682650
Khasra1716950

Development Works

work_namedescription
Demarcation of PlotsBy fixing of RCC muddi on all corners of the plots
Boundary Wall230 mm Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and colum structure.
Road WorkLaying of roads with proper longitudinal and cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75mm and 50mm layers of send.
FootpathsLaying of designing Tiles of 40 mm over well compacted subgrade with GSB layers.
Water Supply Including Drinking Water FacilitiesLaying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outet Connection at undrground Tank, as per MEP drawings.
Sewer SystemLaying of SN-4 Pipes DWC pipes and making of circular manholes and rectangular manhole of size 900x800 MM with 600x600 MM Mainhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
DrainLaying of DWC/RCC NP-3 pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of size 700x700 on Main Line, rectangular Catch Basin of size 450x450 for individual Plots (In Plot Owner Schope), de-Silting Chamber of dia 1.5 M and Recharge Well Size 1.2 Dia. in coordination with Finished Formation Levels, Invert level of Manhole and flow rate, as per MEP drawings.
ParksLandscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
Tree PlantingTree plantaion of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
Design For Electric Supply Including Street LightingLaying of overhead HT and LT cables from Main electricity board connection to transformers and upto plots for individual connections (which shall be directly obtained by the plot owners from the electricity board) along with fixing of 30 W 50 W street lights on 9m 11m Steel tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterConstruction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Solid Waste Management And Disposal SystemConstruction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
Water Conservation SystemInstallation of Rain Water harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesTemple, Garbage Area
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI BANK LTD.
BranchICICI BANK HOLIGATE
Branch Address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001.
Account HolderM/S. KRISHNA GREENS DEVELOPERS-COLLECTION ACCOUNT FOR KRISHNA GREENS RESIDENCY
Account Number158505001520
IFSC CodeICIC0001585

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy