PADAMNABH HEIGHTS
MEERUT INFRATECH PRIVATE LIMITED
Meerut, Uttar Pradesh
Approved
4th May 2023
Pending
31st Mar 2028
Registration No.
UPRERAPRJ366040
Project Type
Residential
District
Meerut
Taluka
Meerut
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ366040 |
| Project Status | New |
| Project Category | Residential |
| District | Meerut |
| Taluka | Meerut |
| Start Date | 2023-05-04 |
| Completion Date | 2028-03-31 |
| Total Area (sqm) | 2690 |
| Project Cost (Lacs) | 1658 |
| Duration (Months) | 59 |
| Registration Fee | 18500 |
Promoter Details
| Promoter Name | MEERUT INFRATECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM241904 |
| Mobile | 80******** |
Project Team
| role | name |
|---|---|
| Architect | VINAY GOEL |
| Contractor | BRIJPAL |
| Structural Engineer | AMIT KUMAR |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 207 | 2548 |
| Plot | 2 | 332.56 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | GF | 3 BHK | 1 | 69.95 | 0 |
| 1 | GF | 3 BHK | 1 | 69.95 | 0 |
| 1 | GF | 3 BHK | 1 | 68.26 | 0 |
| 1 | GF | 3 BHK | 1 | 74.20 | 0 |
| 1 | GF | 3 BHK | 1 | 69.94 | 0 |
| 1 | GF | 3 BHK | 1 | 69.95 | 0 |
| 1 | GF | 3 BHK | 1 | 74.22 | 0 |
| 1 | GF | 3 BHK | 1 | 68.25 | 0 |
| 1 | 1 | 3 BHK | 1 | 69.95 | - |
| 1 | 1 | 3 BHK | 1 | 69.95 | - |
| 1 | 1 | 3 BHK | 1 | 68.26 | - |
| 1 | 1 | 3 BHK | 1 | 74.20 | - |
| 1 | 1 | 3 BHK | 1 | 69.94 | - |
| 1 | 1 | 3 BHK | 1 | 69.95 | - |
| 1 | 1 | 3 BHK | 1 | 74.22 | - |
| 1 | 1 | 3 BHK | 1 | 68.25 | - |
| 1 | 2 | 3 BHK | 1 | 69.95 | - |
| 1 | 2 | 3 BHK | 1 | 69.95 | - |
| 1 | 2 | 3 BHK | 1 | 68.26 | - |
| 1 | 2 | 3 BHK | 1 | 74.20 | - |
| 1 | 2 | 3 BHK | 1 | 69.94 | - |
| 1 | 2 | 3 BHK | 1 | 69.95 | - |
| 1 | 2 | 3 BHK | 1 | 74.22 | - |
| 1 | 2 | 3 BHK | 1 | 68.25 | - |
| 1 | 3 | 3 BHK | 1 | 69.95 | - |
| 1 | 3 | 3 BHK | 1 | 69.95 | - |
| 1 | 3 | 3 BHK | 1 | 68.26 | - |
| 1 | 3 | 3 BHK | 1 | 74.20 | - |
| 1 | 3 | 3 BHK | 1 | 69.94 | - |
| 1 | 3 | 3 BHK | 1 | 69.95 | - |
| 1 | 3 | 3 BHK | 1 | 74.22 | - |
| 1 | 3 | 3 BHK | 1 | 68.25 | - |
| 1 | 4 | 3 BHK | 1 | 69.95 | - |
| 1 | 4 | 3 BHK | 1 | 69.95 | - |
| 1 | 4 | 3 BHK | 1 | 68.26 | - |
| 1 | 4 | 3 BHK | 1 | 74.20 | - |
| 1 | 4 | 3 BHK | 1 | 69.94 | - |
| 1 | 4 | 3 BHK | 1 | 69.95 | - |
| 1 | 4 | 3 BHK | 1 | 74.22 | - |
| 1 | 4 | 3 BHK | 1 | 68.25 | - |
| 1 | 5 | 3 BHK | 1 | 69.95 | - |
| 1 | 5 | 3 BHK | 1 | 69.95 | - |
| 1 | 5 | 3 BHK | 1 | 68.26 | - |
| 1 | 5 | 3 BHK | 1 | 74.20 | - |
| 1 | 5 | 3 BHK | 1 | 69.94 | - |
| 1 | 5 | 3 BHK | 1 | 69.95 | - |
| 1 | 5 | 3 BHK | 1 | 74.22 | - |
| 1 | 5 | 3 BHK | 1 | 68.25 | - |
| 1 | 6 | 3 BHK | 1 | 69.95 | - |
| 1 | 6 | 3 BHK | 1 | 69.95 | - |
| 1 | 6 | 3 BHK | 1 | 68.26 | - |
| 1 | 6 | 3 BHK | 1 | 74.20 | - |
| 1 | 6 | 3 BHK | 1 | 69.94 | - |
| 1 | 6 | 3 BHK | 1 | 69.95 | - |
| 1 | 6 | 3 BHK | 1 | 74.22 | - |
| 1 | 6 | 3 BHK | 1 | 68.25 | - |
| 1 | 7 | 3 BHK | 1 | 69.95 | - |
| 1 | 7 | 3 BHK | 1 | 69.95 | - |
| 1 | 7 | 3 BHK | 1 | 68.26 | - |
| 1 | 7 | 3 BHK | 1 | 74.20 | - |
| 1 | 7 | 3 BHK | 1 | 69.94 | - |
| 1 | 7 | 3 BHK | 1 | 69.95 | - |
| 1 | 7 | 3 BHK | 1 | 74.22 | - |
| 1 | 7 | 3 BHK | 1 | 68.25 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | DEMARCATION OF PLOT HAS BEEN COMPLETED. |
| Boundary Wall | 2 METER HIGH 9" THICK BRICK WALL WITH RCC COLOUMN AT 4 MT C/C DISTANCE, PLASTERED ON BOTH SIDE WILL BE PROVIDED. |
| Road Work | 60/80 MM THICK CEMENT INTERLOCKING TILES OF APPROVED COLOUR AND SHAPE AS PER PWD SPECIFICATIONS WILL BE LAID ON ALL PATHWAYS AND DRIVEWAYS. |
| Footpaths | CEMENTED FOOTPATH WILL BE PROVIDED ON ALL ROADS. |
| Water Supply Including Drinking Water Facilities | AN OVERHEAD TANK WATERTANK ON TERRACE OF 30000 LTR WILL BE PROVIDED FOR 24 HOURS WATER SUPPLY. 2 SUBMERSIBLE PUMP OF 10" BORE WITH 5KW MOTOR WILL BE PROVIDED FOR FILLING THE TANK. |
| Sewer System | A STP OF 45 K.L.O. WILL BE PROVIDED FOR TREATMENT OF COLLECTED SEWER. THE SEWER WILL BE COLLECTED FROM THE TOILETS AND CONNECTED TO STP BY PVC FOR VERTICAL STAG AND 10" SOIL PIPE FOR HORIZONTAL LINE UP TO STP. |
| Drain | UNDERGROUND DRAIN OF 8"/6" PVC PIPE WITH AMPLE CATCHING CHAMBER WILL BE PROVIDED IN ALL OPEN SURFACES. THIS DRAIN WILL BE CONNECTED TO NALA(MUNICIPAL CORPORATION) RUNNING IN FRONT OF THE SITE. |
| Parks | NOT APPLICABLE |
| Tree Planting | 20 TREES WILL BE PLANTED NEAR THE BOUNDRYWALL. |
| Design For Electric Supply Including Street Lighting | 450 KW TRANSFORMER WILL BE INSTALLED AT SITE. THE ELECTRICITY FROM THIS IS CONNECTED TO ALL FLATS, COMMON AREA, LIFT, SUBMERSIBLE PUMP, STREET LIGHT AND ALL OTHER COMMON AREAS. STREET LIGHT NEAR THE BOUNDRY AT EVERY 25 MTR DISTANCE WILL BE PROVIDED EITHER WALL MOUNTED OR POLE MOUNTED. |
| Community Buildings | NOT APPLICABLE |
| Treatment and Disposal System of Sewage and Sullage water | ALL THE TREATED SEWAGE FROM THE STP AND SULLAGE WATER WILL BE DISPOSED BY CONNECTING IT TO NALA IN FRONT OF THE SITE. |
| Solid Waste Management And Disposal System | 2 SEPERATE SHAFT OF .45Q WILL BE PROVIDED CONNECTED TO EACH FLOOR FOR WET AND DRY GARBAGE SEPERATELY. A COLLECTION CHAMBER AT STILT FLOOR WILL BE PROVIDED AFTER COLLECTING IT IN COLLECTION CHAMBER. IT WILL BE DISPOSED OFF ACCORDINGLY. |
| Water Conservation System | ALL RAIN WATER FROM ROOFTOP WILL BE COLLECTED AND TRANSPORTED THROUGH 8" PIPE OF PVC TO RAIN WATER HARVESTING PIT AND THAT IS CONNECTED TO RECHARGE PIT OF SPECIFIED SIZE FILLED WITH STONE, BRICKBLAST AND SAND. THIS WATER IS DISPOSED OFF IN EARTH VIA 8" BOARING. |
| Energy Management System Including Use of Renewable Energy | NOT APPLICABLE |
| Fire Protection And Fire Safety System | FIRE NOC HAS BEEN OBTAINED AND UPLOADED ON THE PORTAL. FIRE HYDRANT SYSTEM AND FIRE EXTINGUISHERS WILL BE INSTALLED. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NOT APPLICABLE |
| Emergency Evacuation Services | A FIRE STAIRCASE OF 1.5 MTR WIDTH WILL BE PROVIDED CONNECTED TO ALL FLOORS AND EXITING ON GROUND FLOOR. THE GATE OF THIS STAIR CASE WILL BE PROVIDED IN THE FIRE RESISTANT MATERIAL. 2 LIFT WITH POWERBACKUP WILL BE PROVIDED. |
| Other Miscellaneous Work | CCTV CAMERA AND SECURITY SERVICE WILL BE PROVIDED. |
Bank Details
| Bank Name | PNB |
| Branch | T P NAGAR |
| Branch Address | T P NAGAR |
| Account Holder | MEERUT INFRATECH PRIVATE LTD COLLECTION ACCOUNT PADAMNABH HEIGHTS |
| Account Number | 0388102900000027 |
| IFSC Code | PUNB0038810 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





