New Launch - India Real Estate Report 2026.

Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

U.P. Awas Evam Vikas Parishad

Moradabad, Uttar Pradesh

RERA approved

Approved

4th Jun 2020

Project completed

Completed

3rd Sept 2024

Registration No.

UPRERAPRJ685451

Project Type

Residential

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ685451
Project StatusCompleted
Project CategoryResidential
DistrictMoradabad
TalukaMoradabad
Start Date2020-06-04
Completion Date2024-09-03
Total Area (sqm)1227
Project Cost (Lacs)742
Duration (Months)51
Registration Fee11500

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile87********

Project Team

rolename
ArchitectMukesh Ruhela
ContractorUP AVAS VIKAS PARISHAD
Structural EngineerSANJAY JAISWAL

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra308950
Khasra3071910

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
111 BHK1222.77-
121 BHK1222.77-
131 BHK1222.77-
141 BHK1222.77-
211 BHK1222.77-
221 BHK1222.77-
231 BHK1222.77-
241 BHK1222.77-
311 BHK1222.77-
321 BHK1222.77-
331 BHK1222.77-
341 BHK1222.77-

Development Works

work_namedescription
Demarcation of PlotsThe Plot is clearly demarcated in Sector 15 in Majhola No-4 (vistar) Moradabad as per the sanctioned layout the plot is situated facing 9.00 m wide road in layout. Apart from 12.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot.
Boundary WallBoundary wall is not included in the proposed projected. It will be constructed seprate project.
Road WorkRoad work for the whole scheme is sanctioned and tender processing is running for construction. In the proposed project of 144 Nos. of houses 6.00 meter wide road, 7.50 meter wide road 9.00 meter wide and 3.00 meter CC tiles road along two side periphere which is shown in layout is to be constructed as seperate project.
FootpathsFootpaths are not proposed in the sanctioned layout plan of the project.
Water Supply Including Drinking Water FacilitiesOver head tank and Water supply distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project.
Sewer SystemSewer distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project trunk sewer line is laid alreay.
DrainDrainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain.
ParksConstruction of boundary wall/RCC grill of the proposed park in the scheme is sanctioned and tendering is processing. Plantation work is already completed wire fencing is already completed.
Tree PlantingTree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 144 Nos. of houses plantation on 7.50 m and 9.00 m wide road and 6.00 m wide road will be done after drain and road work.
Design For Electric Supply Including Street LightingElectric supply including street lighting is not included in the proposed projected. It will be constructed seprate project.
Community BuildingsCommunity building is proposed in layout of Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
Treatment and Disposal System of Sewage and Sullage waterTreatment and disposal system of sewage and sullage water is proposed in yojna layout Sector 18 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
Solid Waste Management And Disposal SystemSolid waste management and disposal system is proposed in layout Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
Water Conservation SystemIn the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project.
Energy Management System Including Use of Renewable Energyn the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR.
Fire Protection And Fire Safety SystemIn the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPublic Amenities such as schools, hospitals etc are available in nearby vicinity
Emergency Evacuation ServicesSufficient No of staircases is being proposed in the building
Other Miscellaneous WorkAmple amount of open areas park etc are available in Sector 15 in Majhola No-4 (vistar) Moradabad.

Bank Details

Bank NameInduind Bank
BranchSai Tower Near Ekta Dwar
Branch AddressCivil Lines Moradabad
Account HolderExecutive Engineer UPAVP Moradabad
Account Number150733734735
IFSC CodeINDB00001551

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy