CITIZEN RAM NIVAS
CITIZEN INFRAVENTURES PVT LTD
Prayagraj, Uttar Pradesh
Approved
1st May 2024
Pending
21st Mar 2029
Registration No.
UPRERAPRJ859361/08/2024
Project Type
Residential
District
Prayagraj
Taluka
Allahabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ859361/08/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Prayagraj |
| Taluka | Allahabad |
| Start Date | 2024-05-01 |
| Completion Date | 2029-03-21 |
| Total Area (sqm) | 6113.54 |
| Project Cost (Lacs) | 9800 |
| Duration (Months) | 59 |
| Registration Fee | 36500 |
Promoter Details
| Promoter Name | CITIZEN INFRAVENTURES PVT LTD |
| Promoter ID | UPRERAPRM9344 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | AR. VATRIKA SINGH |
| Contractor | ABHIYAAN BUILDCON PRIVATE LIMITED |
| Structural Engineer | DR. SANTOSH KUMAR |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 115A | 6290.81 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | BSMNT | OTHER | 0 | 0 | - |
| 1 | GF | OTHER | 0 | 0 | 0 |
| 1 | 1 | OTHER | 0 | 0 | - |
| 1 | 2 | 2 BHK | 4 | 74.94 | - |
| 1 | 2 | 2 BHK | 1 | 75 | - |
| 1 | 2 | 2 BHK | 1 | 69.64 | - |
| 1 | 2 | 2 BHK | 1 | 68.71 | - |
| 1 | 2 | 3 BHK | 5 | 89.43 | - |
| 1 | 3 | 2 BHK | 1 | 75 | - |
| 1 | 3 | 2 BHK | 2 | 71.5 | - |
| 1 | 3 | 2 BHK | 1 | 69.64 | - |
| 1 | 3 | 2 BHK | 1 | 68.71 | - |
| 1 | 3 | 3 BHK | 5 | 89.43 | - |
| 1 | 4 | 2 BHK | 4 | 74.94 | - |
| 1 | 4 | 2 BHK | 1 | 75 | - |
| 1 | 4 | 2 BHK | 2 | 71.5 | - |
| 1 | 4 | 2 BHK | 1 | 69.64 | - |
| 1 | 4 | 2 BHK | 1 | 68.71 | - |
| 1 | 4 | 3 BHK | 5 | 89.43 | - |
| 1 | 4 | 3 BHK | 2 | 89.88 | - |
| 1 | 5 | 2 BHK | 4 | 74.94 | - |
| 1 | 5 | 2 BHK | 1 | 75 | - |
| 1 | 5 | 2 BHK | 2 | 71.5 | - |
| 1 | 5 | 2 BHK | 1 | 69.64 | - |
| 1 | 5 | 2 BHK | 1 | 68.71 | - |
| 1 | 5 | 3 BHK | 5 | 89.43 | - |
| 1 | 5 | 3 BHK | 2 | 89.88 | - |
| 1 | 6 | 2 BHK | 4 | 74.94 | - |
| 1 | 6 | 2 BHK | 1 | 75 | - |
| 1 | 6 | 2 BHK | 2 | 71.5 | - |
| 1 | 6 | 2 BHK | 1 | 69.64 | - |
| 1 | 6 | 2 BHK | 1 | 68.71 | - |
| 1 | 6 | 3 BHK | 5 | 89.43 | - |
| 1 | 6 | 3 BHK | 2 | 89.88 | - |
| 1 | 7 | 2 BHK | 4 | 74.94 | - |
| 1 | 7 | 2 BHK | 1 | 75 | - |
| 1 | 7 | 2 BHK | 2 | 71.5 | - |
| 1 | 7 | 2 BHK | 1 | 69.64 | - |
| 1 | 7 | 2 BHK | 1 | 68.71 | - |
| 1 | 7 | 3 BHK | 5 | 89.43 | - |
| 1 | 7 | 3 BHK | 2 | 89.88 | - |
| 1 | 8 | 2 BHK | 4 | 74.94 | - |
| 1 | 8 | 2 BHK | 1 | 75 | - |
| 1 | 8 | 2 BHK | 2 | 71.5 | - |
| 1 | 8 | 2 BHK | 1 | 69.64 | - |
| 1 | 8 | 2 BHK | 1 | 68.71 | - |
| 1 | 8 | 3 BHK | 5 | 89.43 | - |
| 1 | 8 | 3 BHK | 2 | 89.88 | - |
| 1 | 9 | 2 BHK | 4 | 74.94 | - |
| 1 | 9 | 2 BHK | 1 | 75 | - |
| 1 | 9 | 2 BHK | 2 | 71.5 | - |
| 1 | 9 | 2 BHK | 1 | 69.64 | - |
| 1 | 9 | 2 BHK | 1 | 68.71 | - |
| 1 | 9 | 3 BHK | 5 | 89.43 | - |
| 1 | 9 | 3 BHK | 2 | 89.88 | - |
| 1 | 10 | 2 BHK | 4 | 74.94 | - |
| 1 | 10 | 2 BHK | 1 | 75 | - |
| 1 | 10 | 2 BHK | 2 | 71.5 | - |
| 1 | 10 | 2 BHK | 1 | 69.64 | - |
| 1 | 10 | 2 BHK | 1 | 68.71 | - |
| 1 | 10 | 3 BHK | 5 | 89.43 | - |
| 1 | 10 | 3 BHK | 2 | 89.88 | - |
| 1 | 11 | 2 BHK | 4 | 74.94 | - |
| 1 | 11 | 2 BHK | 1 | 75 | - |
| 1 | 11 | 2 BHK | 2 | 71.5 | - |
| 1 | 11 | 2 BHK | 1 | 69.64 | - |
| 1 | 11 | 2 BHK | 1 | 68.71 | - |
| 1 | 11 | 3 BHK | 5 | 89.43 | - |
| 1 | 11 | 3 BHK | 2 | 89.88 | - |
| 1 | 12 | 2 BHK | 4 | 74.94 | - |
| 1 | 12 | 2 BHK | 1 | 75 | - |
| 1 | 12 | 3 BHK | 5 | 89.43 | - |
| 1 | 13 | 2 BHK | 4 | 74.94 | - |
| 1 | 13 | 2 BHK | 1 | 75 | - |
| 1 | 13 | 3 BHK | 5 | 89.43 | - |
| 1 | 14 | 2 BHK | 4 | 74.94 | - |
| 1 | 14 | 2 BHK | 1 | 75 | - |
| 1 | 14 | 3 BHK | 5 | 89.43 | - |
| 1 | 3 | 2 BHK | 4 | 74.94 | - |
| 1 | 3 | 3 BHK | 2 | 89.88 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | PLOT HAS BEEN BOUNDED WITH BOUNDARY WALL. DIMENSION OF PROPERTY NORTH TO SOUTH TOWARDS EAST = 202.6 FEET. NORTH TO SOUTH TOWARDS WEST= 197 FEET. EAST TO WEST TOWARDS NORTH= 339 FEET. EAST TO WEST TOWARDS SOUTH= 339 FEET. |
| Boundary Wall | BOUNDARY WALL WILL BE MADE WITH COLUMN WITH PILING AND 9INCH BRICK WORK UPTO 6FT HEIGHT WITH COMPOUND LED LIGHT AND WHITE WASH |
| Road Work | 12 MTR. WIDE SETBACK ROAD WITH USE OF CONCRETE AND GREEN BELT APPROACH ROAD TO THE PROJECT PART OF MASTER PLAN ROAD |
| Footpaths | PEDESTRIAN FOOTPATH (5 FT. WIDE) AND WALKING TRACK WILL BE CONSTRUCTED ALONG THE BUILDING SETBACK UPON COMPLETION OF CIVIL WORK. |
| Water Supply Including Drinking Water Facilities | UNDERGROUND TANK (2 NOS. OF 25000 LITER. EACH) WILL BE USED TO SUPPLY WATER FROM BOREWELL TO OVERHEAD WATER TANK SUPPLEMENTED BY NAGAR NIGAM SUPPLY AS PER SERVICE PLAN OF PROJECT |
| Sewer System | SEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICE PLAN OF THE PROJECT AND CONNECTED TO TRUNK NAGAR NIGAM SEWER LINE. DOWN SWR PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH. WHILE UNDERGROUND SEVER LINES RANGING BETWEEN 150MM TO 200MM ALONG WITH 2X2 FT MANHOLE CHAMBER WILL BE PROVIDED |
| Drain | PROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES PLAN BEING UPLOADED DOWN PVC PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH |
| Parks | GREEN AREA DEVELOPMENT OVER 700 SQ MTR WILL BE DONE UPON COMPLETION OF PROJECT. SUCH PARK AREA WILL BE DEVELOPED WITH TREE PLANTATION AND FLOWERING PLANTS AND EVERGREEN SHRUBS. THE PARK AREA WILL HAVE PARK BENCHES AND OUTDOOR LIGHTING. KIDS PLAY AREA WILL BE DEVELOPED WITH SWING AND PLAY PIT OVER 500 SQ .FT. AREA |
| Tree Planting | 35 NOS OF TREES WILL BE PLANTED INDIGENOUS SPECIES SUCH AS NEEM MANGO ASHOK ALONG WITH AVENUE TREES CHITWAN AMALTAS AND SHRUBS AND BUSHES AND HEDGES |
| Design For Electric Supply Including Street Lighting | INFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL PROJECT ELECTRICAL PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION. 3 NOS. TRANSFORMERS (400KVA, 250KVA, 250KVA) WILL BE INSTALLED DEPENDING ON THE SANCTIONED LOAD FOR THE PROJECT. ARMOURED CABLE 240MM WILL BE USED TO SUPPLY FROM TRANSFORMER TO BUSBAR SUBSEQUENTLY 16MM AND 10MM CABLE WILL BE USED TO CONNECT ELECTRICAL METERS TO FLAT SUPPLY. STREETS LIGHT OF 200 WATT AND LED COMPOUND LIGHT OF 12 WATT WILL BE PROVIDED THROUGHOUT THE CAMPUS. |
| Community Buildings | COMMUNITY AREA WILL BE DEVELOPED ON THE FIRST FLOOR OF THE BUILDING WITH SPACE FOR INDOOR GAME GYM AND LAP POOL. TOTAL AREA EARMARKED ON THE FIRST FLOOR FOR COMMUNITY AREA = 5000 SQ. FT. |
| Treatment and Disposal System of Sewage and Sullage water | SEWAGE AND DRAINAGE SYSTEM WILL BE SETUP AS PER NORMS DEFINED BY PDA AND NAGAR NIGAM. DETAILED DRAWING OF SUCH INFRASTRUCTURE WILL BE PRESENTED ALONG WITH COMPLETION DRAWING. |
| Solid Waste Management And Disposal System | BEING IN THE HEART OF THE CITY AND BARELY 2 KM FROM NAGAR NIGAM HEAD QUARTER SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE MANAGED BY THE AUTHORITY ON PAYMENT OF REQUISITE FEE FROM USERS. |
| Water Conservation System | RAIN WATER HARVESTING WILL BE PROVIDED AS PER THE APPROVED DRAWING OF THE PROJECT AND UPON COMPLETION OF THE PROJECT AS PER NORMS AND NOC WILL BE TAKEN FROM BHU JAL GARBH VIBHAG. RAIN WATER HARVESTING PIT WILL BE DEVELOPED AT TWO LOCATIONS WITHIN THE PREMISES WITH TOTAL CAPACITY = 36 CUBIC MTR. WHICH WILL SUFFICE FOR THE TERRACE AREA OF THE PROPOSED BUILDING. |
| Energy Management System Including Use of Renewable Energy | CONVENTIONAL ENERGY MANAGEMENT AND EFFICIENT USE ALONG WITH USE OF RENEWABLE ENERGY WILL BE ENGAGED AT SUITABLE LOCATION WITH IN THE PROJECT. THE PROJECT IS ENVISIONED WITH OPTIMUM USE OF SOLAR POWER. (SOLAR PANEL OF 5 KW WITH SOLAR INVERTER WILL BE PROVIDED FOR COMMON AREA USAGE). COMMON AREA LIGHTING IN CORRIDOR WILL BE LED BASED. RAIN WATER HARVESTING EV CHARGING ALONG WITH DAY TIME LIGHTING USING MAXIMUM SUNLIGHT AMONG OTHER INITIATIVES. |
| Fire Protection And Fire Safety System | THE PROJECT HAS BEEN GRANTED PROVISIONAL NOC BY THE FIRE DEPARTMENT, ALL CONDITION LAID DOWN IN THE ATTACHED NOC WILL BE ADHERED TO. AS APPLICABLE UNDER FIRE SAFETY NORMS FIRE EXTINGUISHER AND HOSE REEL ALONG WITH FIRE ALARM WILL BE PROVIDED. MS PIPE OF 150MM B-CLASS ALONG WITH 100MM, 32MM,25MM DIAMETER ALONG WITH BUTTERFLY VALVE 150MM AND 100MM WILL BE USED PRESSURE GAUGE AIR VALVE 25MM WILL BE PROVIDED. HOSE REEL SET 30 MTR AND HYDRANT VALVE 63MM SS. RRL HOSE 15MTR SS ALONG WITH HOSE BOX CABINET WILL BE PROVIDED. 3 NOS FIRE PUMP 360MM TERRACE PUMP ALONG WITH STARTER PANEL. FIRE ALARM SYSTEM WITH PA. FIRE EXTINGUISHER ABC TYPE 6 KG=50 NOS AND CO2 TYPE 4.5 KG= 25 NOS WILL BE USED. AUTOMATED WATER SPRINKLER PENDENT TYPE WILL BE USED IN BASEMENT. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | PROJECT IS LOCATED IN VICINITY OF CBD AND IN CLOSE PROXIMITY TO PUBLIC AND PRIVATE HOSPITAL, SCHOOLS, POLICE STATION AND OTHER SOCIAL AND PUBLIC AMENITIES AND EMERGENCY SERVICES. |
| Emergency Evacuation Services | AS PER NORMS OF THE FIRE DEPARTMENT AND PROVISIONAL NOC PROVIDED BY THE FIRE DEPARTMENT DESIGNATED 2 NOS ASSEMBLY POINT (2000 SQ FT EACH) WILL BE DEVELOPED WITHIN THE PROJECT TO ENABLE EVACUATION IN CASE OF EMERGENCY. |
| Other Miscellaneous Work | OTHER MISCELLANEOUS WORKS WILL BE CARRIED OUT AS PER INSTRUCTION FROM PROJECT ARCHITECT, MEP CONSULTANT, OTHER CONSULTANT AND DEVELOPMENT AUTHORITY. |
Bank Details
| Bank Name | INDIAN BANK |
| Branch | HINDI SAHITYA SAMMELAN BRANCH |
| Branch Address | 12 KP KAKKAR ROAD, PRAYAGRAJ |
| Account Holder | CITIZEN INFRAVENTURE-COLLECTION ACCOUNT FOR CITIZEN RAM NIVAS |
| Account Number | 7767644320 |
| IFSC Code | IDIB000A580 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate