Gulmohar Park
NISCHAY HOUSING PRIVATE LIMITED
Moradabad, Uttar Pradesh
Approved
1st Mar 2025
Pending
24th Jul 2029
Registration No.
UPRERAPRJ651459/06/2025
Project Type
Mixed
District
Moradabad
Taluka
Moradabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ651459/06/2025 |
| Project Status | New |
| Project Category | Mixed |
| District | Moradabad |
| Taluka | Moradabad |
| Start Date | 2025-03-01 |
| Completion Date | 2029-07-24 |
| Total Area (sqm) | 213212.57 |
| Project Cost (Lacs) | 10717 |
| Duration (Months) | 53 |
| Registration Fee | 1638750 |
Promoter Details
| Promoter Name | NISCHAY HOUSING PRIVATE LIMITED |
| Promoter ID | UPRERAPRM317953 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Amit Kumar |
| Contractor | Nischay Housing Private Limited |
| Structural Engineer | Piyush Kumar Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1445,1447, 1448,1449,1450,1413,1441,1439,1440,,1437,1435, 1436,1430,1424,1425,1426,1420,,1421,1423,,1432,,1429,,506,507,508,509,1400,1402 | 213212.57 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per approved sanctioned plan this project is having one entry gate and one exit gate with plot size of 213212.57 sq mtr with multipule khasra no/ Gata no. and demarcation is in process in this project . |
| Boundary Wall | 1.8 - 2.1 m high and 200 mm thick boundary wall designed th MS Railing as per approved design brick work of 9 inches and RCC work in column and beam may be used as per design entrance and exit gate will be of MS Steel structure as per approved design |
| Road Work | There will be 9 m , 12 m and 24 m wide roads will be available in entire project Trimix road will be used as per design suggested by architect |
| Footpaths | There will internal roads and will have narrow footpaths and widening area will be there in project for footpaths |
| Water Supply Including Drinking Water Facilities | Entire project is equipped with domestic water for sanitary purpose and activity and STP water will also be made available for irrigation purpose to facilitate this tanks will also be used |
| Sewer System | This project is equipped with a centralized sewer system ensuring all sewerage water is directed to the sewerage treatment plant for through treatment the recycled water will be repurposed for gardening and other uses |
| Drain | A storm water system will be there in this project to manage storm water from roads d other landscape areas the storm water will be directed to the storm water drain channel while storm water will be channeled to a rain water harvesting |
| Parks | This is project is having multipule green areas around the plots and total areas is 991.13 which is specially for parks and there will a specific areas for yoga and equipments for kids playing areas. |
| Tree Planting | In this project we will plant as many trees as we can and there will be a diffrent varities of trees as suggensted by local public |
| Design For Electric Supply Including Street Lighting | We have designed the system as per local electricity board and consider centralized transformer panel road lights will be there in this project |
| Community Buildings | There are Proposed facilities in this project such as institutional area 4500 sqm, for supporting sports activity there is 10508 sqm area specially allocated, community area will be of 3800 sqm and for other facilities there will be 3340sqm . |
| Treatment and Disposal System of Sewage and Sullage water | Centralized sewerage system for this project and all will be connected to STP and all sewerage water will go to the STP for treatment after treatment water will be recycled and will be used for other purposes |
| Solid Waste Management And Disposal System | This project will have waste segregation areas the solid waste will be encouraged for segregation with all allottee the dustbin will be provided for collection in all location in this project and specfic agency will be asigned for collection of waste |
| Water Conservation System | A well designed rain water harvesting systems will be there in this project for recharge of PITS and other green areas |
| Energy Management System Including Use of Renewable Energy | The purpose of this project envisioned as a green sustainable buildings committed to envoirnment responsibility and resources efficiency throughout the project |
| Fire Protection And Fire Safety System | all fire norms will be carried out in this project as per approval and department |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Bagadpur Distt Moradabad |
| Branch Address | Teerthankar Mahavir University Bagadpur Pakbara UP 244001 Moradabad |
| Account Holder | Nischay Housing Pvt ltd Collection A/C for Gulmohar Park |
| Account Number | 6010002900000068 |
| IFSC Code | PUNB0601000 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in