TRIDHARA

BRAND MARKETEERS

Prayagraj, Uttar Pradesh

RERA approved

Approved

15th Jul 2024

Completion pending

Pending

25th Apr 2029

Registration No.

UPRERAPRJ521702/10/2024

Project Type

Residential

District

Prayagraj

Taluka

Phulpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ521702/10/2024
Project StatusNew
Project CategoryResidential
DistrictPrayagraj
TalukaPhulpur
Start Date2024-07-15
Completion Date2029-04-25
Total Area (sqm)3533
Project Cost (Lacs)5899
Duration (Months)58
Registration Fee23000

Promoter Details

Promoter NameBRAND MARKETEERS
Promoter IDUPRERAPRM300220
Mobile93********

Project Team

rolename
ArchitectDHIRAH TIWARI
ContractorSHOBHA CONSTRUCTION
Structural EngineerREVTI RAMAN SINGH

Land Details

typekhasra_or_plot_noarea_sqmt
Plot2407,2408,2409,2411,2412, 56kha/33533

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower 113 BHK392.21-
Tower 113 BHK192.21-
Tower 112 BHK465.65-
Tower 133 BHK392.21-
Tower 133 BHK192.21-
Tower 132 BHK465.65-
Tower 142 BHK465.65-
Tower 153 BHK392.21-
Tower 153 BHK192.21-
Tower 152 BHK465.65-
Tower 163 BHK392.21-
Tower 123 BHK392.21-
Tower 123 BHK192.21-
Tower 122 BHK465.65-
Tower 112OTHER066.93-
Tower 1123 BHK292.21-
Tower 1122 BHK465.65-
Tower 1112 BHK465.65-
Tower 1113 BHK192.21-
Tower 1103 BHK392.21-
Tower 1103 BHK192.21-
Tower 1102 BHK465.65-
Tower 192 BHK465.65-
Tower 193 BHK192.21-
Tower 193 BHK392.21-
Tower 183 BHK392.21-
Tower 183 BHK192.21-
Tower 182 BHK465.65-
Tower 172 BHK465.65-
Tower 173 BHK192.21-
Tower 173 BHK392.21-
Tower 162 BHK465.65-
Tower 163 BHK192.21-
Tower 143 BHK192.21-
Tower 143 BHK392.21-
Tower 1113 BHK392.21-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of size 3533SQM. As per Deed 3533 SQM. As per Site having 1 main entrance gate from the 30 m wide front road. Abutting 6.00 mtr. Wide internal road the building block.
Boundary Wall2 m high and 30 mm thick brick work and rcc work in column and beam. at the center face of boundary wall there would be a logo of the project which give a beautiful iconic design to boundary wall.
Road Workfrom the main entrance gate we have 80 mm thich interlocking brick/RCC road through out the project. whose wideness starts from 8.00 mtr.
Footpathswe would not provide any footpath.
Water Supply Including Drinking Water Facilitieswe will provide two nos. of pump for the requirement of blocks through underground pipelines.
Sewer Systemmodular sewerage system shall be provided. all sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system. when come into force.
Drainstorm water shall be provided. storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connect with the municipal drain line.
Parkswe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree Plantingwe will provide many type of trees all along the boundary wall green area.
Design For Electric Supply Including Street Lightingwe will design implement the system as per local electricity board and will consider centralized transformer, HT panel, LT panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room rtc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be provided. All sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system, when come into force.
Solid Waste Management And Disposal Systemthere are a proper garbage collection area provided for the solid waste management.
Water Conservation Systemwe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable Energywe will use LED lights fitting in external area as well as solar lights. in pump room also all the equipment shall have energy efficient motor. and we will suggest to individual also to use.
Fire Protection And Fire Safety Systemthis project has only residential flats. hence we will provide fire fighting facility in common area while individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation Serviceswe have proposed common pump room. All sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water.
Other Miscellaneous WorkNA

Bank Details

Bank NameAXIS BANK LIMITED
BranchCIVIL LINES ALLAHABAD
Branch Address28 B, CIVIL STATION, M.G. MARG, CIVIL, LINES, ALLAHABAD,211001
Account HolderMS. BRAND MARKETEERS COLLECTION ACCOUNT FOR TRIDHARA PROJECT
Account Number924020020789522
IFSC CodeUTIB0000286

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy