New Launch - India Real Estate Report 2026.

SARASWATI VATIKA EXTENSION

SARASWATI BUILDCON

Meerut, Uttar Pradesh

RERA approved

Approved

1st Jul 2020

Project completed

Completed

31st Dec 2024

Registration No.

UPRERAPRJ997927

Project Type

Residential

District

Meerut

Taluka

Meerut

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ997927
Project StatusCompleted
Project CategoryResidential
DistrictMeerut
TalukaMeerut
Start Date2020-07-01
Completion Date2024-12-31
Total Area (sqm)17667
Project Cost (Lacs)1149
Duration (Months)54
Registration Fee93500

Promoter Details

Promoter NameSARASWATI BUILDCON
Promoter IDUPRERAPRM120105
Mobile63********

Project Team

rolename
ArchitectKULBHUSHAN MITTAL
ContractorAKASH MANGLIK
Structural EngineerSHUBHAM PUNDIR

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra293A+B17667

Development Works

work_namedescription
Demarcation of Plotsall plots will be marked on the boundary wall and top of the drain.
Boundary Wall9 Inches thick brick work will be done in boundary wall with plaster and whitewash over it
Road Work1. Earth Work in cutting and filling: 12 mtr. Wide 163 x 7.50 x 0.45 = 550.13 Cu Mtr. 9 mtr. Wide 120 x 5 x 0.45 = 270.00 Cu Mtr. 7.5 mtr. Wide 158 x 4 x 0.45 = 284.40 Cu Mtr. 2. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 7.5 mtr. Wide 158 x 4 x 0.10 = 63.20 Cu Mtr. 5% of Curves = 12.27 Cu Mtr. 3. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 5% of Curves = 31.77 Sq. Mtr. 4. Stone Soiling : (25 - 50) 12 mtr. Wide 150.28 x 7.50 x 0.10 = 112.71 Cu Mtr. 9 mtr. Wide 123 x 5 x 0.10 = 61.50 Cu Mtr. 7.5 mtr. Wide 50.50 x 4 x 0.10 = 20.20 Cu Mtr. 5% of Curves = 8.71 Cu Mtr. 5. Earth Work in cutting and filling: 12 mtr. Wide 150.28 x 3 x 0.10 = 45.08 Cu Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 18.45 Cu Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 7.58 Cu Mtr. 5% of Curves = 3.18 Cu mtr. 5% of Curves = 31.77 Sq. Mtr.
Footpaths1. Earth Work in cutting and filling: 12 mtr. Wide 163 x 7.50 x 0.45 = 550.13 Cu Mtr. 9 mtr. Wide 120 x 5 x 0.45 = 270.00 Cu Mtr. 7.5 mtr. Wide 158 x 4 x 0.45 = 284.40 Cu Mtr. 2. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 7.5 mtr. Wide 158 x 4 x 0.10 = 63.20 Cu Mtr. 5% of Curves = 12.27 Cu Mtr. 3. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 5% of Curves = 31.77 Sq. Mtr. 4. Stone Soiling : (25 - 50) 12 mtr. Wide 150.28 x 7.50 x 0.10 = 112.71 Cu Mtr. 9 mtr. Wide 123 x 5 x 0.10 = 61.50 Cu Mtr. 7.5 mtr. Wide 50.50 x 4 x 0.10 = 20.20 Cu Mtr. 5% of Curves = 8.71 Cu Mtr. 5. Earth Work in cutting and filling: 12 mtr. Wide 150.28 x 3 x 0.10 = 45.08 Cu Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 18.45 Cu Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 7.58 Cu Mtr. 5% of Curves = 3.18 Cu mtr. 5% of Curves = 31.77 Sq. Mtr.
Water Supply Including Drinking Water Facilities1. Over head water tank for a capacity of 150000 Liters 2. Providing and fixing of 140 mm dia PVC pipe pvc special such as bendss, tee, socket cross, clamps etc. Earth work including filling the trenches etc. 450 mtr. 3. Boring of tube well and installation of pump 5 HP 4. Civil work in Misc. Items
Sewer System1. Providing and laying class NP2 pressure pipes with collar tested to 40 Smm head, jointed 450 meter 2. Construction Brick masonry manhole class designation bith cement mortar 1 : 5. 38 Nos.
Drain"Brick Masonry - open surface drains Drains in cementmortar 1 : 6 including earth excavation and disposal after refilling of excavated earth 7.5 cm. Thick bed concrete 1 : 5 : 10, 25 mm thick C.C. 1 : 2 : 4 for filling hunches, including 12 mm Cement plaster 1 : 4 finished with floating cost of neat cement in side drain, top and exposwed sides etc. complete CULVERTS 1 No. 12.00 meter. Long 2 No. 9.00 meter. Long Total length of culverts 30.00 meter. Calculation for 1.0 mtr. Long culvert span 0.30 meter. 1. Eartn work in excavation 1 x 1.00 x 1.35 x 0.50 = 0.675 Cu. Mtr. 2. Cement Concrete in foundation 1 : 3 : 6 1 x 1.00 x 1.35 x 0.10 = 0.135 Cu. Mtr. 3. Brick work in cement mortar C.M 1 : 6 (1 cement : 6 Coarse sand) abutment 2 x 1.00 x 0.46 x 0.15 = 0.138 Cu. Mtr. 2 x 1.00 x 0.35 x 0.30 = 0.21 Cu. Mtr. Total = 0.348 Cu. Mtr. 4. R.C.C. slab 1 : 1.5 : 3 1 x 1.00 x 0.30 x 0.05 = 0.015 Cu. Mtr. 5. Plaster 1 : 4 Cement and C. Send 2 x 1.00 x 0.45 = 0.90 sq. Mtr. 6. R.C.C. slab 1 : 1.5 : 3 1 x 1.00 x 1.00 x 0.15 = 0.15 Cu. Mtr. 7. Steel 1.50 x 0.22 x 0.785 = 0.259 Qtl. Rate per meter length of culvert Total Length of Culvert" 1. Earth work in excavation 10 x 0.76 x 0.45 = 3.42 Cu mtr 2. P.C.C. 1 : 5 : 10 10 x 0.76 x 0.075 = 0.57 Cu mtr. "3. M-100 Brick work in 1: 6 Cement and Core sand 2 x 10.0 x 0.23 x 0.45 = 2.07 Cu mtr." "4. R.C.C. 1 : 1.5 : 3 10 x 0.30 x 0.025 = 0.075 Cu Mtr." "5. 12 mm Thick plaster 1 : 4 1 x 10 x 1.36 = 1360 Sq. Mtr." "Total length of drains 441.00 R. Mtr."
ParksElevated parks with cement curve stone with light poles and plantation and swings for childerns.
Tree PlantingTree plantation shall be done in parks and sides of main roads of the colony.
Design For Electric Supply Including Street LightingElectric supply shall be done by UPPVNL and payment will be made as per electric department estimate and LED street lights will be placed at every pole.
Community BuildingsNOT APPLICABLE
Treatment and Disposal System of Sewage and Sullage waterUnderground STP based on ever clean RCC hollow tanks (ERHT) system.
Solid Waste Management And Disposal SystemNOT APPLICABLE
Water Conservation SystemUnderground rain water harvesting system will be constructed in brick work with RCC Slab as per Govt. Norms.
Energy Management System Including Use of Renewable EnergyNOT APPLICABLE
Fire Protection And Fire Safety SystemFire Hyderant shall be installed on the junctions of the colony.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesNOT APPLICABLE
Other Miscellaneous WorkNOT APPLICABLE

Bank Details

Bank NameUCO BANK
BranchSHASTRI NAGAR MEERUT
Branch AddressSHASTRI NAGAR
Account HolderSARASWATI BUILDCON
Account Number25440210002414
IFSC CodeUCBA0002544

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy