New Launch - India Real Estate Report 2026.

SHRI KRISHNA ANANDAM

REGENCY INFRATECH LLP

Mathura, Uttar Pradesh

RERA approved

Approved

17th Jan 2024

Completion pending

Pending

11th Jan 2029

Registration No.

UPRERAPRJ937699/04/2024

Project Type

Residential

District

Mathura

Taluka

Mathura

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ937699/04/2024
Project StatusNew
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2024-01-17
Completion Date2029-01-11
Total Area (sqm)4045
Project Cost (Lacs)4960
Duration (Months)60
Registration Fee25500

Promoter Details

Promoter NameREGENCY INFRATECH LLP
Promoter IDUPRERAPRM274342
Mobile96********

Project Team

rolename
ArchitectShri Samarth Pavan Chaturvedi of Vista Architects
ContractorShri Sudhir Agrawal of B.S. Techno Construct Private Limited
Structural EngineerShri Shubham Jain of Sabadra Designs Private Limited

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGROUP HOUSING GH-05 RUKMANI VIHAR AWASIYA YOJANA SECTOR 14045.43

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
GROUP HOUSEING (A)12 BHK181.05-
GROUP HOUSEING (A)12 BHK182.59-
GROUP HOUSEING (A)14 BHK2131.48-
GROUP HOUSEING (A)22 BHK182.58-
GROUP HOUSEING (A)22 BHK178.41-
GROUP HOUSEING (A)24 BHK1131.49-
GROUP HOUSEING (A)24 BHK1131.48-
GROUP HOUSEING (A)32 BHK182.58-
GROUP HOUSEING (A)32 BHK178.41-
GROUP HOUSEING (A)34 BHK1131.49-
GROUP HOUSEING (A)34 BHK1131.48-
GROUP HOUSEING (A)42 BHK182.58-
GROUP HOUSEING (A)42 BHK178.41-
GROUP HOUSEING (A)44 BHK1131.49-
GROUP HOUSEING (A)44 BHK1131.48-
GROUP HOUSEING (A)52 BHK182.58-
GROUP HOUSEING (A)52 BHK178.41-
GROUP HOUSEING (A)54 BHK1131.49-
GROUP HOUSEING (A)54 BHK1131.48-
GROUP HOUSEING (A)62 BHK182.58-
GROUP HOUSEING (A)62 BHK178.41-
GROUP HOUSEING (A)64 BHK1131.49-
GROUP HOUSEING (A)64 BHK1131.48-
GROUP HOUSEING (A)72 BHK182.58-
GROUP HOUSEING (A)72 BHK178.41-
GROUP HOUSEING (A)74 BHK1131.49-
GROUP HOUSEING (A)74 BHK1131.48-
GROUP HOUSEING (A)82 BHK182.58-
GROUP HOUSEING (A)82 BHK178.41-
GROUP HOUSEING (A)84 BHK1131.49-
GROUP HOUSEING (A)84 BHK1131.48-
GROUP HOUSEING (A)92 BHK182.58-
GROUP HOUSEING (A)92 BHK178.41-
GROUP HOUSEING (A)94 BHK1131.49-
GROUP HOUSEING (A)94 BHK1131.48-
GROUP HOUSEING (A)102 BHK182.58-
GROUP HOUSEING (A)102 BHK178.41-
GROUP HOUSEING (A)104 BHK1131.49-
GROUP HOUSEING (A)104 BHK1131.48-
GROUP HOUSEING (A)12 BHK181.12-
GROUP HOUSEING (A)12 BHK178.39-
GROUP HOUSEING (A)13 BHK1101.76-
GROUP HOUSEING (A)13 BHK1101.77-
GROUP HOUSEING (A)22 BHK181.13-
GROUP HOUSEING (A)22 BHK178.39-
GROUP HOUSEING (A)23 BHK2102.04-
GROUP HOUSEING (A)32 BHK181.13-
GROUP HOUSEING (A)32 BHK178.39-
GROUP HOUSEING (A)33 BHK2102.04-
GROUP HOUSEING (A)42 BHK181.13-
GROUP HOUSEING (A)42 BHK178.39-
GROUP HOUSEING (A)43 BHK2102.04-
GROUP HOUSEING (A)52 BHK181.13-
GROUP HOUSEING (A)52 BHK178.39-
GROUP HOUSEING (A)53 BHK2102.04-
GROUP HOUSEING (A)62 BHK181.13-
GROUP HOUSEING (A)62 BHK178.39-
GROUP HOUSEING (A)63 BHK2102.04-
GROUP HOUSEING (A)72 BHK181.13-
GROUP HOUSEING (A)72 BHK178.39-
GROUP HOUSEING (A)73 BHK2102.04-
GROUP HOUSEING (A)82 BHK181.13-
GROUP HOUSEING (A)82 BHK178.39-
GROUP HOUSEING (A)83 BHK2102.04-
GROUP HOUSEING (A)92 BHK181.13-
GROUP HOUSEING (A)92 BHK178.39-
GROUP HOUSEING (A)93 BHK2102.04-
GROUP HOUSEING (A)102 BHK181.13-
GROUP HOUSEING (A)102 BHK178.39-
GROUP HOUSEING (A)103 BHK2102.04-
GROUP HOUSEING (A)GFSHOP143.500

Development Works

work_namedescription
Demarcation of PlotsNot Applicable
Boundary WallBoundary Wall will be of 2.1 Metres height with RCC Pilar and Bricks work
Road WorkRoad Work will be Plain Cement Concrete 100 mm + Water Bound Macadam 150 mm + Vaccumm Dewatered Flooring 150 mm
FootpathsFootpath work will be of concrete Pavers over Plaint Cement Concrete 10 mm
Water Supply Including Drinking Water FacilitiesWater Supply will be through Two Overhead Water Tanks of 35000 Litres each to be constructed on terrace and a Undergroung Water Tank of capacity 200000 Litres will be contructed under ground for water storage and availabililty which will be filled with Ground Borewell at Project
Sewer SystemUnderground PCC pipes will be laid for sewage system connecting with Sewage Treatment Plant to be installed as per pollution norms.
DrainWater drainage will be provided through the road side ditch connecting to drainage water exit
Parks144.92 Sq. Mtr. Park as proposed in the approved layout will be made with installed Children swings
Tree Planting25 trees along side boundaries will be planted like ashoka tree, palm tree
Design For Electric Supply Including Street LightingElectric supply will be as per layout with PVC pipes with high quality wires, switches, sockets and 6 metres height street poles wth solar lights will be installed
Community Buildings94.90 Sq Mtr. community hall on stilt and first floor as per approved layout will be constructed.
Treatment and Disposal System of Sewage and Sullage waterSewage Treatment Plant will be installed as per norms of pollution 60KLD capacity
Solid Waste Management And Disposal SystemSolid Waste will be disposed off through the Nagar Nigam s garbage disposal system
Water Conservation SystemUnderground water tank of capacity 200000 litres will be constructed and rain water harvesting system as per norms will be constructed
Energy Management System Including Use of Renewable EnergySolar Water heating plant on terrace will be installed and Solar street light will be installed in streets
Fire Protection And Fire Safety SystemFire Fighting system such as fire extinguishers, fire suppression system, fire hydrants and fire sprinklers system will be installed as per fire department norms
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesEmergency Evacuation Stairs has been proposed in the building
Other Miscellaneous WorkThat the Project approved is Group Houseing (A) with 80 flats approved having two wings of 10 floors having 4 unit on each floor and 1 commercial unit at stilt floor.

Bank Details

Bank NameCentral Bank of India
BranchKrishna Nagar, Mathura
Branch AddressCBIN0282344
Account HolderREGENCY INFRATECH LLP- SHRI KRISHNA ANANDAM- COLLECTION ACCOUNT
Account Number5537684879
IFSC CodeCBIN0282344

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy