Paras Ramayana

Triveni Buildzone Private Limited

Prayagraj, Uttar Pradesh

RERA approved

Approved

11th Sept 2020

Project completed

Completed

10th Sept 2025

Registration No.

UPRERAPRJ577368

Project Type

Residential

District

Prayagraj

Taluka

Phulpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ577368
Project StatusCompleted
Project CategoryResidential
DistrictPrayagraj
TalukaPhulpur
Start Date2020-09-11
Completion Date2025-09-10
Total Area (sqm)4720
Project Cost (Lacs)3200
Duration (Months)60
Registration Fee29000

Promoter Details

Promoter NameTriveni Buildzone Private Limited
Promoter IDUPRERAPRM128354
Mobile77********

Project Team

rolename
ArchitectManish Gujral
ContractorDeen Bandhu Shaw
Structural EngineerDr Santosh Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra6574720

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A14 BHK1109.68-
A14 BHK1109.68-
A13 BHK187.27-
A13 BHK182.77-
A13 BHK182.77-
A13 BHK187.11-
A12 BHK158.3-
A12 BHK163.75-
A12 BHK169.97-
A12 BHK168.183-
A11 BHK135-
A11 BHK133.46-
A11 BHK132.2-
A12 BHK155.52-
A24 BHK1109.68-
A24 BHK1109.68-
A23 BHK187.27-
A23 BHK182.77-
A23 BHK182.77-
A23 BHK187.11-
A22 BHK158.3-
A22 BHK163.75-
A22 BHK169.97-
A22 BHK168.183-
A21 BHK135-
A21 BHK133.46-
A21 BHK132.2-
A22 BHK155.52-
A34 BHK1109.68-
A34 BHK1109.68-
A33 BHK187.27-
A33 BHK182.77-
A33 BHK182.77-
A33 BHK187.11-
A32 BHK158.3-
A32 BHK163.75-
A32 BHK169.97-
A32 BHK168.183-
A31 BHK135-
A31 BHK133.46-
A31 BHK132.2-
A32 BHK155.52-
A44 BHK1109.68-
A44 BHK1109.68-
A43 BHK187.27-
A43 BHK182.77-
A43 BHK182.77-
A43 BHK187.11-
A42 BHK158.3-
A42 BHK163.75-
A42 BHK169.97-
A42 BHK168.183-
A41 BHK135-
A41 BHK133.46-
A41 BHK132.2-
A42 BHK155.52-
A54 BHK1109.68-
A54 BHK1109.68-
A53 BHK187.27-
A53 BHK182.77-
A53 BHK182.77-
A53 BHK187.11-
A52 BHK158.3-
A52 BHK163.75-
A52 BHK169.97-
A52 BHK168.183-
A51 BHK135-
A51 BHK133.46-
A51 BHK132.2-
A52 BHK155.52-
A64 BHK1109.68-
A64 BHK1109.68-
A63 BHK187.27-
A63 BHK182.77-
A63 BHK182.77-
A63 BHK187.11-
A62 BHK158.3-
A62 BHK163.75-
A62 BHK169.97-
A62 BHK168.183-
A61 BHK135-
A61 BHK133.46-
A61 BHK132.2-
A62 BHK155.52-
A74 BHK1109.68-
A74 BHK1109.68-
A73 BHK187.27-
A73 BHK182.77-
A73 BHK182.77-
A73 BHK187.11-
A72 BHK158.3-
A72 BHK163.75-
A72 BHK169.97-
A72 BHK168.183-
A71 BHK135-
A71 BHK133.46-
A71 BHK132.2-
A72 BHK155.52-
A84 BHK1109.68-
A84 BHK1109.68-
A83 BHK187.27-
A83 BHK182.77-
A83 BHK182.77-
A83 BHK187.11-
A82 BHK158.3-
A82 BHK163.75-
A82 BHK169.97-
A81 BHK135-
A81 BHK133.46-
A81 BHK132.2-
A82 BHK155.52-
A94 BHK1109.68-
A94 BHK1109.68-
A93 BHK187.27-
A93 BHK182.77-
A93 BHK182.77-
A93 BHK187.11-
A92 BHK158.3-
A92 BHK163.75-
A92 BHK169.97-
A92 BHK168.183-
A91 BHK135-
A91 BHK133.46-
A91 BHK132.2-
A92 BHK155.52-
A104 BHK1109.68-
A104 BHK1109.68-
A103 BHK187.27-
A103 BHK182.77-
A103 BHK182.77-
A103 BHK187.11-
A102 BHK158.3-
A102 BHK163.75-
A102 BHK169.97-
A102 BHK168.183-
A101 BHK135-
A101 BHK133.46-
A101 BHK132.2-
A102 BHK155.52-
A114 BHK1109.68-
A114 BHK1109.68-
A113 BHK187.27-
A113 BHK182.77-
A113 BHK182.77-
A113 BHK187.11-
A112 BHK158.3-
A112 BHK163.75-
A112 BHK169.97-
A112 BHK168.183-
A112 BHK176.5-
A113 BHK195.8-
A124 BHK1109.68-
A124 BHK1109.68-
A123 BHK187.27-
A123 BHK182.77-
A123 BHK182.77-
A123 BHK187.11-
A122 BHK158.3-
A122 BHK163.75-
A122 BHK169.97-
A122 BHK168.183-
A122 BHK176.5-
A123 BHK195.8-
A134 BHK1109.68-
A134 BHK1109.68-
A133 BHK187.27-
A133 BHK182.77-
A133 BHK182.77-
A133 BHK187.11-
A132 BHK158.3-
A132 BHK163.75-
A132 BHK169.97-
A132 BHK168.183-
A132 BHK176.5-
A133 BHK195.8-
A143 BHK1116.42-
A144 BHK1145.84-
A82 BHK168.18-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of size 4720 sq. mtr. having 1 main entrance gate from the 60 m wide front road.
Boundary Wall2.5 m high and Brick work and RCC work in column and beam.
Road WorkFrom the main entrance gate we have 60 mm thick interlocking brick/RCC road throughout the project whose wideness is 13 mts. approx.
FootpathsThe project consists of roads only and no footpath is being provided.
Water Supply Including Drinking Water FacilitiesWe will provide two nos. of pump for the requirement of blocks through underground pipelines
Sewer SystemModular Sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall be connect with the Municipal Sewerage system . when come into force
DrainStorm water shall be provided. Storm water from Roads and other landscape area shall be connect to the storm water drain channel and go to the Rain Water Harvesting pit for recharge the ground water and overflow shall be connect with municipal drain line.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall and green area
Design For Electric Supply Including Street LightingWe will design and implement the system as per local electricity board and will contain centralized Transformer , HT panel , LT panel ,Feeder Pillar and DG back for common service like External lighting Fountain, STP, Pump room etc.
Community BuildingsCommunity hall of 176 sq. mtr. is provided having Gym facility and club house
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be provided. All sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system when come in force.
Solid Waste Management And Disposal SystemThere is a proper garbage collection area provided for the solid waste management
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in the external area . In pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use the energy efficient lights.
Fire Protection And Fire Safety SystemThis project has only residential flats. Hence we will provide fire fighting facility in common areas while individual owner can install there own system as per there local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe same is not being provided in the project
Emergency Evacuation ServicesWe have proposed common pump room. All sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water
Other Miscellaneous WorkConvenient shops will be provided in the project

Bank Details

Bank NameBank of Baroda
BranchMG Marg Allahabad
Branch AddressBank of Baroda Main Branch MG Road Allahabad 211001
Account HolderTriveni Buildzone Private Limited
Account Number00640200002427
IFSC CodeBARB0ALLAHA

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy