New Launch - India Real Estate Report 2026.

GOLF GREEN Extn.

Gateway Global Buildwell Private Limited

Meerut, Uttar Pradesh

RERA approved

Approved

7th Dec 2019

Project completed

Completed

5th Jun 2025

Registration No.

UPRERAPRJ841528

Project Type

Residential

District

Meerut

Taluka

Meerut

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ841528
Project StatusCompleted
Project CategoryResidential
DistrictMeerut
TalukaMeerut
Start Date2019-12-07
Completion Date2025-06-05
Total Area (sqm)4228
Project Cost (Lacs)286
Duration (Months)66
Registration Fee26500

Promoter Details

Promoter NameGateway Global Buildwell Private Limited
Promoter IDUPRERAPRM108362
Mobile96********

Project Team

rolename
ArchitectMOHIT BHATNAGAR
ContractorC.B.KASHYAP
Structural EngineerN.A.

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra6183405
Khasra619823.3

Development Works

work_namedescription
Demarcation of PlotsAll plots have been marked as per approved map of Meerut development authority.Numbering of all plots have been done and a curve stone reflecting plot number will be placed on right hand side on front corner of plot.
Boundary WallA wall made of bricks with dust and cement having RCC pillers in between has been made 5 ft.above the ground level with terecota paint over it from all three sides for safty purpose barbered wire fencing has been put above the wall.
Road WorkAll roads including approach road will be butamin black top with 40 Mm. stone -4" layer above brick layer covered by 1"butamin premix layer.
Footpaths1.5 mtr.foot path has been left on side of butamin black top road with boundry 1ft.height made of bricks.
Water Supply Including Drinking Water FacilitiesWater connection will be provided from our main concelled water line out side the plot on road side only.water will be provided from overhead water tank already constructed in phase first .
Sewer SystemUnderground concelled cemented pipes have been put as per approved map under the pathways.
DrainStorm water to be put in open drain out side the plot and will be carried to R.W.H bores.
ParksA 1 ft.boundry wall made up of bricks above RCC level on the area marked as park in approved map .sitting benches will be placed in park with green grass in open areas or park.
Tree PlantingTree plantition will be done on road side footpath and parks has per specified in approved map.
Design For Electric Supply Including Street LightingUnderground electric connection will be provided from nearest Feeder pillers at the cost of customer.Feeder pillers will be situated in campus.Buyer will get the electric connection from feeder piller by under ground cable at customer_s cost of concelled PVC cotted cables.Street light will be provided by the company solar/LED on iron poles as per marked in approved map.
Community BuildingsThe project does not have any community building as per approved map.
Treatment and Disposal System of Sewage and Sullage waterAll sewage and sullage water will be carrier through concelled cemented pipes to S.T.P. and will be further treated and reused for plants
Solid Waste Management And Disposal SystemSolid waste will be disposed by decomposing solid waste with chemical treatment in a chamber 8 ft by 6 ft surronded by brick wall on park side.
Water Conservation SystemRain water harvesting will be done by collecting rain water by drains through a 6 inches bourwell after natural filteration.
Energy Management System Including Use of Renewable EnergySolar lightning has been used for energy conservation and drawings have been designed for ample use of day light to minimise lightning energy use.
Fire Protection And Fire Safety SystemWater hause pipes will be left for water sprinkling in case of fire send buckets will be placed on road side.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe project is small plotted development project having only 21 resendential plots so do not have any social infrastructure.
Emergency Evacuation ServicesIs not related to our small plotted devlopment project.
Other Miscellaneous WorkFibre optic cable has been laid for 24 hours survelliance through CCTV cameras.

Bank Details

Bank NameState bank of India
BranchAapka BazarBegum BridgeMeerut
Branch AddressAapka BazarBegum BridgeMeerut
Account HolderGateway Global Builwell Pvt.Ltd.
Account Number35301014300
IFSC CodeSBIN0001562

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy