New Launch - India Real Estate Report 2026.

PARAS ESTATE

Rapid Buildtech Pvt.Ltd.

Meerut, Uttar Pradesh

RERA approved

Approved

1st Nov 2024

Completion pending

Pending

27th May 2029

Registration No.

UPRERAPRJ240109/03/2025

Project Type

Residential

District

Meerut

Taluka

Meerut

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ240109/03/2025
Project StatusNew
Project CategoryResidential
DistrictMeerut
TalukaMeerut
Start Date2024-11-01
Completion Date2029-05-27
Total Area (sqm)101009.93
Project Cost (Lacs)17060
Duration (Months)55
Registration Fee491500

Promoter Details

Promoter NameRapid Buildtech Pvt.Ltd.
Promoter IDUPRERAPRM320111
Mobile98********

Project Team

rolename
ArchitectNisar Ahmed Ansari
ContractorShri Ram Construction Company
Structural EngineerRamkrishna Dongar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1784 AND 18066200
Khasra1733 AND 173417027
Khasra1803/1, 1805,1807,181316440
Khasra17994430
Khasra18146490
Khasra17354170
Khasra17334433
Khasra1803/234520
Khasra179810620
Khasra18122150

Development Works

work_namedescription
Demarcation of PlotsAS PER APPROVED LAYLOT PLAN THE PLOT WILL BE DEMARCATED BY BRICK PILARS (LOW HIGHT 2 FEET) TO ALL FOUR SIDES OF THE PLOT BOUNDARY, TO THE EXACT SHAPE, SIZE AND ORIENTATION AS PER SANCTIONED MAP BY MEERUT DEVELOPMENT AUTHORITY
Boundary WallAS PER APPROVED LAYOUT PLAN A 1-8 METER HIGH PRE-FABRICATED/ MS.BRICK BOUNDARY WALL.
Road WorkAS PER APPROVED LAYOUT PLAN PAVER /BITUMEN ROADS WITH SUB-BASE WHEREVER APPLICATION AS PER APPROVED LAYOUT.
FootpathsAS PER APPROVED LAYOUT PLAN PAVER BLOCK/ INTERLOCKING TILES.
Water Supply Including Drinking Water FacilitiesAS PER APPROVED LAYOUT PLAN POTABLE GROUNT WATER SUPPLY.
Sewer SystemAS PER APPROVED LAYOUT PLAN SEWERAGE TREATMENT PLANT AND PIPES.
DrainAS PER APPROVED LAYOUT PLAN A SURFACE DRAIN WATER WILL BE COLLECTED THRIUGH A RCC-NC3 PIPE OF 450-600 MM.
ParksAS PER APPROVED LAYOUT PLAN THE GREEN AREAS WILL LANDSCAPED WITH HARD ANS SOFT LANDSCAPING AS PER DISIGN. THE PARK WILL HAVE FOOTPATH,SITTING AREA AND PLAY AREA FOR CHILDREN.
Tree PlantingAS PER APPROVED LAYOUT PLAN THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATION OF THE PROJECT AND ALONG WILL BOUNDARY WALL.
Design For Electric Supply Including Street LightingAS PER APPROVED LAYOUT PLAN.
Community BuildingsAS PER APPROVED LAYOUT PLAN, FRAME STRUCTURE BUILDING WITH FINISHES.
Treatment and Disposal System of Sewage and Sullage waterAS PER APPROVED LAYOUT PLAN ALL WASTE OF SEWER LINE TO BE COLLECTED AT STP, AFTER TEATED WATER TO BE USED FOR WATERING OF THE IRRIGATION OF PLANT BY FLUSH WATER SYSTEM.
Solid Waste Management And Disposal SystemAS PER APPROVED LAYOUT PLAN ALL WASTE OF SERVICE TO BE COLLECTED AS STPGARBAGE COLLECTION TO BE DONE THROUGH AUTHORISED AGENCY.
Water Conservation SystemAS PER APPROVED LAYOUT PLAN RAIN WATER HARVESTING LINE TO BE LAID, IRRIGATION PLANTS BY FLUSH-WATER SYSTEM.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkAS PER APPROVED LAY LOT PLAN

Bank Details

Bank NameICICI BANK
BranchSHATABDI NAGAR MEERUT
Branch AddressPLOT NO. BC-2,BC-3, SECTOR-1, SATABDI NAGAR MEERUT-250103
Account HolderRAPID BUILDTECH PRIVATE LIMITED.COLLECTION ACCOUNT FOR PARAS ESTATE
Account Number777705358111
IFSC CodeICICI0003581

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy