CITIZEN EWS LIG HOUSING SCHEME
ABHIYAAN BUILDCON PRIVATE LIMITED
Prayagraj, Uttar Pradesh
Approved
20th Sept 2021
Completed
19th Dec 2024
Registration No.
UPRERAPRJ781821
Project Type
Residential
District
Prayagraj
Taluka
Phulpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ781821 |
| Project Status | Completed |
| Project Category | Residential |
| District | Prayagraj |
| Taluka | Phulpur |
| Start Date | 2021-09-20 |
| Completion Date | 2024-12-19 |
| Total Area (sqm) | 2492 |
| Project Cost (Lacs) | 900 |
| Duration (Months) | 39 |
| Registration Fee | 17500 |
Promoter Details
| Promoter Name | ABHIYAAN BUILDCON PRIVATE LIMITED |
| Promoter ID | UPRERAPRM7626 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | ANIL KUMAR GUPTA |
| Contractor | RAJAN KUMAR BIND |
| Structural Engineer | ER OMKAR VERMA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1091 | 3740 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| LIG TOWER A | GF | 1 BHK | 4 | 31.14 | 0 |
| LIG TOWER A | 1 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER A | 2 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER A | 3 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER B | GF | 1 BHK | 4 | 31.14 | 0 |
| LIG TOWER B | 1 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER B | 2 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER B | 3 | 1 BHK | 4 | 31.14 | - |
| LIG TOWER C | GF | 1 BHK | 6 | 31.14 | 0 |
| LIG TOWER C | 1 | 1 BHK | 6 | 31.14 | - |
| LIG TOWER C | 2 | 1 BHK | 6 | 31.14 | - |
| LIG TOWER C | 3 | 1 BHK | 6 | 31.14 | - |
| EWS TOWER A | GF | 1 BHK | 4 | 25.75 | 0 |
| EWS TOWER A | 1 | 1 BHK | 4 | 25.75 | - |
| EWS TOWER A | 2 | 1 BHK | 4 | 25.75 | - |
| EWS TOWER A | 3 | 1 BHK | 4 | 25.75 | - |
| EWS TOWER C | GF | 1 BHK | 6 | 25.75 | 0 |
| EWS TOWER C | 1 | 1 BHK | 6 | 25.75 | - |
| EWS TOWER C | 2 | 1 BHK | 6 | 25.75 | - |
| EWS TOWER C | 3 | 1 BHK | 6 | 25.75 | - |
| EWS TOWER B | GF | 1 BHK | 4 | 25.75 | 0 |
| EWS TOWER B | 1 | 1 BHK | 4 | 25.75 | - |
| EWS TOWER B | 2 | 1 BHK | 4 | 25.75 | - |
| EWS TOWER B | 3 | 1 BHK | 4 | 25.75 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | NOT APPLICABLE |
| Boundary Wall | BOUNDARY WALL COMPLETED WITH COLUMN WITH PILING AND 9 INCH BRICK WORK WITH COMPOUND LED LIGHT AND WHITE WASH |
| Road Work | 3 METER WIDE SET BACK ROAD MADE WITH CEMENT CONCRETE. APPROACH ROAD UP TO THE PROJECT MADE WITH INTERLOCKING PAVERS OVER WBM. |
| Footpaths | NOT APPLICABLE |
| Water Supply Including Drinking Water Facilities | FROM OVERHEAD WATER TANK SUPPLIED BY BOREWELL AS PER WATER SUPPLY PLAN ATTACHED UNDER UPLOAD DOCUMENT SECTION |
| Sewer System | SEWAGE TREATMENT PLANT (STP) WILL BE SETUP. SEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICED PLAN OF THE PROJECT |
| Drain | PROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES BEING UPLOADED |
| Parks | GREEN AREA AS PER APPROVED MAP |
| Tree Planting | 30 NOS (15 ASHOK TREE AND 15 CHITWAN TREE) |
| Design For Electric Supply Including Street Lighting | INFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL. PROJECT ELECTRIC PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION. |
| Community Buildings | NOT APPLICABLE AS PER EWS LIG POLICY |
| Treatment and Disposal System of Sewage and Sullage water | SEWAGE TREATMENT PLANT AND DRAINAGE SYSTEM WILL BE SETUP. DETAILS OF THE PLAN HAS BEEN PROVIDED IN UNDER THE SERVICES PLAN HAS BEEN ATTACHED UNDER UPLOAD DOCUMENT SECTION |
| Solid Waste Management And Disposal System | WILL BE PROVIDED AS PER NAGAR NIGAM NORMS. DETAILS OF THE PLAN HAS BEEN PROVIDED IN THE SERVICES PLAN IT HAS BEEN ATTACHED IN THE UPLOAD SECTION |
| Water Conservation System | RAIN WATER HARVESTING WILL BE PROVIDED AS APPROVED LOCATION AFTER THE COMPLETION OF PROJECT AND APPLICABLE NOC FROM THE BHU JAL GARBH VIBHAG WILL BE TAKEN |
| Energy Management System Including Use of Renewable Energy | 50 WATT SOLAR STREET LIGHT WILL BE PROVIDED WITHIN THE COMPOUND AT DESIRED LOCATION AS PER ARCHITECT INSTRUCTION |
| Fire Protection And Fire Safety System | AS APPLICABLE UNDER FIRE SAFETY NORMS. FIRE EXTINGUISHER AND HOSE REEL WILL BE PROVIDED IN ALL FLOOR. FIRE HYDRANT WILL BE PROVIDED IN SUITABLE LOCATION FOR EASY ACCESS BY FIRE TENDER |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NOT APPLICABLE |
| Emergency Evacuation Services | AS PER APPLICABLE NORMS OF FIRE DEPARTMENT. ASSEMBLY POINT WILL BE PROVIDED IN DESIGNATED AREA |
| Other Miscellaneous Work | AS APPLICABLE |
Bank Details
| Bank Name | INDIAN BANK |
| Branch | CIVIL LINES PRAYAGRAJ |
| Branch Address | 22 PD TONDON RA |
| Account Holder | ABHIYAAN BUILDCON PVT LTD RERA COLLECTION AC FOR CITIZEN EWS LIG HOUSING SCHEME |
| Account Number | 7083825038 |
| IFSC Code | IDIB000C629 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





