DWARIKA BALAJI LIG/EWS
DWARIKA BALAJI
Muzaffarnagar, Uttar Pradesh
Approved
1st Jul 2023
Pending
3rd Jun 2027
Registration No.
UPRERAPRJ170765/03/2025
Project Type
Residential
District
Muzaffarnagar
Taluka
Muzaffarnagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ170765/03/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Muzaffarnagar |
| Taluka | Muzaffarnagar |
| Start Date | 2023-07-01 |
| Completion Date | 2027-06-03 |
| Total Area (sqm) | 10475 |
| Project Cost (Lacs) | 2538 |
| Duration (Months) | 48 |
| Registration Fee | 57500 |
Promoter Details
| Promoter Name | DWARIKA BALAJI |
| Promoter ID | UPRERAPRM13063 |
| Mobile | 73******** |
Project Team
| role | name |
|---|---|
| Architect | Rishi Sahni |
| Contractor | Dwarika Balaji- Promoter itself |
| Structural Engineer | Mayank Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 8 | 954.97 |
| Khasra | 9 | 8297.06 |
| Khasra | 42 | 1223.30 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| BLOCK-01-EWS | GF | STUDIO | 45 | 20.168 | 0 |
| BLOCK-01-EWS | 1 | STUDIO | 45 | 20.168 | - |
| BLOCK-01-EWS | 2 | STUDIO | 45 | 20.168 | - |
| BLOCK-01-EWS | 3 | STUDIO | 45 | 20.168 | - |
| BLOCK-02-LIG | GF | 1 BHK | 13 | 29.085 | 0 |
| BLOCK-02-LIG | 1 | 1 BHK | 13 | 29.085 | - |
| BLOCK-02-LIG | 2 | 1 BHK | 13 | 29.085 | - |
| BLOCK-02-LIG | 3 | 1 BHK | 13 | 29.085 | - |
| BLOCK-03-LIG | GF | 1 BHK | 36 | 29.085 | 0 |
| BLOCK-03-LIG | 1 | 1 BHK | 36 | 29.085 | - |
| BLOCK-03-LIG | 2 | 1 BHK | 36 | 29.085 | - |
| BLOCK-03-LIG | 3 | 1 BHK | 36 | 29.085 | - |
| BLOCK-04-LIG | GF | 1 BHK | 8 | 29.085 | 0 |
| BLOCK-04-LIG | 1 | 1 BHK | 8 | 29.085 | - |
| BLOCK-04-LIG | 2 | 1 BHK | 8 | 29.085 | - |
| BLOCK-04-LIG | 3 | 1 BHK | 8 | 29.085 | - |
| BLOCK-05-EWS | GF | STUDIO | 12 | 20.168 | 0 |
| BLOCK-05-EWS | 1 | STUDIO | 12 | 20.168 | - |
| BLOCK-05-EWS | 2 | STUDIO | 12 | 20.168 | - |
| BLOCK-05-EWS | 3 | STUDIO | 12 | 20.168 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Out of total township, 10475.33 square meter plot having 1 main gate from road which has been has been completed. |
| Boundary Wall | 2 meter hight and 230 mm thick brick work and rcc work in column and beam. Boundary wall preparation work is under progress and will be completed after completion of construction work. |
| Road Work | from the main entrance gate we have 80 mm thick interlocking brick/rcc road, Road work is completed approx 85 percent and will be completed after completion of building construction work. |
| Footpaths | Approx 85 percent work of Footpaths work is completed |
| Water Supply Including Drinking Water Facilities | We have constructed 2 water tank in the township to supply water which will supply water . |
| Sewer System | All sewerage water shall be go to the STP which has been constructed in the township . |
| Drain | Strom water shall be provided. Strom water from roads and other landscape area shall be connected to the storm water drain channel and to to the rain water. Drain work is also under progress and about 85 percent work get completed. |
| Parks | We have provided green area with different activities which has already been completed in the township. |
| Tree Planting | Tree Plantation area is under this phases, It is part of overall township and have been completed under other phases. |
| Design For Electric Supply Including Street Lighting | we have designed and implemented the system as per electricity board and have considered centralized transformer, HT panel, LT panel, Feeder pillar for common services like external lighting, STP, pump room etc. |
| Community Buildings | This area is part of other phases under the township and not situated under this phase. |
| Treatment and Disposal System of Sewage and Sullage water | All sewerage water shall go to the STP and overflow from the STP shall be connected with municipal sewerage. STP has been constructed in the township. |
| Solid Waste Management And Disposal System | There is a proper garbage collection area provided for solid waste management which is situated in the township. |
| Water Conservation System | Flushing water demand shall be fulfill by STP treated water which is situated in the township. |
| Energy Management System Including Use of Renewable Energy | We will use LED light fitting in all areas which will help to reduce electricity consumption. In pump room also all the equipment shall have energy efficient motor. And we will suggest to residents also to use energy saving equipment. |
| Fire Protection And Fire Safety System | This is not part of this phases as it is part of other phases which is under progress. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | This is not part of this phases |
| Emergency Evacuation Services | This is not part of this phases |
| Other Miscellaneous Work | All other miscellaneous work is under progress and will be completed once the construction work is completed. |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | STATE BANK OF INDIA |
| Branch Address | RAILWAY ROAD, MUZAFFARNAGAR |
| Account Holder | DB_COLL A/C_DWARIKA BALAJI_LIG/EWS |
| Account Number | 42903984939 |
| IFSC Code | SBIN0000685 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





