SARASWATI GREENS PHASE-1
SARASWATI SAGAR
Meerut, Uttar Pradesh
Approved
1st Apr 2024
Completed
30th Jun 2026
Registration No.
UPRERAPRJ286419/02/2025
Project Type
Residential
District
Meerut
Taluka
Meerut
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ286419/02/2025 |
| Project Status | Completed |
| Project Category | Residential |
| District | Meerut |
| Taluka | Meerut |
| Start Date | 2024-04-01 |
| Completion Date | 2026-06-30 |
| Total Area (sqm) | 39443 |
| Project Cost (Lacs) | 2232 |
| Duration (Months) | 27 |
| Registration Fee | 202500 |
Promoter Details
| Promoter Name | SARASWATI SAGAR |
| Promoter ID | UPRERAPRM336098 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | CHIRAG GUPTA |
| Contractor | VEDICA HANDICRAFT |
| Structural Engineer | KULBHUSHAN MITTAL |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 160 | 505.55 |
| Khasra | 161/1 | 8526 |
| Khasra | 250 | 2989.73 |
| Khasra | 164 | 418.20 |
| Khasra | 165/1 | 83.61 |
| Khasra | 165/2 | 866.39 |
| Khasra | 167AB | 1497 |
| Khasra | 174 | 354.32 |
| Khasra | 170 | 1505.50 |
| Khasra | 175 | 278.67 |
| Khasra | 245AND246 | 19512.36 |
| Khasra | 245 | 1334.29 |
| Khasra | 246 | 2124 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Site is located at Khasra No 160 Part, 161 Part, 164Part, 165/1Part, 165/2Part, 167Part, 170part, 174part,175part,245part, 246part and 250part. Side is located around 200 m from Bijli Bamba-Byepass Road, Meerut. Side is approximate 1 Km from Shatabdi Nagar RRTS station. |
| Boundary Wall | A 2-meter high, 230-mm thick brick wall with RCC columns and beams will be constructed. At the corner facing road, the project logo will be displayed with RERA Number and RERA QR code. Iconic design gate will be fixed at the entrance of the project. |
| Road Work | Form the main entrance gate we have 80mm thick interlocking brick/RCC road throughout the project, whose wideness starts from 10mtrs. |
| Footpaths | 1.5 m wide Footpath is provided for Pedestrian wherever required on the side of road in entry exit locations. Footpath will be build with pavour block tiles . |
| Water Supply Including Drinking Water Facilities | Drinking water supply will be made at the plot. Pipeline will be connected from water Overhead Tank. Water overhead Tank of 150 KLD will be build. |
| Sewer System | We will be providing STP and overflow from the STP will be connected with the drain system. |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with drain line. |
| Parks | Parks / Green area in the project will be approx 6002.70 SQM approx. Children play area will be provided. |
| Tree Planting | Yes, more than 130 Trees of different category such as ornamental, shady and native species shall be planted in the project. |
| Design For Electric Supply Including Street Lighting | Transformer, HT Panel Room, LT Panel Room, Designer Electric Poles, Led Lights will be Provided. All Electrical related workings shall be as per bureau of Indian standards, Indian Electricity rules. |
| Community Buildings | Not provided/Not applicable. |
| Treatment and Disposal System of Sewage and Sullage water | All Sewerage water will go the STP and overflow from the STP will be connected with the Municipal sewerage system. When come into force. |
| Solid Waste Management And Disposal System | Solid waste generated will be will be segregated at its point of generation in the different color bins on the basis of tis biodegradability at a single disposable point, the collection and disposal of the solid waste from the project is done in such a way that it will be scientifically dispose no causing any eyesore or adverse effect to the surroundings. |
| Water Conservation System | Rain water harvesting system with proper rainwater harvesting pit are provided on site, water savings fixture are provided in the building treated water from STP is to be used for flushing, gardening and landscaping purpose in the building, to conserve water and waste as less possible. |
| Energy Management System Including Use of Renewable Energy | We will utilize LED lighting in external and common areas, along with solar lights in landscaped zones. All engineering equipment will be energy-efficient, and we will also recommend that individuals use LED lights and energy-efficient air conditioning systems. |
| Fire Protection And Fire Safety System | Fire hydrants will be installed at the site. Water connection will be arranged for fire hydrants as per requirements. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not to be provided. |
| Emergency Evacuation Services | Plotted development only, hence not applicable. |
| Other Miscellaneous Work | CCTV camera and guard hut will be provided at the entrance of the colony. |
Bank Details
| Bank Name | PUNJAB NATIONAL BANK |
| Branch | MEERUT COLLEGE |
| Branch Address | MEERUT COLLEGE MEERUT |
| Account Holder | SARASWATI SAGAR COLLECTION ACCOUNT FOR SARASWATI GREENS PHASE-1 |
| Account Number | 4842002900000030 |
| IFSC Code | PUNB0484200 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate