VASUNDHARA SMART CITY PHASE-II
VASUNDHARA INFRA BUILD PVT.LTD.
Muzaffarnagar, Uttar Pradesh
Approved
1st Dec 2023
Pending
7th Jun 2028
Registration No.
UPRERAPRJ727500/01/2024
Project Type
Residential
District
Muzaffarnagar
Taluka
Muzaffarnagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ727500/01/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Muzaffarnagar |
| Taluka | Muzaffarnagar |
| Start Date | 2023-12-01 |
| Completion Date | 2028-06-07 |
| Total Area (sqm) | 36113 |
| Project Cost (Lacs) | 6308 |
| Duration (Months) | 55 |
| Registration Fee | 186000 |
Promoter Details
| Promoter Name | VASUNDHARA INFRA BUILD PVT.LTD. |
| Promoter ID | UPRERAPRM77722 |
| Mobile | 70******** |
Project Team
| role | name |
|---|---|
| Architect | SIDDHARTH JAIN |
| Contractor | Aas Mohammad |
| Structural Engineer | ASHRAF ALI |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 2305 PART, 2312 PART | 3215 |
| Khasra | 2307 PART, 2316 PART | 2050 |
| Khasra | 2307 PART | 1563 |
| Khasra | 2307 PART | 2140 |
| Khasra | 2309 | 2200 |
| Khasra | 2305 PART, 2312 PART | 16075 |
| Khasra | 2316 | 2050 |
| Khasra | 2306 | 380 |
| Khasra | 2310 | 8320 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | DEMARCTAION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SET BACKS. |
| Boundary Wall | BOUNDARY WALL AT SITE WILL BE MADE OF FLY ASH/CLAY BRICKS WITH COLUMN BEAM STRUCTURE, THE HEIGHT OF THE BOUNDARY WALL WILL BE 06 FEET, PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED. |
| Road Work | CONCRETE/APEX ROAD WILL BE MADE AT THE SITE.THE SITE VASE OF THE ROAD WILL BE FILLED BY RED MURAM, AFTER THAT TWOL LAYER OF AGGREGATE WILL BE LAYEDTO MAKE SURE THAT THE ROAD IS UPTO THE MARK , AFTER THIS THE TOPLAYER WILL BE COLOURED , BLACK WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE. |
| Footpaths | LAYING OF INTERLOCKING PAWERS OF 40 MM OVER WELL COMPACTED SUBGRADE WITH GSB LAYERS. |
| Water Supply Including Drinking Water Facilities | FRESH WATER SUPPLY LINE FROM UNDERGROUND TANK TO INDIVIDUAL PLOTS WITH PROPER VALVES AS PER MEP DRAWING. AND WATER SUPPLYWE HAVE A PROVISION OF BOARING. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. |
| Sewer System | SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE. ALL WATER DRAIN WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENT PLANT . THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION. |
| Drain | DRAIN WILL BE MADE BELOW THE FOOTHPATHS WITH CHAMBERS. DRAIN WILL BE MADE WITH BRICKWORK AND PCV PIPE OF DIFFERENT DIA.THE WATER WILL COME THROUGH PVC PIPE AND THIS DRAINS AND A PROPER SLOP WILL BE MENTIONED IN STP PLANT. THE WATER WILL GET COLLECTED THROUGH DRAINS IN STP PLANT. |
| Parks | PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SITOUT SPACE ETC. |
| Tree Planting | TREE WILL BE PLANTED AROUND 400 IN NUMBER ALL OVER THE PROJECT AND IN THE GARDEN AS WELL |
| Design For Electric Supply Including Street Lighting | IRON POLES WITH STREET LIGHT WILL BE PLACED ALL OVERTHE PROJECT AND PROPER ELECTRIFICATION WITH TRANSFORMER AND WIRINGWILL BE DONE AS SHOWN IN THE LAYOUT. ELECTRIFICATION WILL BE DONE IN ALL PLOTS ALSO WITH ISI MARKS WIRES, MODULAR SWITCHESWITH PROPER EARTHING ARRANGMENTS. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | TREATMENT AND SIPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER WILL BE COLLECTED FROM DIFFRENT SOURCES WILL BE COLLECTED AT ON PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORK LIKE GARDING, WASHING THE COMMON AREA AS ETC. |
| Solid Waste Management And Disposal System | DESIGNATED AREA FOR COLLECTIONAND LOADING OF GARBAGE WITH DUSTBINS HAS BEEN PROVIDED. |
| Water Conservation System | INSTALLATIN OF RAIN WATER HARVESTING SYSTEM FOR PERCOLATIN OF RAINWATER TO MAINTAIN THE LOCAL GROUND WATER LEVELS AS PER APPROVED NORMS AND MEP DRAWINGS. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA , LUSH GREEN GARDEN. |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | SBI, MUZAFFARNAGAR |
| Branch Address | KHASRA NO 904, JANSATH ROAD, MUZAFFARNAGAR |
| Account Holder | V.I.B.P.L COLL A/C VASUNDHARA SMART CITY PHASE II |
| Account Number | 42167621380 |
| IFSC Code | SBIN0061196 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in