New Launch - India Real Estate Report 2026.

Akhilesh Plaza

Inderjeet Singh Chadha

Moradabad, Uttar Pradesh

RERA approved

Approved

5th Oct 2021

Completion pending

Pending

4th Oct 2026

Registration No.

UPRERAPRJ415630/08/2024

Project Type

Commercial

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ415630/08/2024
Project StatusNew
Project CategoryCommercial
DistrictMoradabad
TalukaMoradabad
Start Date2021-10-05
Completion Date2026-10-04
Total Area (sqm)2701
Project Cost (Lacs)3302
Duration (Months)60
Registration Fee38000

Promoter Details

Promoter NameInderjeet Singh Chadha
Promoter IDUPRERAPRM298010
Mobile98********

Project Team

rolename
ArchitectR. K. Malik
ContractorMalik and Associates
Structural EngineerUma Kanth Verma

Land Details

typekhasra_or_plot_noarea_sqmt
Plot482701.64

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Akhilesh PlazaBSMNTOTHER01036.11-
Akhilesh PlazaBSMNT2OTHER01036.10-
Akhilesh PlazaGFSHOP2316.680
Akhilesh Plaza1SHOP2616.68-
Akhilesh Plaza2SHOP2816.68-
Akhilesh Plaza3SHOP2216.68-
Akhilesh Plaza4SHOP2226.36-

Development Works

work_namedescription
Demarcation of PlotsAs per approved layout plan we have total 2701.64 sq. meter plot area, in which there will be one main entrance gate with one exit gate. Site is connected with 24 meter wide main road in front connected with station road
Boundary Wall1.8 - 2.1 m high and 200 mm thick boundary wall designed in this project with MS railing as per approved plan. Brick work of 9 inches and RCC work in column and beam will be used and gates will be made of MS steel.
Road WorkTrimix / Asphalt model road will be used in this project which is design by architect.
FootpathsAll internal roads will have narrow footpaths with tiles pavers or equivalent finish.
Water Supply Including Drinking Water FacilitiesAll floors are connected and equipped with domestic water for sanitary activities and STP treated water for flushing system. The STP treated water will also be made available for other purposes
Sewer SystemThis building will equipped with centralized sewerage system for ensuring all sewerage water is directed to the sewerage treatment plan for thourough treatment.
DrainA storm water system will be used to manage storm water from road and other landscape areas. The storm water will be directed to the storm water channel while roof top storm water will be channel to a rain water harvesting PIT.
ParksIN this project there will be no park available
Tree Plantingas per approved layout plan in this project 38 trees are proposed to plant
Design For Electric Supply Including Street LightingWe have designed the system as per local electircity board and consider one centralized transformer panel, LT panel, Feeder Pillar, and DG back for common service like external lights, pump room etc.
Community BuildingsIn this project there will no community building
Treatment and Disposal System of Sewage and Sullage waterThere will be centralized sewerage system and all floors are connected to STP. All sewerage water will go to STP for treatment after treatment water will be recycled and used for other purposes
Solid Waste Management And Disposal SystemThis project will have one waste segregation area and solid waste will be encouraged to segregation with all floors, dustbin will also be provided for collection of waste and there will a proper collection agency who collect all waste.
Water Conservation SystemA well designed rain water harvesting system will be there in this project to recharge PIT.
Energy Management System Including Use of Renewable EnergyThe main aim in this project is envisioned as green sustainable building and resource efficiency throughout the building and to conserve natural resources and implemented to optimize energy efficient system and machinery
Fire Protection And Fire Safety SystemAll fire norms will be followed as per approval from fire department fire sprinklers smoke detectors with pump are being used in this project
Social Infrastructure And Other Public Amenities Including Public Health ServicesThere will be no social infrastructure in this project
Emergency Evacuation ServicesFire staircase will be provided in this project on each floors there will be fire resistance doors and basement will have one access and exit in case of emergency and dedicated assemble area also be there
Other Miscellaneous WorkNA

Bank Details

Bank NameState Bank of India
BranchCivil Lines
Branch AddressSBI, Civil Lines, DT, Moradabad 244001
Account HolderInderjeet Singh Chadha Collection A/C for Akhilesh Plaza
Account Number42725794587
IFSC CodeSBIN0004113

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy