New Launch - India Real Estate Report 2026.

AMRITKUNJ, EKTA VIHAR (SOUTH) SCHEME

Moradabad Development Authority

Moradabad, Uttar Pradesh

RERA approved

Approved

15th Jul 2023

Project completed

Completed

31st Mar 2024

Registration No.

UPRERAPRJ333247

Project Type

Residential

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ333247
Project StatusCompleted
Project CategoryResidential
DistrictMoradabad
TalukaMoradabad
Start Date2023-07-15
Completion Date2024-03-31
Total Area (sqm)26125
Project Cost (Lacs)6914
Duration (Months)9
Registration Fee136000

Promoter Details

Promoter NameMoradabad Development Authority
Promoter IDUPRERAPRM24515
Mobile88********

Project Team

rolename
ArchitectBharat Malik
ContractorRoyal Builders J A Construction Mohd Yusuf Manu Construction
Structural EngineerEr Ashraf Ali

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra3483722
Khasra3558820
Khasra3562266
Khasra35718247
Khasra3614207

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)
1GF1 BHK441.8
2GF1 BHK441.8
3GF1 BHK441.8
4GF1 BHK441.8
5GF1 BHK441.8
6GF1 BHK441.8
7GF1 BHK441.8
8GF1 BHK441.8
9GF1 BHK441.8
10GF1 BHK441.8
11GF1 BHK441.8
12GF1 BHK441.8
13GF1 BHK441.8
111 BHK441.8
211 BHK441.8
311 BHK441.8
411 BHK441.8
511 BHK441.8
611 BHK441.8
711 BHK441.8
811 BHK441.8
911 BHK441.8
1011 BHK441.8
1111 BHK441.8
1211 BHK441.8
1311 BHK441.8
121 BHK441.8
221 BHK441.8
321 BHK441.8
421 BHK441.8
521 BHK441.8
621 BHK441.8
721 BHK441.8
821 BHK441.8
921 BHK441.8
1021 BHK441.8
1121 BHK441.8
1221 BHK441.8
1321 BHK441.8
131 BHK441.8
231 BHK341.8
331 BHK441.8
431 BHK441.8
531 BHK441.8
631 BHK441.8
731 BHK441.8
831 BHK441.8
931 BHK441.8
1031 BHK441.8
1131 BHK441.8
1231 BHK441.8
1331 BHK441.8

Development Works

work_namedescription
Demarcation of PlotsPlotted Development ( 175 Plots) Plots shall be demarcated at site so that allotee may locate his/her plot without any help from MDA. Demarcation of all 175 plots has been started at site. Development related to Building - Demarcation of Building completed. Houses Numbered at site.
Boundary WallPlotted development-175 Plots Boundary wall of the said pocket has already been constructed as per specification attached 1 BHK 207 houses pocket - Boundary wall already constructed at site as per specification attached
Road WorkPlotted development- All Internal roads having 80mm thick Rubber Moulded interlocking Tiles having comp strength-30N /mm2 laid over 1 cement-4 coarse sand-8 brick ballast has been laid . 4-storied (1 BHK ) 207 houses pocket- 80mm thick rubber moulded interlocking tiles laid over granular sub base 200 mm thick has been laid.
FootpathsNo provision for footpath
Water Supply Including Drinking Water FacilitiesPlotted development - Drinking water / potable water shall be 200mm / 150mm PVC water pipe laid in External and Internal water supply pipes and connected to Over head tank nearby. 4 storied 207 Houses Pocket-Potable water shall be provided through a network of pipeline 110mm and 160mm dia having pressure stress 6 Kg/cm2 and water supplied from OHT in the neighbouring park
Sewer SystemPlotted development - 150/ 350mm dia Sewer lines NP3 are being laid over 1 cement, 4 coarse sand, 8 Brick ballast at site as per sanctioned lay-out 1 BHK 207 Houses pocket- same as above but brick work manhole 1.0m x 1.20m x 1.50m and chamber 0.90m x 0.80m x 1.50m respectively
DrainPlotted development - Brick work drains in 1 cement-4 coarse sand-8 brick ballast bed, Walls in brick work M150, 1 cement and 4 coarse sand and culverts with RCC ( 1-1.5-3) is under progress. 1 BHK 207 Houses - Internal Brick work drains ( 1 cement and 6 coarse sand ) 0.35m wide drains have constructed at site as per lay-out plan
ParksThere is only a single park in the lay-out, which is being provided with boundary wall and internal footpath paved with 80mm thk Interlocking tiles
Tree PlantingNo provision has been made for plantation. However there are few tree already in the park
Design For Electric Supply Including Street LightingOver head HT Electricity lines as per sanctioned lay-out and as per requirement , supplied by 250 KVA transformer. LT lines having Aerial Bunch Conductor will be provided . LED street light on Electric poles will be provided
Community Buildingsnot applicable
Treatment and Disposal System of Sewage and Sullage water175 Plots - Septic tank constructed in Brick work with 1-3 cement and coarse sand Brick masonary and covered with slab in RCC 1-1.5-3 and Collective Honeycombed Brick Masonary soak pit constructed for sludge disposal - 2 Nos. 1BHK-207 Houses Pocket- Septic tank of RCC structure sized 12.0m x 3.30m in 1-1.5-3 - 2 Nos. soak pit 2.50m dia and 3.0m deep with honey combed brick work
Solid Waste Management And Disposal SystemNo provision has been made
Water Conservation System2 Nos. Collection tank ( 3.00m x 10.00m size ) RWH structure and connected with RCC Hume pipe 350mm dia has been connected.
Energy Management System Including Use of Renewable EnergyNo provision has been made
Fire Protection And Fire Safety SystemNot applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesNot applicable
Other Miscellaneous WorkNot applicable

Bank Details

Bank NameHDFJ BANK
BranchCIVIL LINES, MORADABAD
Branch AddressPD. SHANKAR DUTT SHARMA MARG, OPP. ELECTION COMMISSION OFFICE, CIVIL LINES, MORADABAD 244001
Account HolderMBD DEV MUTH-AMRITKUNJ-COLL AC
Account Number50100511533511
IFSC CodeHDFC0000303

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy