NUMAX CITY- 1 MUZAFFARNAGAR

NUMAX REALCON PRIVATE LIMITED

Muzaffarnagar, Uttar Pradesh

RERA approved

Approved

1st Oct 2025

Completion pending

Pending

23rd Jun 2030

Registration No.

UPRERAPRJ619809/08/2025

Project Type

Residential

District

Muzaffarnagar

Taluka

Muzaffarnagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ619809/08/2025
Project StatusNew
Project CategoryResidential
DistrictMuzaffarnagar
TalukaMuzaffarnagar
Start Date2025-10-01
Completion Date2030-06-23
Total Area (sqm)144577
Project Cost (Lacs)13304
Duration (Months)57
Registration Fee728000

Promoter Details

Promoter NameNUMAX REALCON PRIVATE LIMITED
Promoter IDUPRERAPRM358427
Mobile99********

Project Team

rolename
ArchitectVishal Mittal
ContractorStar Associate
Structural EngineerMohd. Zulquer Nain

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra14061282
Khasra14203470
Khasra1426184
Khasra14273045
Khasra1410M123
Khasra1375/13890
Khasra1379/1411433
Khasra143690
Khasra14542995
Khasra1425/310417
Khasra1424M1325
Khasra1439/12985
Khasra1469M2315
Khasra1462175
Khasra1452M70
Khasra13803937
Khasra138312039
Khasra13841685
Khasra1388160
Khasra1375/25445
Khasra1407/1768
Khasra13926156
Khasra1379/189141
Khasra1394M21820
Khasra1382M1160
Khasra1392100
Khasra1420144
Khasra1420/21234
Khasra1380163
Khasra13901124
Khasra13946350
Khasra139613190
Khasra1379/148157
Khasra1381M190
Khasra1397M305
Khasra12170
Khasra1/9751430
Khasra1K/9752660
Khasra366M1250

Development Works

work_namedescription
Demarcation of PlotsLayout of the site according to both the survey and the approved layout plan using a total station.
Boundary WallPrecast boundary wall of 6 ft height.
Road WorkRoad finished with trimix/ concrete pavers as per design and laid over compacted earth, granular subbase (GSB), WBM, PCC (1.4.8) and sand bed.
FootpathsInterlocking Concrete Pavers
Water Supply Including Drinking Water FacilitiesThe portable water supply of desired quality and purity shall be ensured by tapping underground water. The primary treatment facility shall be ensured before making it supplied to the use of people.
Sewer SystemAn efficiently designed sewerage system connected to STP.
DrainEfficient underground drainage system proposed. The surface runoff from the road, open spaces and area other than roof tops will be transported through the system to the nearest existing water body for thy harvesting and the overflow from the water bodies will be disposed off in the existing drain.
ParksGreenery Development in township is proposed in the park. These green spaces are provided with the sectors creating healthy and moderate environment for the residents of township.
Tree PlantingPlant local species trees on the boundaries, roads, parks and on the common areas.
Design For Electric Supply Including Street LightingThe proposed township shall supply electric supply through 33 KV Sub- Station from where power shall be supplied at 11 KV level through Various underground 11 KV Feeders to the distribution transformers of 11 KV/433 KV variation and the LT underground distribution system.
Community BuildingsCommunity building with various community activities proposed in township.
Treatment and Disposal System of Sewage and Sullage waterTreatment and disposal system of sewage and sullage water shall be treated in the STP proposed in the various zones in the township.
Solid Waste Management And Disposal SystemAs all waste shall be segregated at source only after that all the organic waste generated in the township shall be used in the township after its treatment to make it zero waste discharge township. however the E-waste and toxic waste and recyclable waste shall be handed over to agency suggested by MDA, else we shall hand over such waste to the hired government approved solid waste management agency .
Water Conservation SystemEvery household shall get piped water supply through a designed system and no area shall be allowed to install their own individual system of water supply. i.e Jet pumps, Hand Pumps, Individual Borwell
Energy Management System Including Use of Renewable EnergySolar light in the park/common and EWS/LIG area shall be provided partially to save the energy.
Fire Protection And Fire Safety SystemA reserve for fire fighting has proposed in the township.
Social Infrastructure And Other Public Amenities Including Public Health ServicesIn the new Township social infrastructure such as school , Community centres, Club, Post office, etc are provided to make this township convenient for living.
Emergency Evacuation ServicesSufficient open spaces provided in the township for the gathering of people in emergency.
Other Miscellaneous WorkN.A

Bank Details

Bank NamePunjab National Bank
BranchPNB Industrial Area , Muzaffarnagar
Branch AddressPNB Industrial Area , Muzaffarnagar, Meerut Road, Opposite Shah Times, Muzaffarnagar,U.P- 251003
Account HolderNumax Realcon Pvt ltd. Collection Account - Numax City-1, Muzaffarnagar
Account Number2514002900000092
IFSC CodePUNB0251400

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy