New Launch - India Real Estate Report 2026.

VILASAA BY RAHEJAS

VEENU ARORA

Moradabad, Uttar Pradesh

RERA approved

Approved

1st Nov 2024

Completion pending

Pending

31st Oct 2026

Registration No.

UPRERAPRJ143235/01/2025

Project Type

Residential

District

Moradabad

Taluka

Moradabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ143235/01/2025
Project StatusNew
Project CategoryResidential
DistrictMoradabad
TalukaMoradabad
Start Date2024-11-01
Completion Date2026-10-31
Total Area (sqm)18342.76
Project Cost (Lacs)460
Duration (Months)24
Registration Fee98000

Promoter Details

Promoter NameVEENU ARORA
Promoter IDUPRERAPRM294860
Mobile97********

Project Team

rolename
ArchitectAASHRAY ARORA
ContractorSADHAN KUMAR MANDAL
Structural EngineerSANDEEP GEETA AND ASSOCIATES PVT. LTD.

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra8458095
Khasra846, 8476340
Khasra8483730
Khasra824360

Development Works

work_namedescription
Demarcation of PlotsTHE PROJECT CONSISTS OF 60 PLOTS RANGING FROM 135-300 SQM.
Boundary WallPERIPHERAL COMPOUND WALL COMPRISING FOUNDATION AND MASONRY WALL INCLUDING PLASTERING AND PAINTING AS PER DESIGN, MEASURING 2 METERS HIGH AND 324 RUNNING METERS.
Road WorkTHE PROJECT CONSISTS OF A ROAD NETWORK VARYING FROM 7.5M TO 12 M. ALL ROADS WILL BE LAID IN AN AREA MEASURING 4030 SQM.
FootpathsPAVERED FOOTPATH IS PLANNED ALONG SIDE THE ROAD ADMEASURING 1488.9 SQM.
Water Supply Including Drinking Water FacilitiesWATER TANKS WITH ADEQUATE DISTRIBUTION MECHANISM AND CONNECTION THROUGH UNDERGROUND PIPELINES. ONE UNDERGROUND TANK IS INCLUDED WITH 1800 CUBIC LITRES CAPACITY.
Sewer SystemSEWAGE SYSTEM IS PROPOSED AND SHALL BE CONNECTED TO THE MUNICIPAL SEWAGE SYSTEM. 34 MANHOLES ARE ALSO PROPOSEDSPANNING OVER 489 RUNNING METERS.
DrainA SEWER DRAIN WILL BE USED AND MEASURING 1131 SQM, AND STORM WATER FROM ROADS AND OTHER LANDSCAPE AREAS SHALL BE CONNECTED TO THE SEWER DRAINANGE CHANNEL AND OVERFLOW SHALL CONNECT WITH THE MUNICIPAL DRAIN LINE.
ParksTHE GREEN AREA WILL BE PROVIDED WITH FACILITIES AND AMENITIES FOR OTHER ACTIVITIES, THE GREEN AREA WILL BE SPREAD ACROSS TWO PARKS HAVING TREES AND OTHER PLANTATIONS.
Tree PlantingDIFFERENT TYPES OF TREES WITH DIVERSE FAUNA AND VARIOUS SPECIES ALL THROUGH THE PROJECT.
Design For Electric Supply Including Street LightingTHE ELECTRICAL SUPPLY WILL BE PROVIDED IN ACCORDANCE WITH THE LOCAL ELECTRICITY BOARD.
Community BuildingsNA.
Treatment and Disposal System of Sewage and Sullage waterA MODULAR SEWARAGE SYSTEM IS PLANNED WITH 60 KGD WHICH SHALL BE CONNECTED WITH THE MUNICIPAL SEWARAGE SYSTEM.
Solid Waste Management And Disposal SystemADEQUATE GARBAGE COLLECTION AREA WILL BE PROVIDED FORTHE SOLID WASTE MANAGEMENT AS PER NORMS.
Water Conservation SystemA RAINWATER HARVESTING SYSTEM IS PLANNED FOR CONSERVATION AND TO IMPROVE THE GROUND WATER LEVEL CONSISTING OF 2 PITS FOR THE SAME.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI BANK LIMITED
BranchMORADABAD DELHI ROAD
Branch AddressMITTAL COMPLEX DELHI ROAD, OPP. SPRING FIELD SCHOOL, MORADABAD-244001
Account HolderVEENU ARORA COLLECTION A/C FOR VILASAA BY RAHEJAS
Account Number051405003524
IFSC CodeICIC0000514

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy