New Launch - India Real Estate Report 2026.

GULSHAN DYNASTY MORADABAD

GULSHAN HOMZ PRIVATE LIMITED

Moradabad, Uttar Pradesh

RERA approved

Approved

1st Jul 2023

Completion pending

Pending

31st Aug 2027

Registration No.

UPRERAPRJ686395

Project Type

Residential

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ686395
Project StatusNew
Project CategoryResidential
DistrictMoradabad
TalukaMoradabad
Start Date2023-07-01
Completion Date2027-08-31
Total Area (sqm)49903
Project Cost (Lacs)31102
Duration (Months)50
Registration Fee255500

Promoter Details

Promoter NameGULSHAN HOMZ PRIVATE LIMITED
Promoter IDUPRERAPRM11443
Mobile76********

Project Team

rolename
ArchitectVishal sharma
ContractorGulshan Homz Private Limite
Structural EngineerDr. Gyan Singh

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-10, Sector 04, New Moradabad55085

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
COMMERCIAL BLOCKGFSHOP1658.650
COMMERCIAL BLOCKGFSHOP1350.370
COMMERCIAL BLOCKGFSHOP1350.370
COMMERCIAL BLOCKGFSHOP1511.610
COMMERCIAL BLOCKGFSHOP1511.180
COMMERCIAL BLOCKGFSHOP1502.030
COMMERCIAL BLOCKGFSHOP1511.610
COMMERCIAL BLOCKGFSHOP1511.610
COMMERCIAL BLOCKGFSHOP1511.610
COMMERCIAL BLOCKGFSHOP1510.320
COMMERCIAL BLOCKGFSHOP1418.400
COMMERCIAL BLOCKGFSHOP194.510
COMMERCIAL BLOCKGFSHOP1101.180
BLOCK AB - 1GFOTHER2554.560
BLOCK AB - 2GFOTHER2554.560
BLOCK AB - 3GFOTHER2554.560
BLOCK AB - 4GFOTHER2554.560
BLOCK AB - 5GFOTHER2554.560
BLOCK AB - 6GFOTHER2554.560
BLOCK AB - 7GFOTHER2554.560
BLOCK AB - 8GFOTHER2554.560
BLOCK AB - 9GFOTHER2554.560
BLOCK AB - 10GFOTHER2554.560
BLOCK AB - 11GFOTHER2554.560
BLOCK AB - 12GFOTHER2554.560
BLOCK AB - 13GFOTHER2554.560
BLOCK AB - 14GFOTHER2554.560
BLOCK AB - 15GFOTHER2554.560
BLOCK AB - 16GFOTHER2554.560
BLOCK AB - 17GFOTHER2554.620
BLOCK AB - 18GFOTHER2554.560
BLOCK AB - 19GFOTHER2544.560
BLOCK AB - 20GFOTHER2554.560
BLOCK AB - 21GFOTHER2554.560
BLOCK AB - 22GFOTHER2554.560
BLOCK AB - 23GFOTHER2554.560
BLOCK AB - 24GFOTHER2554.560
BLOCK AB - 25GFOTHER2554.560
BLOCK AB - 26GFOTHER2554.560
BLOCK AB - 27GFOTHER2554.560
BLOCK AB - 28GFOTHER2554.560
BLOCK AB - 29GFOTHER2554.560
BLOCK AB - 30GFOTHER2554.560
BLOCK AB - 31GFOTHER2554.560
BLOCK AB - 32GFOTHER2554.560
BLOCK AB - 33GFOTHER2554.560
BLOCK AB - 35GFOTHER2554.560
BLOCK AB - 36GFOTHER2554.560
BLOCK AB - 37GFOTHER2554.560
BLOCK AB - 38GFOTHER2554.560
BLOCK AB - 39GFOTHER2554.560
BLOCK AB - 40GFOTHER2554.560
BLOCK AB - 34GFOTHER2554.560
BLOCK AB - 41GFOTHER2554.560
BLOCK AB - 42GFOTHER2554.560
BLOCK AB - 43GFOTHER2554.560
BLOCK AB - 44GFOTHER2554.560
BLOCK AB - 45GFOTHER2554.560

Development Works

work_namedescription
Demarcation of PlotsAs per lease plan.
Boundary Wall2.4m high boundary wall. Consists of brickwork with stone cladding up to 1.5m Form 1.5m to 2.4m , is constructed out of MS members.
Road Work7.5 m wide internal pathway finished in a combination of stone slabs and green scaping.
Footpathsstone paving as per landscape architect s intent.
Water Supply Including Drinking Water FacilitiesMunicipal water supply is collected in an underground storage reservoir. Underground storage of water is also required and reserve for firefight purpose. It is proposed to provide static storage for firefighting as per the present requirement of NCB. To prevent the stagnation of the water in the static storage tank, water will overflow into the storage chamber for the domestic requirement. This system would ensure the availability of static storage for firefighting all the times. It is proposed to provide 01 day storage for total water requirement . Over head storage tanks are proposed to be placed on the terrace . It is proposed to have approximately half day requirement storage in the domestic and flushing water storage chamber. In addition, there would be static storage for firefighting purposes also, as per national Building Code.
Sewer SystemThe soil and from toilets and kitchen will be collected in single network of sewer pipes running under the basement celling . It is proposed to install sewage treatment plant on the site for treatment of sewage.
DrainThe terrace and balconies of the buildings are proposed to be drained by means of down take pipes while open areas and roads would be drained into drains. These drains are proposed to be aligned along the roads within the Complex as per the landscape design The down take pipes from terraces and balconies would discharge into or over an inlet to the surface drains of the Complex. The drains shall be finally discharged into the municipal drainage system after passing through rain water harvesting and ground water recharging structures.
ParksLandscaping of the parks with plantation including trees shrubs and ground covers and recreational benches and walkway proposed landscape area in the project is 4320 sqmt.
Tree PlantingAs per landscape drawing.
Design For Electric Supply Including Street LightingThe building shall be suppled power by the State Electricity Board. Since the source is unstable due to frequent brown out /black out , it is proposed that full DG power backup shall be provided to all the common services and apartments. .Some critical load such as a emergency lighting, headed equipment of ELV system etc., shall be additionally backed up using UPS (Battery backup) system. The electrical power requirement for the project has been estimated based on (at the rate) 50 watt/sq. mtr of FAR area of the apartment.(as per UP electricity authority). Lighting for streets car park area , landscape areas, walkways (both covered and uncovered) shall be controlled by static timer for energy saving. LED shall be used to in all common area and external lighting yo reduce power consumption.
Community BuildingsClub house as per plan having Multi purpose Hall, Gym, Gaming zone, cafeteria, spa/salon, senior lounge etc,
Treatment and Disposal System of Sewage and Sullage waterIt is proposed to install sewage treatment plant on the site for treatment of sewage. The quantity of recycle water required in flushing, horticulture shall be treatment up to tertiary level and the balance waste shall be discharged into municipal drainage system after treatment. total capacity of sewage Treatment plant =100 KLD
Solid Waste Management And Disposal SystemSegregation of soild waste
Water Conservation Systema. The operation of pumps will be based on level sensors to ensure that water is not wasted and to avoid unnecessary operation of the equipment. b. Pumps and equipment will be selected on "best" energy efficiency point. c. water Conservation will be provided using low flow fixtures / flow restrictors. d. Dual-flushing cisterns will reduce water consumption. The tower consumption in dual flush will be (at the rate)maximum 3 liters for low flush and (at the rate)6 liters for high flush. e. Sensor based urinals will be install to ensure flushing only when in use to reduce the water consumption. f. provision of sewage treatment plant is proposed to treat 100 percent waste water generated. g. Recycle of treated effluent will reduce the total net fresh water demand of the project. Thereby reducing the load and dependency on municipal supply. h. Irrigation system management will be provided by providing latest irrigation systems i.e. sprinkler system, time based controller , water metering etc. to reduce the water consumption in horticulture. i. rain water harvesting and ground water recharging for roof and non-roof areas is provided. The total volumetric capacity of recharge structures shall be as required by the regulations. j. Water metering will be provided for landscape water consumption, treated waste consumption , swimming pool and water fountain consumption and bot water consumption through system.
Energy Management System Including Use of Renewable Energya. ALL lifts shall be provided with AC variable voltage, variable frequency drives (ACVVF). b. Power factor shall be maintained 0.90 to unity. c. timer shall be used switch on / off parking lights during non- peak hours for power conservation . d. LED shall be used to in all common area and external lighting to reduce power consumption. e. Controller based synchronization along with PLC based load management is proposed to reduce the oil consumption and effective utilization of DG Sets. f. All DG Sets will be CPCB certified for noise and emissions. g. The exhaust pipes of DG Sets will be taken up as per CPCB guide lines. h. lighting power density ( LPD) values of all common areas and external / street lighting will be maintained at or below ECBC value by providing energy efficient light fixtures and LED s. The lux levels will be provided as per NCB. I. Metering will be install on all sub feeders related to common services viz. Water supply Pumps, Firefighting pumps, Sewage treatment plant, Elevators, Ventilation, External area lighting etc. j. Pump should be BEE 4-star rated or minimum 7percent efficiency for pumps of capacity greater than 3 HP and ISI certified pumps for other and motor should be BEE4-star rated or minimum 85 percent efficiency for motors of capacity greater than 3HP and ISI certified motors for others. k. Low loss transformers will Provided as per latest Is 1180 (2014) Part-1 (latest ammendment with energy efficiency level -1 . I. The exit signage power consumption shall be less than 5 watt/face
Fire Protection And Fire Safety SystemThe entire mix land use project has been divided in to tow zones depending upon its usages and category , Zone I- One or tow family private dwellings residential building less than 15m in height Zone-II - Club house Assembly building Above than 10m But not exceeding 15 m in height . the entire fire safety installation shall be compliant with the most stringent codes standard for the entire Township to ensure the highest safety standard and uniformity of system Refer NB C- 2016 attachement for reference. interanal and external fire hydrant system shall be provided with landing valve, hose reel with shut off nozzle, short branch pipe With nozzle and fire mans axe. Automatic Sprinkler system is provided The system shall be suitably zoned for its Optimum requiremests In oreder to detect the fire/smoke in incipient stages an intelligent/ Addressable automatic fire detection alarm system is proposed to be provided to cover all areas to provide timely waring to accupants to evacuate safely before the fire/ smoke spreads. The system shall be fully zoned addressable digital self diagnostic and cover all internal and external areas.
Social Infrastructure And Other Public Amenities Including Public Health ServicesClub swimming pool etc.
Emergency Evacuation ServicesFire starecase to be provided as per sanction plan
Other Miscellaneous WorkNot Availble

Bank Details

Bank NameICICI BANK LTD
BranchMORADABAD
Branch AddressICICI BANK LTD PLOT NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINE MORADABAD
Account HolderGulshan Homz Private Limited Collection A/C Gulshan Dyanasty Moradabad
Account Number777705019001
IFSC CodeICIC0000190

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy