New Launch - India Real Estate Report 2026.

Park View - The Park 33

Vinayakkripa Abhaydata Ventures LLP

Prayagraj, Uttar Pradesh

RERA approved

Approved

1st Nov 2021

Completion pending

Pending

31st Aug 2026

Registration No.

UPRERAPRJ995416

Project Type

Residential

District

Prayagraj

Taluka

Allahabad **

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ995416
Project StatusNew
Project CategoryResidential
DistrictPrayagraj
TalukaAllahabad **
Start Date2021-11-01
Completion Date2026-08-31
Total Area (sqm)6105
Project Cost (Lacs)8409
Duration (Months)58
Registration Fee36000

Promoter Details

Promoter NameVinayakkripa Abhaydata Ventures LLP
Promoter IDUPRERAPRM156617
Mobile97********

Project Team

rolename
ArchitectSHIVARPIT KATOSH
ContractorDINABANDHU SHAW
Structural EngineerPIYUSH AGARWAL

Land Details

typekhasra_or_plot_noarea_sqmt
Plot59/103, Dayanand Marg (Thornhill road), Allahabad6105

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
AGFOTHER000
A13 BHK1172.85-
A13 BHK1172.04-
A23 BHK1176.14-
A23 BHK1175.34-
A33 BHK1176.14-
A33 BHK1175.34-
A43 BHK1176.14-
A43 BHK1175.34-
A54 BHK1362.71-
BGFOTHER000
B15 BHK1284.55-
B13 BHK1165.26-
B12 BHK1137.85-
B12 BHK1141.19-
B14 BHK1238.73-
B25 BHK1284.55-
B23 BHK1165.26-
B22 BHK1137.85-
B22 BHK1141.19-
B24 BHK1238.73-
B35 BHK1284.55-
B33 BHK1165.26-
B32 BHK1137.85-
B32 BHK1141.19-
B34 BHK1238.73-
B45 BHK1284.55-
B43 BHK1165.26-
B42 BHK1137.85-
B42 BHK1141.19-
B44 BHK1238.73-
B55 BHK1284.55-
B53 BHK1165.26-
B52 BHK1137.85-
B52 BHK1141.19-
B54 BHK1238.73-
B65 BHK1284.55-
B63 BHK1165.26-
B62 BHK1137.85-
B62 BHK1141.19-
B64 BHK1238.73-
B75 BHK1284.55-
B73 BHK1165.26-
B72 BHK1137.85-
B72 BHK1141.19-
B74 BHK1238.73-
B85 BHK1284.55-
B83 BHK1165.26-
B82 BHK1137.85-
B82 BHK1141.19-
B84 BHK1238.73-
B95 BHK1284.55-
B93 BHK1165.26-
B92 BHK1137.85-
B92 BHK1141.19-
B94 BHK1238.73-
B105 BHK1284.55-
B103 BHK1165.26-
B102 BHK1137.85-
B102 BHK1141.19-
B104 BHK1238.73-
B115 BHK1284.55-
B113 BHK1165.26-
B112 BHK1137.85-
B112 BHK1141.19-
B114 BHK1238.73-
B124 BHK1395.27-

Development Works

work_namedescription
Demarcation of PlotsThe proposed development is a housing scheme therefore no demarcation of plot is required.
Boundary WallBoundary wall shall be RCC framed with brick and electrical work to secure all site and shall be as per municipal building bye laws.
Road WorkRoad work shall be tremix along with hardscape with appropriate slope and drainage works.
FootpathsIt shall be done on the eastern and southern side of Block b. it would be approximately 4"-0" wide to be done in tiles and tremix.
Water Supply Including Drinking Water FacilitiesWater supply shall be stored in domestic water tank in basement and shall be pumped to the overhead tanks. the portable water shall then be supplied to all residential units by gravity.
Sewer SystemThe sewerage shall be done underground RCC pipes connected with manholes at appropriate locations and it shall be deposited off to municipal sewer.
DrainSite drainage shall be done via drains all the road side. the terrace water shall be drained to the rain water harvesting system and excess of it shall be drained along with site drainage
Parks11.71 percentage green at 715.38 sq. mt. has been proposed.
Tree Planting36 no. of trees shall be placed as required by building bye laws.
Design For Electric Supply Including Street LightingElectric supply shall be done via cable from main supply. a transformer along with meter room and DC has been proposed in the site layout.
Community BuildingsCommunity building with an area of 307.97 sq. mt. has been proposed.
Treatment and Disposal System of Sewage and Sullage waterSeweage and waste water shall be disposed of the municipal sewer.
Solid Waste Management And Disposal SystemBlock-A block A has 9 flats in 5 floors, 2 flats on 4 floors and a penthouse on the 5th floor. the garbage shall be handpicked from each flat. each flat shall have 2 disposed bins for wet waste and dry waste shall be collected seperately. block-B block B has 56 flats in 12 floors with 5 flats on each floor. a vertical garbage chute is proposed which leads to the garbage collection in the basement. the garbage from the basement shall be collected by municipal corporation. the waste collected from block A and block B shall be disposed off at waste disposal site earmarked for same.
Water Conservation SystemFor water conservation RWH (rain water harvesting system) proposed on site.
Energy Management System Including Use of Renewable EnergySolar pannels are proposed on roof terrace provided as per building bye laws.
Fire Protection And Fire Safety SystemIt shall be as per NBC 2016
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommunity facilities with isolation room proposed.
Emergency Evacuation ServicesFire escape staircase with fire lifts proposed as per NBC 2016
Other Miscellaneous WorkProposed as per building byelaws and NBC 2016

Bank Details

Bank NameTHE FEDERAL BANK LIMITED
BranchPRAYAGRAJ BRANCH
Branch AddressPRAYAGRAJ BRANCH
Account HolderVINAYAKKRIPA ABHAYDATA VENTURES LLP- COLLECTION A/C FOR PARK VIEW
Account Number13920200013922
IFSC CodeFDRL0001392

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy