Construction of 384 EWS Houses under PMAY (Urban) Scheme at Lakri Fazalpur Gata No. 2407/1, Moradabad

Moradabad Development Authority

Moradabad, Uttar Pradesh

RERA approved

Approved

20th Dec 2018

Project completed

Completed

19th Jun 2021

Registration No.

UPRERAPRJ936809

Project Type

Residential

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ936809
Project StatusCompleted
Project CategoryResidential
DistrictMoradabad
TalukaMoradabad
Start Date2018-12-20
Completion Date2021-06-19
Total Area (sqm)10033
Project Cost (Lacs)1804
Duration (Months)30
Registration Fee55500

Promoter Details

Promoter NameMoradabad Development Authority
Promoter IDUPRERAPRM24515
Mobile99********

Project Team

rolename
ArchitectCIVIL CONSULTANTS
ContractorROYAL BUILDERS AND DEVELOPERS A S CONSTRUCTION SHRI KRISHNA BUILDERS
Structural EngineerA. K. PANDEY

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra2407/110033

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1GFOTHER423.500
11OTHER423.50-
12OTHER423.50-
13OTHER423.50-
2GFOTHER423.500
21OTHER423.50-
22OTHER423.50-
23OTHER423.50-
3GFOTHER423.500
31OTHER423.50-
32OTHER423.50-
33OTHER423.50-
4GFOTHER423.500
41OTHER423.50-
42OTHER423.50-
43OTHER423.50-
5GFOTHER423.500
51OTHER423.50-
52OTHER423.50-
53OTHER423.50-
6GFOTHER423.500
61OTHER423.50-
62OTHER423.50-
63OTHER423.50-
7GFOTHER423.500
71OTHER423.50-
72OTHER423.50-
73OTHER423.50-
8GFOTHER423.500
81OTHER423.50-
82OTHER423.50-
83OTHER423.50-
9GFOTHER423.500
91OTHER423.50-
92OTHER423.50-
93OTHER423.50-
10GFOTHER423.500
101OTHER423.50-
102OTHER423.50-
103OTHER423.50-
11GFOTHER423.500
111OTHER423.50-
112OTHER423.50-
113OTHER423.50-
12GFOTHER423.500
121OTHER423.50-
122OTHER423.50-
123OTHER423.50-
13GFOTHER423.500
131OTHER423.50-
132OTHER423.50-
133OTHER423.50-
14GFOTHER423.500
141OTHER423.50-
142OTHER423.50-
143OTHER423.50-
15GFOTHER423.500
151OTHER423.50-
152OTHER423.50-
153OTHER423.50-
16GFOTHER423.500
161OTHER423.50-
162OTHER423.50-
163OTHER423.50-
17GFOTHER423.500
171OTHER423.50-
172OTHER423.50-
173OTHER423.50-
18GFOTHER423.500
181OTHER423.50-
182OTHER423.50-
183OTHER423.50-
19GFOTHER423.500
191OTHER423.50-
192OTHER423.50-
193OTHER423.50-
20GFOTHER423.500
201OTHER423.50-
202OTHER423.50-
203OTHER423.50-
21GFOTHER423.500
211OTHER423.50-
212OTHER423.50-
213OTHER423.50-
22GFOTHER423.500
221OTHER423.50-
222OTHER423.50-
223OTHER423.50-
23GFOTHER423.500
231OTHER423.50-
232OTHER423.50-
233OTHER423.50-
24GFOTHER423.500
241OTHER423.50-
242OTHER423.50-
243OTHER423.50-

Development Works

work_namedescription
Demarcation of PlotsAs per approved layout plan. The plot shall be demarcated by means of dagbelling.
Boundary WallBoundary wall of brick work shall be provided for a height of 5 feet.
Road WorkGSB (15 cm thick) layer, WMM (10 cm layer) and 80 mm thick interlocking tiles to be laid over prepared subgrade.
FootpathsINTERLOCKING TILES.
Water Supply Including Drinking Water FacilitiesPVC PIPE LINE (100mm dia. ISI mark ) shall be provided for drinking water supply with provision of RCC overhead tank and tubewell. The work shall be carried out as per UPPWD and UP jal nigam shedule of rates and specifications.
Sewer SystemRCC HUME PIPE (300 mm dia NP-3) shall be laid with the provision of RCC manhole and Chamber. The discharge of sewer line shall be connected with septic tank and soakpit.
DrainRCC DRAINS shall be provided to collect storm water and the same will be connected with trunk drain existing in the catchment area.
ParksThere is no provision of park in the scheme but surrounding are of the blocks shall be landscaped for greenery.
Tree PlantingRoad side tree plantation shall be done with the provision of tree guards.
Design For Electric Supply Including Street LightingUnder ground cable shall be provided for carrying electricity up to the blocks with the provision of transformer and street light on poles as per specifications of UPPCL. The work shall be handed over to electricity department after completion.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterThere is no provision of sewage treatment plant in the scheme. Presently septic tank and soakpit system shall be installed for disposal of sewage and sullage water.
Solid Waste Management And Disposal SystemDUSTBINS shall be provided to collected the solid waste from the scheme and shall be carried to municipal garbage dump of the city.
Water Conservation SystemRoof top RAIN WATER HARVESTING system shall be installed in the scheme for water conservation.
Energy Management System Including Use of Renewable EnergyNo any provision of Energy Management system including use of renewable energy.
Fire Protection And Fire Safety SystemNo any provision of fire protection and fire safety system however fire hydrant shall be provided in water line system at appropriate places for easy availability of water in case of out break of any fire.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThere is no provision of specific public health services in the scheme. The existing health facilities near by the scheme area shall cater for the health services for the residents of this scheme.
Emergency Evacuation ServicesProvision of roads all around the blocks shall be sufficient for any emergency situation.
Other Miscellaneous WorkNA

Bank Details

Bank NameBANK OF BARODA
BranchASHIYANA
Branch AddressA-2/106, ASHIYANA PHASE-2, KANTH ROAD, MORADABAD
Account HolderMORADABAD DEVELOPMENT AUTHORITY-RERA-LAKRI FAZALPUR
Account Number57980100001371
IFSC CodeBARB0ASHIYA

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy