New Launch - India Real Estate Report 2026.

Vardha Sky Castle

VARDHA DEVELCO PRIVATE LIMITED

Prayagraj, Uttar Pradesh

RERA approved

Approved

20th Feb 2024

Completion pending

Pending

20th Jan 2029

Registration No.

UPRERAPRJ384469/05/2024

Project Type

Residential

District

Prayagraj

Taluka

Allahabad **

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ384469/05/2024
Project StatusNew
Project CategoryResidential
DistrictPrayagraj
TalukaAllahabad **
Start Date2024-02-20
Completion Date2029-01-20
Total Area (sqm)2957
Project Cost (Lacs)3008
Duration (Months)60
Registration Fee20000

Promoter Details

Promoter NameVARDHA DEVELCO PRIVATE LIMITED
Promoter IDUPRERAPRM278989
Mobile93********

Project Team

rolename
ArchitectManish Gujral
ContractorChhedi Lal
Structural EngineerDR. SANTOSH KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra602MI, 603MI, 629MI2960

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower 113 BHK1106.73-
Tower 113 BHK1114.95-
Tower 112 BHK182.47-
Tower 112 BHK181.85-
Tower 112 BHK178.07-
Tower 112 BHK182.37-
Tower 113 BHK191.89-
Tower 113 BHK1110.75-
Tower 112 BHK187.07-
Tower 123 BHK1106.73-
Tower 123 BHK1114.95-
Tower 122 BHK182.47-
Tower 122 BHK181.85-
Tower 122 BHK178.07-
Tower 122 BHK182.37-
Tower 123 BHK191.89-
Tower 123 BHK1110.75-
Tower 122 BHK187.07-
Tower 133 BHK1106.73-
Tower 133 BHK1114.95-
Tower 132 BHK182.47-
Tower 132 BHK181.85-
Tower 132 BHK178.07-
Tower 132 BHK182.37-
Tower 133 BHK191.89-
Tower 133 BHK1110.75-
Tower 132 BHK187.07-
Tower 143 BHK1106.73-
Tower 143 BHK1114.95-
Tower 142 BHK182.47-
Tower 142 BHK181.85-
Tower 142 BHK178.07-
Tower 142 BHK182.37-
Tower 143 BHK191.89-
Tower 143 BHK1110.75-
Tower 142 BHK187.07-
Tower 153 BHK1106.73-
Tower 153 BHK1114.95-
Tower 152 BHK182.47-
Tower 152 BHK181.85-
Tower 152 BHK178.07-
Tower 152 BHK182.37-
Tower 153 BHK191.89-
Tower 153 BHK1110.75-
Tower 152 BHK187.07-
Tower 163 BHK1106.73-
Tower 163 BHK1114.95-
Tower 162 BHK182.47-
Tower 162 BHK181.85-
Tower 162 BHK178.07-
Tower 162 BHK182.37-
Tower 163 BHK191.89-
Tower 163 BHK1110.75-
Tower 162 BHK187.07-
Tower 174 BHK1166.899-
Tower 174 BHK1161.37-
Tower 173 BHK187.77-
Tower 174 BHK1199.29-
Tower 174 BHK1225.77-
Tower 184 BHK1177-
Tower 183 BHK1100.98-
Tower 184 BHK1165.048-
Tower 182 BHK170.12-
Tower 182 BHK1144.49-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of size 2957 sq. mtr.having 1 main entrance gate from the 12 MTR wide front road.
Boundary Wall1.50 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick /Interlocking brick road through out the project. Whose wideness starts from 6 mtr.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of pump for the requirement of blocks through underground pipelines.
Sewer SystemSewerage water shall go through out main sewer line and connect with Municipal Sewerage system when come into force
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksNA
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Pump room etc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterAll sewerage water shall go through sewer line and will connect with Municipal sewerage system when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemRain water harvesting system shall be provided to reduce the water consumption and improve ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThere will be appropriate provision of fire safety and fire protection in the project as per Fire safety norms
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNA

Bank Details

Bank NameBank Of Baroda
BranchKhuldabad
Branch Address32, Mirza Galib Road, Khuldabad, Prayagraj 211003
Account HolderVARDHA DEVELCO PRIVATE LIMITED COLLECTION ACCOUNT VARDHA SKY CASTLE
Account Number13630200000669
IFSC CodeBARB0KHULDA

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy