AKASH SHOPPING COMPLEX

NARENDER SINGH CHADHA

Moradabad, Uttar Pradesh

RERA approved

Approved

20th May 2022

Completion pending

Pending

8th May 2027

Registration No.

UPRERAPRJ538912/07/2024

Project Type

Commercial

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ538912/07/2024
Project StatusNew
Project CategoryCommercial
DistrictMoradabad
TalukaMoradabad
Start Date2022-05-20
Completion Date2027-05-08
Total Area (sqm)3026
Project Cost (Lacs)1504
Duration (Months)60
Registration Fee41000

Promoter Details

Promoter NameNARENDER SINGH CHADHA
Promoter IDUPRERAPRM280768
Mobile80********

Project Team

rolename
ArchitectRAJAT ANAND
ContractorNARENDER SINGH CHADHA
Structural EngineerMADAN MOHAN SAHA

Land Details

typekhasra_or_plot_noarea_sqmt
Plot5-CP/001C3201.27

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER - ABSMNTOTHER01505.76-
TOWER - AGFSHOP1216.550
TOWER - AGFSHOP111.460
TOWER - AGFSHOP117.710
TOWER - A1SHOP1216.55-
TOWER - A1SHOP111.46-
TOWER - A1SHOP117.71-
TOWER - A2SHOP1216.55-
TOWER - A2SHOP111.46-
TOWER - A2SHOP117.71-
TOWER - BGFSHOP1013.310
TOWER - BGFSHOP214.510
TOWER - BGFSHOP216.790
TOWER - BGFSHOP125.620
TOWER - BGFSHOP128.460
TOWER - B1SHOP1013.31-
TOWER - B1SHOP214.51-
TOWER - B1SHOP216.79-
TOWER - B1SHOP125.62-
TOWER - B1SHOP128.46-
TOWER - B2SHOP1013.31-
TOWER - B2SHOP214.51-
TOWER - B2SHOP216.79-
TOWER - B2SHOP125.62-
TOWER - B2SHOP128.46-
TOWER - CGFSHOP1016.980
TOWER - CGFSHOP214.480
TOWER - CGFSHOP117.660
TOWER - C1SHOP1016.98-
TOWER - C1SHOP217.66-
TOWER - C1SHOP214.48-
TOWER - C2SHOP1016.98-
TOWER - C2SHOP217.66-
TOWER - C2SHOP214.48-
TOWER - DGFSHOP818.170
TOWER - DGFSHOP218.880
TOWER - DGFSHOP118.910
TOWER - DGFSHOP125.430
TOWER - D1SHOP818.17-
TOWER - D1SHOP218.88-
TOWER - D1SHOP218.91-
TOWER - D1SHOP125.43-
TOWER - D2SHOP818.17-
TOWER - D2SHOP218.88-
TOWER - D2SHOP218.91-
TOWER - D2SHOP125.43-

Development Works

work_namedescription
Demarcation of PlotsNA
Boundary WallThe boundary wall is 3m high that is built is 230mm thick brick wall in first class brick work in a ratio of 1;6 mix, with providing column at every 4mt, expansion joint and beam for high durability damp proof course layer will also laid for moisture resistant purpose .
Road WorkInternal road are 6 Mt. wide. All roads are RCC with proper compaction, 8 inch boulder will be use, ready mixed concrete will be use which is manufactured in fully automatic batching plant and designed up to 100 Mt. load capacity.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWater supply will be provided by developer through over head water tank in each. All water supply pipes elbows, tee , socket etc. will be Uniq make ISI marked.
Sewer SystemSTP(sewerage treatment plant) is proposed by developer (95 KLD) of MBBR technology with clog pump, irrigation pump etc.
DrainProviding and laying cast in site RCC Drain. Strom water lines will be provided by the developer along with roads. All drain pipes And rain water pipes to be make 6kg pressure pipes ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
ParksNA
Tree PlantingTree plantation will be done along the boundaries. It is one of the effective remedial measures to control the air pollution and noise pollution. It also causes aesthetics improvement of the area as well as sustains and supports the biosphere.
Design For Electric Supply Including Street LightingStreet lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mt. electrical sub station are proposed by developer. Wires , switch socket crabtree or anchor roma make , MCB ISI make, conduit ISI marked, D.B Box ISI marked, gang box, fan box, light box, etc. as per ISI norms.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterSTP system has been proposed by the developer for treatment and disposal of sewage and sullage water. sewer lines are around 150-300mm.
Solid Waste Management And Disposal SystemSolid waste management and disposal system will be provided by developer. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
Water Conservation SystemRain water harvesting tank will be constructed by the developer for conservation of water.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemFire fighting instruments will be placed by the developer in each block according to fire NOC. like alarms, hooters, hose reels , hydrant pump, sprinklers pump etc.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staircases will be provided in block for emergency exit.
Other Miscellaneous WorkNA

Bank Details

Bank NamePrathama U.P. Gramin Bank
BranchRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase 2 Moradabad 244001
Account HolderNarender Singh Chadha Collection Account For Akash Shopping Complex
Account Number84322149366161
IFSC CodePUNB0SUPGB5

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy