SAGA HABITAT - VILLAS
ZENITH TOWNSHIP PVT. LTD.
Meerut, Uttar Pradesh
Approved
1st Apr 2016
Completed
14th Nov 2021
Registration No.
UPRERAPRJ11658
Project Type
Residential
District
Meerut
Taluka
Meerut
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ11658 |
| Project Status | Completed |
| Project Category | Residential |
| District | Meerut |
| Taluka | Meerut |
| Start Date | 2016-04-01 |
| Completion Date | 2021-11-14 |
| Total Area (sqm) | 8502 |
| Project Cost (Lacs) | 2308 |
| Duration (Months) | 68 |
| Registration Fee | 48000 |
Promoter Details
| Promoter Name | ZENITH TOWNSHIP PVT. LTD. |
| Promoter ID | UPRERAPRM19923 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | ANKUR BANSAL |
| Contractor | Saamag Projects Limited |
| Structural Engineer | PARVEZ KHAN |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 591 (1) | 4170 |
| Khasra | 591(2) | 3130 |
| Khasra | 591(3) | 3130 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 82 | 1 | 77.19 |
| Villa | 100 | 1 | 77.19 |
| Villa | 81 | 1 | 77.19 |
| Villa | 81 | 1 | 77.19 |
| Villa | 86 | 1 | 77.19 |
| Villa | 90 | 1 | 77.19 |
| Villa | 89 | 1 | 77.19 |
| Villa | 85 | 1 | 77.19 |
| Villa | 94 | 1 | 77.19 |
| Villa | 99 | 1 | 77.19 |
| Villa | 100 | 1 | 77.19 |
| Villa | 91 | 1 | 77.19 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Front Side Meerut- Haridwar Highway, back side Abadi Expansion, Right side Kalam Resturant & left Side vacant plot |
| Boundary Wall | 8 feet high boundary wall on all the sides of 1800 meter, and front 5 feet high of 300 meter |
| Road Work | 18.0 M. wide internal road work is complete & 9.0 M. wide road around the VILLA for circulation is proposed |
| Footpaths | N.A. |
| Water Supply Including Drinking Water Facilities | Under Ground Water Tank 800 KL Raw Water & 800 KL Treated water Tank external water Supply With distribution . |
| Sewer System | External Sewerage with STP of 300 KL is Complete |
| Drain | External storm water drainage with RWH is proposed |
| Parks | Boundary wall of the park is complete |
| Tree Planting | NO OF TREE Proposed 150 no of tree proposed evergreen 75 |
| Design For Electric Supply Including Street Lighting | Total load of Project 667 KW the capacity of transformer is 3*250+ 1*100 KVA |
| Community Buildings | No Community Centre |
| Treatment and Disposal System of Sewage and Sullage water | STP of 300 KLD with treated effluent Storage tank for flushing GardSTP of 300 KLD with treated effluent Storage tank for flushing Gardening System.ening System.Solid waste management System is planned as Per inviorment clearance by (EIA). |
| Solid Waste Management And Disposal System | Solid waste management System is planned as Per inviorment clearance by (EIA). |
| Water Conservation System | Rain Water Harvesting System 3 nos of 6"dia x 4.50 m (Depth) RWH well with 1.50m x 1.50m De-silt and 300mm dia x 50 mtr boring is proposed to be joined. |
| Energy Management System Including Use of Renewable Energy | As per guidelines of ministry of renewable energy Govt. of India. |
| Fire Protection And Fire Safety System | Fire fighting system is not proposed |
| Social Infrastructure And Other Public Amenities Including Public Health Services | N/A |
| Emergency Evacuation Services | N/A |
| Other Miscellaneous Work | Development of Main Gate + Marketing office |
Bank Details
| Bank Name | KOTAK MAHINDRA BANK LTD |
| Branch | C-25, SG-16,GROUND FLOOR, TOWER-2,STELLAR IT PARK |
| Branch Address | SECTOR-62, NOIDA-201309, UTTAR PRADESH |
| Account Holder | ZENITH TOWNSHIP PVT LTD |
| Account Number | 8211935449 |
| IFSC Code | KKVK0005032 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





