Saidham Shree Kaleshwar Dham
JMD INFRAESTATE PRIVATE LIMITED
Prayagraj, Uttar Pradesh
Approved
18th Mar 2021
Completed
30th Jun 2025
Registration No.
UPRERAPRJ464541
Project Type
Residential
District
Prayagraj
Taluka
Karchhana
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ464541 |
| Project Status | Completed |
| Project Category | Residential |
| District | Prayagraj |
| Taluka | Karchhana |
| Start Date | 2021-03-18 |
| Completion Date | 2025-06-30 |
| Total Area (sqm) | 3817 |
| Project Cost (Lacs) | 3000 |
| Duration (Months) | 52 |
| Registration Fee | 24500 |
Promoter Details
| Promoter Name | JMD INFRAESTATE PRIVATE LIMITED |
| Promoter ID | UPRERAPRM133848 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | SHIVARPIT KATOCH |
| Contractor | BILAL S K |
| Structural Engineer | D AND R CONSULTANT |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | 82 | 4260 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) |
|---|---|---|---|---|
| TOWER A | 1 | 3 BHK | 1 | 93.97 |
| TOWER A | 1 | 3 BHK | 1 | 90.49 |
| TOWER A | 1 | 3 BHK | 1 | 91.78 |
| TOWER A | 1 | 2 BHK | 1 | 65.14 |
| TOWER A | 1 | 2 BHK | 2 | 65.14 |
| TOWER A | 1 | 2 BHK | 1 | 74.32 |
| TOWER A | 1 | 2 BHK | 1 | 74.73 |
| TOWER A | 2 | 3 BHK | 1 | 93.97 |
| TOWER A | 2 | 3 BHK | 1 | 90.49 |
| TOWER A | 2 | 3 BHK | 1 | 91.78 |
| TOWER A | 2 | 2 BHK | 3 | 65.14 |
| TOWER A | 2 | 2 BHK | 1 | 74.32 |
| TOWER A | 2 | 2 BHK | 1 | 74.73 |
| TOWER A | 3 | 3 BHK | 1 | 93.97 |
| TOWER A | 3 | 3 BHK | 1 | 90.49 |
| TOWER A | 3 | 3 BHK | 1 | 91.78 |
| TOWER A | 3 | 2 BHK | 3 | 65.14 |
| TOWER A | 3 | 2 BHK | 1 | 74.32 |
| TOWER A | 3 | 2 BHK | 1 | 74.73 |
| TOWER A | 4 | 3 BHK | 1 | 93.97 |
| TOWER A | 4 | 3 BHK | 1 | 90.49 |
| TOWER A | 4 | 3 BHK | 1 | 91.78 |
| TOWER A | 4 | 2 BHK | 3 | 65.14 |
| TOWER A | 4 | 2 BHK | 1 | 74.32 |
| TOWER A | 4 | 2 BHK | 1 | 74.73 |
| TOWER A | 5 | 3 BHK | 1 | 93.97 |
| TOWER A | 5 | 3 BHK | 1 | 90.49 |
| TOWER A | 5 | 3 BHK | 1 | 91.78 |
| TOWER A | 5 | 2 BHK | 3 | 65.14 |
| TOWER A | 5 | 2 BHK | 1 | 74.32 |
| TOWER A | 5 | 2 BHK | 1 | 74.73 |
| TOWER A | 6 | 3 BHK | 1 | 93.97 |
| TOWER A | 6 | 3 BHK | 1 | 90.49 |
| TOWER A | 6 | 3 BHK | 1 | 91.78 |
| TOWER A | 6 | 2 BHK | 3 | 65.14 |
| TOWER A | 6 | 2 BHK | 1 | 74.32 |
| TOWER A | 6 | 2 BHK | 1 | 74.73 |
| TOWER A | 7 | 3 BHK | 1 | 93.97 |
| TOWER A | 7 | 3 BHK | 1 | 90.49 |
| TOWER A | 7 | 3 BHK | 1 | 91.78 |
| TOWER A | 7 | 2 BHK | 3 | 65.14 |
| TOWER A | 7 | 2 BHK | 1 | 74.32 |
| TOWER A | 7 | 2 BHK | 1 | 74.73 |
| TOWER A | 8 | 3 BHK | 1 | 93.97 |
| TOWER A | 8 | 3 BHK | 1 | 90.49 |
| TOWER A | 8 | 3 BHK | 1 | 91.78 |
| TOWER A | 8 | 2 BHK | 3 | 65.14 |
| TOWER A | 8 | 2 BHK | 1 | 74.32 |
| TOWER A | 8 | 2 BHK | 1 | 74.73 |
| TOWER A | 9 | 3 BHK | 1 | 73.34 |
| TOWER A | 9 | 3 BHK | 1 | 82.13 |
| TOWER A | 9 | 3 BHK | 1 | 82.95 |
| TOWER A | 9 | 2 BHK | 3 | 62.17 |
| TOWER A | 9 | 2 BHK | 1 | 69.88 |
| TOWER A | 9 | 2 BHK | 1 | 65.25 |
| TOWER A | 10 | 3 BHK | 1 | 95.56 |
| TOWER A | 10 | 3 BHK | 1 | 119.52 |
| TOWER A | 10 | 3 BHK | 1 | 89.36 |
| TOWER A | 10 | 2 BHK | 1 | 90.51 |
| TOWER A | 10 | 2 BHK | 1 | 103.39 |
| TOWER A | 11 | 3 BHK | 1 | 73.66 |
| TOWER A | 11 | 3 BHK | 1 | 82.69 |
| TOWER A | 11 | 2 BHK | 1 | 70.55 |
| TOWER A | 11 | 2 BHK | 1 | 76.98 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have plot of size 4260 Sq Meters out of which 443 Sq Meters of land reserved for Road widening and rest is used for said residential project. |
| Boundary Wall | All side of plot well covered from 230 m m thick and 2 meters high red bricks based boundary wall and at front a main entrance gate constructed. |
| Road Work | Internal drive way or road will be C C , with concrete pavers or equivalent finishes. |
| Footpaths | Wide footpath in thick concrete pavers or equivalent finishes |
| Water Supply Including Drinking Water Facilities | Ground Water will be used for all purpose through overhead water tank. Drinking water will be used after purification. A branded Purifier will be provided to all residents from us. |
| Sewer System | Through existing Municipal Sewer Line. All sewerage water shall go to the STP, and overflow from STP shall be connected with the Municipal sewerage system. |
| Drain | Storm Water System shall be provided.Storm water from roads and other Landscape area shall be connected to the storm water drain channel and go to the Rain Water Harvesting Pit for recharge the ground water and overflow shall be connected with Municipal drain line. |
| Parks | We will provide green area with different activities and the green area will have gaming facilities for kids. |
| Tree Planting | We will provide many types of trees as per the development authority norms. |
| Design For Electric Supply Including Street Lighting | We will design and implement the system as per the local electricity board and will consider Centralized transformer HT and LT panel Fedder Pillar and df back for common service like external lighting . |
| Community Buildings | A 900 Sq Feet community center shall be provided in basement area of the said project. |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be provided. All sewerage system shall go to STP, and overflow shall be connected with the Municipal Sewerage System |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | A well design Rain Water Harvesting System shall be provided for the whole building complex to conserve water as per requirements. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fittings in external and internal area of flat |
| Fire Protection And Fire Safety System | This project has only residential flat hence we will provide fire fitting facility in common area and as per the terms of Fire Department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not proposed |
| Emergency Evacuation Services | Fire exit staircase has been provided. |
| Other Miscellaneous Work | Temple and Swimming Pool provided. |
Bank Details
| Bank Name | Kotak Mahindra Bank |
| Branch | K.P. Kakkar Road |
| Branch Address | 92/99, K.P. Kakkar Road, Prayagraj 211003 |
| Account Holder | JMD Infraestate Private Limited - Collection A/c |
| Account Number | 1045597357 |
| IFSC Code | KBK0005076 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in