DWARIKA BALAJI LIG/EWS

DWARIKA BALAJI

Muzaffarnagar, Uttar Pradesh

RERA approved

Approved

1st Jul 2023

Completion pending

Pending

3rd Jun 2027

Registration No.

UPRERAPRJ170765/03/2025

Project Type

Residential

District

Muzaffarnagar

Taluka

Muzaffarnagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ170765/03/2025
Project StatusNew
Project CategoryResidential
DistrictMuzaffarnagar
TalukaMuzaffarnagar
Start Date2023-07-01
Completion Date2027-06-03
Total Area (sqm)10475
Project Cost (Lacs)2538
Duration (Months)48
Registration Fee57500

Promoter Details

Promoter NameDWARIKA BALAJI
Promoter IDUPRERAPRM13063
Mobile73********

Project Team

rolename
ArchitectRishi Sahni
ContractorDwarika Balaji- Promoter itself
Structural EngineerMayank Gupta

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra8954.97
Khasra98297.06
Khasra421223.30

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BLOCK-01-EWSGFSTUDIO4520.1680
BLOCK-01-EWS1STUDIO4520.168-
BLOCK-01-EWS2STUDIO4520.168-
BLOCK-01-EWS3STUDIO4520.168-
BLOCK-02-LIGGF1 BHK1329.0850
BLOCK-02-LIG11 BHK1329.085-
BLOCK-02-LIG21 BHK1329.085-
BLOCK-02-LIG31 BHK1329.085-
BLOCK-03-LIGGF1 BHK3629.0850
BLOCK-03-LIG11 BHK3629.085-
BLOCK-03-LIG21 BHK3629.085-
BLOCK-03-LIG31 BHK3629.085-
BLOCK-04-LIGGF1 BHK829.0850
BLOCK-04-LIG11 BHK829.085-
BLOCK-04-LIG21 BHK829.085-
BLOCK-04-LIG31 BHK829.085-
BLOCK-05-EWSGFSTUDIO1220.1680
BLOCK-05-EWS1STUDIO1220.168-
BLOCK-05-EWS2STUDIO1220.168-
BLOCK-05-EWS3STUDIO1220.168-

Development Works

work_namedescription
Demarcation of PlotsOut of total township, 10475.33 square meter plot having 1 main gate from road which has been has been completed.
Boundary Wall2 meter hight and 230 mm thick brick work and rcc work in column and beam. Boundary wall preparation work is under progress and will be completed after completion of construction work.
Road Workfrom the main entrance gate we have 80 mm thick interlocking brick/rcc road, Road work is completed approx 85 percent and will be completed after completion of building construction work.
FootpathsApprox 85 percent work of Footpaths work is completed
Water Supply Including Drinking Water FacilitiesWe have constructed 2 water tank in the township to supply water which will supply water .
Sewer SystemAll sewerage water shall be go to the STP which has been constructed in the township .
DrainStrom water shall be provided. Strom water from roads and other landscape area shall be connected to the storm water drain channel and to to the rain water. Drain work is also under progress and about 85 percent work get completed.
ParksWe have provided green area with different activities which has already been completed in the township.
Tree PlantingTree Plantation area is under this phases, It is part of overall township and have been completed under other phases.
Design For Electric Supply Including Street Lightingwe have designed and implemented the system as per electricity board and have considered centralized transformer, HT panel, LT panel, Feeder pillar for common services like external lighting, STP, pump room etc.
Community BuildingsThis area is part of other phases under the township and not situated under this phase.
Treatment and Disposal System of Sewage and Sullage waterAll sewerage water shall go to the STP and overflow from the STP shall be connected with municipal sewerage. STP has been constructed in the township.
Solid Waste Management And Disposal SystemThere is a proper garbage collection area provided for solid waste management which is situated in the township.
Water Conservation SystemFlushing water demand shall be fulfill by STP treated water which is situated in the township.
Energy Management System Including Use of Renewable EnergyWe will use LED light fitting in all areas which will help to reduce electricity consumption. In pump room also all the equipment shall have energy efficient motor. And we will suggest to residents also to use energy saving equipment.
Fire Protection And Fire Safety SystemThis is not part of this phases as it is part of other phases which is under progress.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThis is not part of this phases
Emergency Evacuation ServicesThis is not part of this phases
Other Miscellaneous WorkAll other miscellaneous work is under progress and will be completed once the construction work is completed.

Bank Details

Bank NameSTATE BANK OF INDIA
BranchSTATE BANK OF INDIA
Branch AddressRAILWAY ROAD, MUZAFFARNAGAR
Account HolderDB_COLL A/C_DWARIKA BALAJI_LIG/EWS
Account Number42903984939
IFSC CodeSBIN0000685

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy