New Launch - India Real Estate Report 2026.

Vrinda Kunj

Shree Energy Developers Pvt. Ltd.

Mathura, Uttar Pradesh

RERA approved

Approved

1st Mar 2022

Completion pending

Pending

29th Oct 2026

Registration No.

UPRERAPRJ586892

Project Type

Residential

District

Mathura

Taluka

Mathura

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ586892
Project StatusNew
Project CategoryResidential
DistrictMathura
TalukaMathura
Start Date2022-03-01
Completion Date2026-10-29
Total Area (sqm)5898
Project Cost (Lacs)1862
Duration (Months)56
Registration Fee34500

Promoter Details

Promoter NameShree Energy Developers Pvt. Ltd.
Promoter IDUPRERAPRM3808
Mobile92********

Project Team

rolename
ArchitectVijay Gautam- Gautam and Gautam Associates
ContractorMunna Lal Jain- MM Builders
Structural EngineerRavi Shankar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1186590
Khasra11961350
Khasra1194 ,11965570

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
T111 BHK154.97-
T111 BHK154.97-
T111 BHK154.97-
T111 BHK154.97-
T112 BHK182.81-
T112 BHK182.81-
T121 BHK154.97-
T121 BHK154.97-
T121 BHK154.97-
T121 BHK154.97-
T122 BHK182.81-
T122 BHK182.81-
T131 BHK154.97-
T131 BHK154.97-
T131 BHK154.97-
T131 BHK154.97-
T132 BHK182.81-
T132 BHK182.81-
T141 BHK154.97-
T141 BHK154.97-
T141 BHK154.97-
T141 BHK154.97-
T142 BHK182.81-
T142 BHK182.81-
T151 BHK154.97-
T151 BHK154.97-
T151 BHK154.97-
T151 BHK154.97-
T152 BHK182.81-
T152 BHK182.81-
T161 BHK154.97-
T161 BHK154.97-
T161 BHK154.97-
T161 BHK154.97-
T162 BHK182.81-
T162 BHK182.81-
T171 BHK154.97-
T171 BHK154.97-
T171 BHK154.97-
T171 BHK154.97-
T172 BHK182.81-
T172 BHK182.81-
T181 BHK154.97-
T181 BHK154.97-
T181 BHK154.97-
T182 BHK182.81-
T182 BHK182.81-

Development Works

work_namedescription
Demarcation of PlotsKhasra No. 1196,1194,1186 MI, Vrinda Kunj Mauza, Sunrakh Banger, Behind Prem Mandir, Vrindavan, Mathura, Uttar Pradesh, PIN-281121.
Boundary WallYes, RCC and Brick Work.
Road WorkYes, 16MM Pavel Interlocking / Black Top as per Sanctioned Plans.
FootpathsYes, Footpaths will be constructed using interlocking as Per Sanctioned Plans.
Water Supply Including Drinking Water FacilitiesYes, Water Supply to be collected in under ground using water reservoirs and terrace tanks as per Plans.
Sewer SystemYes, Proper Sewerage will be constructed using RCC/ UPVC pipes as per drawings and will be treated with STP.STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
DrainDraining system will be constructed using R.C.C. / PVC Pipes as per drawings.
ParksLandscaping , Horticulture work and Plantation as per sanctioned Plans.
Tree PlantingSufficient No. of Trees as per Sanctioned Plans will be planted in the Project.
Design For Electric Supply Including Street LightingHT electrical supply will be made by competent authority, a sub station (if required) will be set up in Project as per drawings and LT electrical supply/ Power backup.
Community BuildingsNO
Treatment and Disposal System of Sewage and Sullage waterSewerage Treatment Plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be used in flushing gardening
Solid Waste Management And Disposal SystemSolid Waste will be collected manually and disposal will be done.
Water Conservation SystemWater Conservation will be done by rain water harvesting system and through sewage treatment Plant ( STP)
Energy Management System Including Use of Renewable EnergyGood quality and approved brand equipment will be used in sub station to minimize energy loss as per norms and approved drawings.
Fire Protection And Fire Safety SystemFire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper Water supply and sanitary facilities on Ground Floor of Every Tower
Emergency Evacuation ServicesFire staircase refuge area will provided as per requirement for evacuation in case of any emergency.
Other Miscellaneous WorkProper Security system including Security Guard, CCTV Cameras and controlled access will be made available.

Bank Details

Bank NameAxis Bank Limited
BranchVrindavan, Uttar Pradesh
Branch AddressVrindavan Chatikara Road, Opposite Kripalu Hospital, Vrindavan, Mathura, Uttar Pradesh,PIN-281121
Account HolderShree Energy Developers Pvt. Ltd. Collection Account for Vrinda Kunj
Account Number922020006825084
IFSC CodeUTIB0000794

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy